TheKaman K-MAX(company designationK-1200) is ahelicopterwithintermeshing rotors(synchropter) designed and produced by the American manufacturerKaman Aircraft.
K-1200 K-MAX | |
---|---|
General information | |
Type | Medium lift helicopter |
Manufacturer | Kaman Aircraft |
Status | Production ended, in service |
History | |
Manufactured | 1991–2003, 2015–2023 |
First flight | December 23, 1991 |
Developed during the 1980s and 1990s, the K-MAX builds on the work of the German aeronautical engineerAnton Flettner.Performing itsmaiden flighton December 23, 1991, it was specially designed to optimally performexternal cargo loadoperations and is capable of lifting payloads in excess of 6,000 pounds (2,700 kg), which is greater than the helicopter's empty weight and almost twice as much as the competingBell 205despite sharing a similar engine. Being a synchropter, it has greater efficiency in comparison to conventional rotor technology. In addition toairlifting external loads,specialised configurations foraerial firefightingandcasualty evacuationhave been developed. It was produced for both military and civilian operators.
Kaman sought to develop the K-MAX into anunmanned aerial vehiclewith optionalremote control.During the early 2010s, a pair of unmanned K-Maxes underwent an extended battlefield evaluation as a cargo UAV, for which purpose they were deployed to provide logistics support toUnited States Marine Corps(USMC) ground forces during thewar in Afghanistan.Despite receiving numerous awards, the K-MAX was ultimately passed over by the USMC in favour of an unmanned version of theBoeing H-6U Little Bird.The company stated its intention to continue development and to seek out other customers for this capability. An optionally-piloted configuration, branded as the ’’K-Max Titan’’, underwent flight testing in 2021.
The initial production run of the K-MAX ran between 1991 and 2003, at which point the line was shuttered after the completion of 38 helicopters due to low customer demand. During June 2015, Kaman announced that it was restarting production following the receipt of ten commercial orders for the K-MAX.[1]During May 2017, the first flight of a K-MAX built on the restarted production line took place; two months later, the first new-build aircraft since 2003 was delivered to a customer based in China. However, in January 2023, amid a downturn in demand, Kaman announced its intention to shutter production of the K-MAX once again.
Development
editBackground
editIn 1947, the German aeronautical engineerAnton Flettnerwas brought to the United States as part ofOperation Paperclip.[2]He was the developer of the two earliersynchropterdesigns from Germany during theSecond World War:theFlettner Fl 265which pioneered the synchropter layout, and the slightly laterFlettner Fl 282Kolibri( "Hummingbird" ), intended for eventual production. Both designs used the principle of counter-rotating side-by-side intermeshing rotors, as the means to solve the problem of torque compensation, normally countered in single–rotor helicopters by atail rotor,fenestron,NOTAR,or vented blower exhaust, which can use 10-25% of the engine power.[3]Flettner remained in the United States and became the chief designer of the Kaman company.[4]In this capacity, he designed numerous new helicopters that used the Flettner double rotor.
Design
editThe K-MAX series is the latest in a long line of Kamansynchropters,the most famous of which is theHH-43 Huskie.Thefirst turbine-powered helicopterwas also a Kaman synchropter.[5]HH-43 customers requested a similar helicopter from Kaman, optimized for lifting.[3]
Accordingly, the K-MAX relies on two primary advantages of synchropters over conventional helicopters: The increased efficiency compared to conventional rotor-lift technology; and the synchropter's natural tendency to hover. This increases stability, especially for precision work in placing suspended loads. At the same time, the synchropter is more responsive to pilot control inputs, making it possible to easily swing a load, or to scatter seed, chemicals, or water over a larger area. The K-MAX was flight certified in 1994.[3]
The K-1200 K-MAX "aerial truck" is the world's first helicopter specifically designed, tested, and certified for repetitive external lift operations and vertical reference flight (Kaman receivedIFR Certificationin 1999), an important feature for external load work. Other rotorcraft used for these tasks are adapted from general-purpose helicopters, or those intended to primarily carry passengers or internal cargo.
The K-MAX can lift 6,000 lb (2,700 kg), almost twice as much as theBell 205using a different version of the same engine.[6]The aircraft's narrow, wedge-shaped profile and bulging side windows give the pilot a good view of the load looking down&out from either side of the aircraft,[7]with the most important flight instruments duplicated on the outside of the aircraft, near the pilot's line of sight straight down to the load.[3]The cargo hook slides freely on a curved bearing under the helicopter'scenter of gravity,improving cargo handling during flight.[3]The seat is FAAcrashworthinessapproved.[3]
The transmission has a reduction ratio of 24.3:1 in three stages, and is designed for unlimited life.[8]The two rotor masts are set at an angle of 25 degrees apart to allow the rotors to intermesh with each other. The masts transfer rotation from the transmission to the rotor blades.[3]The rotor blades (which turn in opposite directions[6]at 250—270 rpm) are built with aSitka sprucewoodensparandNomexfiberglass trailing edge sections.[3]Wood was chosen for its damage tolerance and fatigue resistance; and to take advantage of field experience and qualification data amassed from a similar spar on the HH-43 Huskie helicopter, built for the U.S. Air Force in the 1950s and 1960s.[9]The pilot controls the blade pitch via steel tubes running inside the mast and rotor blades to moveservo flapsthat pitch the blades, reducing required force and avoiding the added weight, cost and maintenance ofhydraulic controls.[6][10]Due to the rotor principle, the helicopter is operated slightly differently compared to regular helicopters, and pilots go through a flight training program in an HH-43 Huskie.[6][3]
First termination of production
editBetween 1991 and 2003, thirty-eight K-MAX helicopters had been completed by Kaman.[11][12]In 2003, amid a wider downturn that impacted the whole aviation industry, it was decided to shutter the production line.[13]However, this move did not lead to development work being halted; instead, such initiatives were continued for an extended period and new partners on the programme were sought.[11]
Unmanned version
editAs early as 1998, Kaman was working on the development of an unmanned version of the K-MAX. During March 2007, Kaman andLockheed Martin(Team K-MAX) signed a Strategic Relationship Agreement (SRA) to jointly pursue U.S. DoD opportunities.[14][15]Anunmannedmostly autonomously flying, optionallyremote controlledandoptionally piloted vehicle(OPV) version, the K-MAX Unmanned Multi-Mission Helicopter was developed for hazardous missions. It can be used in combat to deliver supplies to the battlefield, as well as civilian situations involving chemical, biological, or radiological hazards. A prototype of this was shown in 2008 for potential military heavy-lift resupply use,[16]and again in 2010.[17]In December 2010, theNaval Air Systems Commandawarded a $46 million contract to Kaman for two aircraft,[18]and, in 2011, they completed a five-day Quick Reaction Assessment.[19]At the 2013Paris Air Show,Kaman promoted the unmanned K-MAX to foreign buyers, the company claimed that several countries had expressed interest in the system.[20]
During the mid-2010s, the unmanned K-MAX competed with theBoeing H-6U Little Birdto fulfil the Marine Corps unmanned lift/ISR requirement.[21]In April 2014, Marines atQuanticoannounced they successfully landed an unmanned K-MAX, as well as a Little Bird, autonomously using a hand held mini-tablet. The helicopters were equipped with Autonomous Aerial Cargo/Utility System (AACUS) technology, which combines advanced algorithms withLIDARand electro-optical/infrared sensors to enable a user to select a point to land the helicopter at an unprepared landing site.[22]TheOffice of Naval ResearchselectedAurora Flight Sciencesand the Unmanned Little Bird to complete development of the prototype AACUS system, however, Lockheed stated that it would continue to promote the K-MAX and develop autonomous cargo delivery systems.[23]
Second production run
editDuring February 2014, Kaman stated that it was looking into resuming K-MAX production, having recently received over 20 inquiries for firefighting, logging and industry transport requirements as well as requests for the military unmanned version. Ten firm orders convinced Kaman to put the design back into production again.[24][25][26]By 2014, the K-MAX fleet had cumulatively flown 300,000 hours and cost $1,200 per flight hour to operate.[26]
At Heli-Expo 2015 in Orlando, Kaman reported it was continuing to progress towards reopening the production line.[27]Following the receipt of multiple customer deposits, the assembly line was restarted in January 2017.[28]On 12 May 2017, Kaman test flew the first K-MAX to be produced since 2003;[29][30]on 13 July 2017, it was delivered to Kaman's Chinese sales agent Lectern Aviation, which delivered it onwards to Guangdong Juxiang General Aviation,Guangdong Provinceforfirefightingwith the second to be delivered the following week.[31][32]
To facilitate appropriate scheduling and preparations, Kaman needed to decide in 2017 whether to extend production beyond the first 10 K-MAX rotorcraft. During June 2017, Kaman made the decision to produce a further 10 aircraft, extending the production run into at least 2019.[33][34]In mid 2017, the company publicly commented that it expected to produce one K-MAX every eight weeks.[35]
Building on a three-year autonomy experiment in Afghanistan with the US Marine Corps,[36][37]Kaman was at one point pursuing development of the K-Max Titan, an optionally piloted variant intended for commercial customers to fly into dangerous zones likewildfiresornatural disasters,and for long operation with no pilot rest; it was claimed to be suitable for operating for up to 100 flight hours before requiring any mandatory inspections. Following FAA certification, the system was to be fitted on new and used helicopters outside the factory. In April 2021, the Titan technology took its first flight.[38][39]
On 18 January 2023, Kaman announced it will once again be ending the K-MAX production line later that year; its stated reasons for the closure were “low demand and variation in annual deliveries, coupled with low profitability and large working capital inventory requirements.” The line is scheduled to close in the first quarter of FY 2023 after completing a 60-platform production run.[40]Kaman noted that it would take a $54 million of non-cash charges on account of write-downs of existing inventory and aircraft alike.[11]
Operational history
editDuring 2008, a single K-MAX was used fordemolitionwork, having been outfitted with a 1,400 kg (3,000 lb)wrecking ballas aslung load.[41][42]
In December 2011, an unmanned K-MAX was reported to be at work in Afghanistan.[43]On 17 December 2011, the U. S. Marine Corps conducted the first unmanned aerial system cargo delivery in a combat zone using the unmanned K-MAX, moving about 3,500 pounds (1,600 kg) of food and supplies to troops at Combat Outpost Payne.[44][45]A third unmanned K-MAX in the U.S. was tested in 2012 to deliver cargo to a small homing beacon to achieve three-meter precision.[46]By February 2013, the K-MAX had delivered two million pounds (910 metric tons) of cargo across 600 unmanned missions, during which in excess of 700 flight hours had been recorded.[47]
On July 31, 2012, Lockheed announced a second service extension for the K-MAX in Afghanistan to support the Marine Corps;[48]on 18 March 2013, the Marine Corps announced the indefinite extension of its use of the unmanned K-MAX helicopters, stating that it would keep the two aircraft in use "until otherwise directed". At the time of the announcement, they had flown over 1,000 missions and hauled over three million pounds (1,400 metric tons) of supplies; assessments for their use after the deployment were also being studied.[49]The unmanned K-MAX has won awards fromPopular ScienceandAviation Week & Space Technology,[50]and was nominated for the 2012Collier Trophy.[51]
On June 5, 2013, one of the unmanned K-MAX helicopters crashed in Afghanistan while flying a resupply mission. No injuries occurred, the subsequent accident investigation ruled out both pilot error and mechanical issue,[52]the rotorcraft having been flying autonomously towards a predetermined point and performing during the final stages of cargo delivery at the time.[53]Operational flights of the remaining unmanned K-MAX were suspended following the crash, the Navy stating at that time that it could resume flying by late August. Early on, swing load was viewed as the crash's prime cause.[54]The investigation determined that the crash had been caused by unexpected tailwinds that the helicopter experienced while making the delivery, instead of headwinds, which caused it to begin oscillating. Operators employed aweathervane effectto try to regain control, but its 2,000 lb (910 kg) load began to swing, which exacerbated the effect and caused it to contact the ground. The accident report determined that it could have been prevented if pilots intervened earlier and mission planners received updated weather reports; diverging conditions and insufficient programming meant it could not recover on its own and required human intervention.[55]
The K-MAX supporting Marines in Afghanistan was planned to remain in use there until at least August 2014. The Marine Corps was looking into acquiring the unmanned K-MAX as aprogram of record,and theUnited States Armywas also looking into it to determine cost-effectiveness. In theater, the rotorcraft performed most missions at night and successfully lifted loads of up to 4,500 lb (2,000 kg). Hook-ups of equipment were performed in concert with individuals on the ground, however, Lockheed was looking into performing this action automatically through a device mounted atop the package that the helicopter can hook up to by itself; this feature was demonstrated in 2013.[56]Other features were being examined, including the ability to be automatically re-routed in flight, and to fly in formation with other aircraft.[57]The unmanned K-MAX was successfully able to deliver 30,000 lb (14,000 kg) of cargo in one day over the course of six missions (average 5,000 lb (2,300 kg) transported cargo per mission). Lockheed and Kaman discussed the purchasing of 16 helicopters with the Navy and Marine Corps for a baseline start to a program.[52]
In May 2014, both of the unmanned K-MAX helicopters in use by the Marine Corps returned to the U.S., shortly after the Corps had determined that they were no longer needed to support missions in Afghanistan. After deploying in December 2011, originally planned for six months, they operated in the region for almost three years and lifted 2,250 tons of cargo. While the equipment entered storage, the service contemplated the possibility of turning the unmanned K-MAX from a proof-of-concept project into a program of record. Formal requirements for unmanned aerial cargo delivery are being written to address expected future threats, includingelectronic attack,cyber warfare,and effective hostile fire; these were avoided in Afghanistan quickly and cheaply by flying at night at high altitudes against an enemy with no signal degradation capabilities.[58][59]Officials assessed the K-MAX helicopter that crashed and planned to repair it in 2015. The helicopters, ground control stations, and additional equipment are stored at Lockheed's facility in Owego.[60]The two unmanned K-MAXs, designatedCQ-24A,were to be moved to a Marine Corps base in Arizona by the end of September 2015 to develop tactics and operations concepts to inform an official program of record for a cargo UAV.[61]
During November 2014, Lockheed Martin demonstrated a fire fighting version,[27]another demonstration was performed in October 2015, in which the K-MAX delivered over 24,000 pounds (11,000 kg) of water in one hour.[62][63]In March 2015, acasualty evacuationexercise was performed in coordination with anunmanned ground vehicle(UGV) and mission planning system.[64]A medic launched the UGV to evaluate the casualty, used a tablet to call in and automatically land the K-MAX, then strapped a mannequin to a seat aboard the helicopter.[65]
By January 2015, 11 K-MAX helicopters were reportedly no longer airworthy, some of which had been written off in accidents. Furthermore, an additional five were in storage at Kaman.[66][67]By March 2015, the number of operational K-MAXs was reportedly 21,having flowna total of 315,000 hours among 250 pilots.[6]Despite production of the type having been discontinued in 2023, Kaman pledged that it would continued to support the existing K-Max fleet in operation, which includes the provision of spare parts, servicing, training, and repairs to operators for the foreseeable future.[68]
Operators
edit- Akagi Helicopter Co.[72]
- Rotex Helicopter AG[74]
- Skywork Helicopters Ltd.[75]
Specifications (K-MAX)
editData fromJane's All the World's Aircraft 2000-01,[88]K-MAX performance and specs,[89]The Kaman K-MAX Specifications[90]
General characteristics
- Crew:1
- Capacity:
- 6,000 lb (2,722 kg) external load at ISA +15 °C (59.0 °F) at sea level
- 5,663 lb (2,569 kg) external load at ISA +15 °C (59.0 °F) at 5,000 ft (1,524 m)
- 5,163 lb (2,342 kg) external load at ISA +15 °C (59.0 °F) at 10,000 ft (3,048 m)
- 5,013 lb (2,274 kg) external load at ISA +15 °C (59.0 °F) at 12,100 ft (3,688 m)
- 4,313 lb (1,956 kg) external load at ISA +15 °C (59.0 °F) at 15,000 ft (4,572 m)
- Length:52 ft (16 m) rotors running
- Length of fuselage:41 ft 9 in (12.73 m)
- Width:51 ft 5 in (15.67 m) with rotors running
- Height:13 ft 7 in (4.14 m) to centreof hubs
- Empty weight:5,145 lb (2,334 kg)
- Max takeoff weight:6,500 lb (2,948 kg) without slung load
- 12,000 lb (5,443 kg) with jettisonable slung load
- Fuel capacity:1,541 lb (699 kg) / 228.5 US gal (190 imp gal; 865 L)
- Powerplant:1 ×Honeywell T5317A-1turboshaftengine, 1,350 shp (1,010 kW)flat ratedfor take-off up to ~29,000 ft (8,839 m) to increase transmission life
- Transmission rated to 1,500 shp (1,119 kW)
- Main rotor diameter:2 × 48 ft 4 in (14.73 m)
- Main rotor area:3,669 sq ft (340.9 m2)
- Blade section:-root:NACA 23012;tip:NACA 23011[91]
Performance
- Never exceed speed:100 kn (120 mph, 190 km/h) clean
- 80 kn (92 mph; 148 km/h) with external load
- Range:300 nmi (350 mi, 560 km) with max load
- Service ceiling:15,000 ft (4,600 m)
- Hover ceiling IGE:26,300 ft (8,016 m) at 6,000 lb (2,722 kg) AUW, ISA
- Rate of climb:2,500 ft/min (13 m/s) at Sea Level with flat-rated torque
- Disk loading:3.52 lb/sq ft (17.2 kg/m2)
- Power/mass:0.1045 hp/lb (0.1718 kW/kg)
- Fuel consumption:85 gal/h (71 imp gal/h; 322 L/h)[26]
See also
editExternal media | |
---|---|
Images | |
Autonomous K-MAX at Yuma | |
Video | |
Unmanned K-MAX at Yuma | |
K-MAX with wrecking ball |
Related development
Aircraft of comparable role, configuration, and era
References
edit- ^"Kaman restarts K-Max production on new commercial orders".Flightglobal. Archived fromthe originalon June 10, 2015.
- ^Boyne, Walter J.(2011).How the Helicopter Changed Modern Warfare.Pelican Publishing. p. 45.ISBN978-1-58980-700-6.
- ^abcdefghiBazzani, Mario (December 2020)."Kaman K-1200 K-MAX".www.heli-archive.ch.
Initial design features resulting from operator input included: a lead-acid battery, a DC only electrical system, "mechanically-hardened" sheet metal construction and heavy duty hook, crashworthy cockpit, easy access cowlings and panels, a particle separator on the engine inlet, and simple operating procedures.
- ^""Anton Flettner"; Hubschraubermuseum Bückeburg ".Archivedfrom the original on October 18, 2012.RetrievedAugust 22,2012.
- ^"Twin Turborotor Helicopter".Popular Mechanics.August 1954. p. 139. Archived fromthe originalon September 15, 2015.
- ^abcdeHead, Elan (March 9, 2015)."Going Solo".Vertical Magazine.RetrievedNovember 8,2022.
intermeshing main rotors, which turn in opposite directions "like a swimmer doing the breaststroke," as Kaman's instructors put it
- ^Gray, Peter (June 26, 1996)."Long – Lining".Flightglobal.Reed Business Information.Archivedfrom the original on June 21, 2015.RetrievedJune 21,2015.
- ^'K-MAX Intermeshing Rotor Drive System' 53rd Annual Forum Proc., AHH, 1997.
- ^"Composites take off... in some civil helicopters".compositesworld.com. March 1, 2005. Archived fromthe originalon September 11, 2011.
- ^Chandler, Jay (September 2012)."Advanced rotor designs break conventional helicopter speed restrictions".ProPilotMag. p. 2. Archived fromthe originalon July 18, 2013.RetrievedMay 10,2014.
- ^abcHuber, Mark (January 19, 2023)."Kaman Ending Production of K-Max Heavy-lift Helicopter".AIN Online.
- ^Herzig, Markus."The Kaman K-MAX Production list".Archived fromthe originalon April 18, 2015.[self-published source]
- ^Padfield, R. Randall (March 2012)."Civil Tiltrotor and K-Max Aerial Truck Back in the Saddle?"(PDF).AINonline.com.Archived(PDF)from the original on December 20, 2013.RetrievedMarch 31,2012.
- ^"Kaman Aerospace".Archived fromthe originalon June 29, 2013.
- ^"Lockheed MartinK-MAX".Archivedfrom the original on June 3, 2012.RetrievedOctober 17,2015.
- ^"Lockheed Martin And Kaman Aerospace Demonstrate Unmanned Supply Helicopter To U.S. Army".Archived fromthe originalon October 10, 2009.RetrievedAugust 13,2009.
- ^"Team K-MAX demonstrates successful unmanned Helicopter Cargo resupply to U.S. Marine Corps".Lockheed Martin.February 8, 2010. Archived fromthe originalon November 4, 2011.RetrievedMarch 14,2010.
- ^"Lockheed Martin awarded $45.8 million for unmanned KMAX".Defense Update. December 6, 2010. Archived fromthe originalon December 9, 2010.RetrievedDecember 11,2010.
- ^"Lockheed Martin/Kaman K-MAX Completes US Navy Unmanned Cargo Assessment".September 8, 2011. Archived fromthe originalon March 25, 2012.RetrievedSeptember 9,2011.
- ^"K-MAX looks to lift overseas sales".Flightglobal.com. June 18, 2013. Archived fromthe originalon January 19, 2016.
- ^"USMC Unmanned Lift Competition Taking Shape".Defensenews.com. September 25, 2013. Archived fromthe originalon September 28, 2013.
- ^"Marines Fly Helicopters With Mini-Tablet".DoDBuzz.com. April 5, 2014. Archived fromthe originalon April 8, 2014.
- ^"Aurora beats Lockheed bid to develop iPad-based UAS controller".Flightglobal.com. May 6, 2014. Archived fromthe originalon January 19, 2016.
- ^"Kaman Aerospace Soliciting Interest in New K-MAX Production"(Press release). Kaman. February 25, 2014. Archived fromthe originalon May 14, 2021.RetrievedJune 16,2017.
- ^Gourley, Scott (February 27, 2014)."Heli-Expo 2014: Kaman looks to restart K-MAX production".rotorhub.Shephardmedia.Archivedfrom the original on March 1, 2014.RetrievedMarch 1,2014.
- ^abcHead, Elan (April 2014)."Production potential".Vertical Magazine.p. 44.Archivedfrom the original on July 16, 2014.RetrievedJuly 8,2014.
- ^abHead, Elan (March 15, 2015)."Kaman still aiming to restart K-MAX production".Vertical Magazine.Archivedfrom the original on March 23, 2015.RetrievedMarch 17,2015.
- ^Trimble, Stephen (January 17, 2017)."Kaman inducts first K-Max into re-opened assembly plant".Flightglobal.Archivedfrom the original on January 18, 2017.RetrievedJanuary 18,2017.
- ^"Kaman announces first new K-MAX flight"(Press release). Kaman. May 19, 2017.Archivedfrom the original on June 6, 2017.RetrievedJune 16,2017.
- ^Grady, Mary (May 23, 2017)."First Flight For New K-Max".AVweb.Archivedfrom the original on July 20, 2018.RetrievedMay 24,2017.
- ^"Officials Celebrate Return Of Kaman K-MAX Helicopters".Hartford Courant. July 13, 2017.
- ^Phelps, Mark (July 17, 2017)."Kaman Delivers First New-build K-Max in Fourteen Years".Aviation International News.Archivedfrom the original on July 17, 2017.RetrievedJuly 18,2017.
- ^Trimble, Stephen (June 14, 2017)."Kaman authorises second batch of K-Max helicopter production".Flightglobal.Archivedfrom the original on June 14, 2017.RetrievedJune 18,2017.
a decision within two months on whether to extend production beyond the first 10 aircraft. A decision had to be made before June to avoid a break in the production system.
- ^Huber, Mark (June 9, 2017)."Kaman Delivering First New-production K-Max".Aviation International News.Archivedfrom the original on August 27, 2017.RetrievedJune 16,2017.
- ^Johnson, Oliver (July 20, 2017)."Kaman aims for new K-MAX delivery every 8 weeks".verticalmag.com.
- ^Reim, Garrett (March 7, 2019)."Kaman to offer optionally piloted K-Max by 2020".Flightglobal.Archivedfrom the original on March 7, 2019.RetrievedMarch 7,2019.
- ^Head, Elan (August 21, 2020)."How Kaman's unmanned K-Max helicopter is getting smarter".verticalmag.com.
- ^"K-Max Titan: The first commercial heavy-lift helicopter with no pilot".New Atlas.April 27, 2021.
- ^"Kaman Announces First Flight of Unmanned K-MAX TITAN".businesswire.com. April 21, 2021.
- ^"Kaman to close K-MAX production line".Janes Information Services.January 20, 2023.Archivedfrom the original on January 22, 2023.
- ^Karman III, John R. (August 18, 2008)."Demolition precedes new construction for Ursuline schools".Archivedfrom the original on October 26, 2012.RetrievedJanuary 24,2011.
- ^Thompson, Jennifer (August 11, 2008)."Ursuline Campus Expansion" The Wild Thing "called in for demolition of chimney".WDRB television, WLKY television.
- ^Roach, John."Robotic helicopters at work in Afghanistan".Future of Technology,MSNBC.Archived fromthe originalon January 7, 2012.RetrievedDecember 22,2011.
- ^"K-MAX RoboCopter Starts Making Autonomous Afghanistan Deliveries Little robot helicopters are on the job, delivering supplies to front-line troops in Afghanistan".IEEE.December 20, 2011.
- ^Ackerman, Evan."Unmanned helicopter makes first delivery for Marines in Afghanistan".USMC.Archived fromthe originalon January 8, 2012.RetrievedDecember 28,2011.
- ^"Beacon improves UAV's cargo-delivery accuracy".Marine Corps Times.July 8, 2012. Archived fromthe originalon January 28, 2013.RetrievedJuly 9,2012.
- ^McLeary, Paul (February 3, 2012)."K-MAX Chugging Along in Afghanistan".Aviation Week.RetrievedFebruary 4,2012.
- ^"U.S. Marine Corps to Keep K-MAX Unmanned Cargo Re-Supply Helicopter in Theater for Second Deployment Extension".Lockheed. July 31, 2012. Archived fromthe originalon January 26, 2013.
- ^"US Marines extend K-MAX unmanned helicopter's use in Afghanistan".Reuters.com. March 18, 2013. Archived fromthe originalon September 24, 2015.
- ^"Unmanned K-MAX Wins Top Innovation Honors, USMC Praise".HeliHub. January 9, 2013.Archivedfrom the original on April 21, 2013.RetrievedFebruary 26,2013.
- ^"Unmanned K-MAX is nominee for Collier Trophy".HeliHub. February 11, 2013.Archivedfrom the original on July 29, 2013.RetrievedFebruary 26,2013.
- ^ab"Marines Work to Extend K-MAX in Afghanistan Through 2014".Defensetech.org. September 25, 2013. Archived fromthe originalon March 5, 2014.
- ^"Unmanned Marine helo crashes in Afghanistan".Militarytimes.com. June 13, 2013. Archived fromthe originalon June 29, 2013.
- ^"US Navy set to resume K-MAX flights".Flightglobal.com. August 14, 2013. Archived fromthe originalon August 18, 2013.
- ^"Tailwinds caused K-Max crash in Afghanistan".Strategicdefenseintelligence.com. August 11, 2014. Archived fromthe originalon August 12, 2014.
- ^Trimble, Stephen (November 18, 2013)."Lockheed tests K-MAX cargo enhancement".Flightglobal.com. Archived fromthe originalon December 21, 2013.RetrievedNovember 18,2013.
- ^"Lockheed seeks more autonomy for unmanned K-MAX]".Flightglobal.com. September 11, 2013. Archived fromthe originalon September 17, 2013.
- ^"K-MAX RoboCopter Comes Home To Uncertain Future".Breakingdefense.com. July 24, 2014. Archived fromthe originalon August 2, 2014.
- ^"K-MAX returns from Afghan deployment".Flightglobal.com. July 25, 2014. Archived fromthe originalon July 27, 2014.
- ^"K-MAX cargo drone home from Afghanistan, headed to storage".Militarytimes.com. August 2, 2014. Archived fromthe originalon August 4, 2014.
- ^"U.S. Marines take next step toward cargo UAS acquisition".Flightglobal.com. August 4, 2015. Archived fromthe originalon August 7, 2015.
- ^"Feds eye pilotless helicopters to battle wildfires".Fire Engineering. Archived fromthe originalon October 16, 2015.Retrieved15 October2015.
- ^"K-Max carries out US federal government firefighting tests".Flightglobal. Archived fromthe originalon October 17, 2015.
- ^"Neya Systems Awarded Phase III SBIR to Demonstrate VTOL UAV Control".Neya Systems. April 4, 2014. Archived fromthe originalon January 19, 2016.
- ^"Lockheed Tests Casualty Evacuation Mission with K-MAX Drone".Nationaldefensemagazine.org. May 1, 2015. Archived fromthe originalon May 18, 2015.
- ^Herzig, Markus."The Kaman K-MAX Current Status".SwissHeli.com.Archived fromthe originalon February 20, 2012.
- ^"Final Report No. 2142 by the Swiss Accident Investigation Board SAIB"(PDF).Archived fromthe original(PDF)on June 21, 2015.
- ^Johnson, Oliver (January 19, 2023)."Kaman to discontinue K-Max production".verticalmag.com.
- ^"Heliqwest Fleet".heliqwest.com.Archivedfrom the original on September 6, 2017.RetrievedMarch 13,2018.
- ^"Canadian Civil Aircraft Register".Transport Canada. August 28, 2013.RetrievedMarch 13,2018.
- ^"colombian army aviation".helis.com.Archivedfrom the original on January 19, 2016.RetrievedJanuary 5,2013.
- ^"akagi helicopter".akagi-heli.co.jp.RetrievedJune 10,2022.
- ^"TOS".rotex-helicopter.ch.
- ^Herzig, Markus."Swiss Helicopters – Current Fleetlist".Swissheli.com.Archivedfrom the original on June 9, 2013.RetrievedJune 18,2012.
- ^"Skywork Helicopters".skyworkhelicopters.com.Archivedfrom the original on January 6, 2014.RetrievedJanuary 6,2014.
- ^Herzig, Markus."HB-XHJ".Swissheli.com.Archivedfrom the original on September 10, 2018.RetrievedMarch 14,2019.
- ^"HELOG".helis.com.Archivedfrom the original on January 19, 2016.RetrievedJanuary 5,2013.
- ^"Central Copters Inc".Archived fromthe originalon March 9, 2015.RetrievedJuly 7,2013.
- ^"Kaman Receives K-MAX Order From Columbia Basin Helicopters"(Press release).Helitech International.London: Kaman Aerosystems. October 3, 2017.Archivedfrom the original on October 13, 2017.RetrievedOctober 3,2017.
- ^"A shut and open case"(PDF).RotorHub. August–September 2015. Archived fromthe original(PDF)on November 26, 2015.
- ^"Heliqwest Fleet".heliqwest.com.Archivedfrom the original on October 8, 2012.RetrievedAugust 10,2013.
- ^"Kaman K-1200 K-MAX".Mountain West Helicopters.
- ^"About Mountain West Helicopters".Mountain West Helicopters.
- ^"Helicopter | Anchorage | ROTAK Helicopter Services".Helicopter | Anchorage | ROTAK Helicopter Services.Archivedfrom the original on December 1, 2017.RetrievedNovember 28,2017.
- ^"Swanson group aviation".DNA Web Agency.Archivedfrom the original on January 23, 2013.RetrievedJanuary 5,2013.
- ^"Timberline Helicopters".Archivedfrom the original on December 25, 2012.RetrievedJanuary 5,2013.
- ^"U.S. Marine Corp K-MAX".helis.com.Archivedfrom the original on September 21, 2012.RetrievedJanuary 5,2013.
- ^Jackson, Paul, ed. (2000).Jane's All the World's Aircraft 2000-01(91st ed.). Coulsdon, Surrey, United Kingdom: Jane's Information Group. pp. 679–680.ISBN978-0710620118.
- ^"K-MAX Performance and Specs".Kaman Aircraft. Archived fromthe originalon July 30, 2012.RetrievedOctober 2,2012.
- ^Herzig, Markus (January 1, 2015)."The Kaman K-MAX Specifications".SwissHeli.com.Archived fromthe originalon April 18, 2015.RetrievedNovember 18,2020.
- ^Lednicer, David."The Incomplete Guide to Airfoil Usage".m-selig.ae.illinois.edu.RetrievedApril 16,2019.