Areva S.A.is a Frenchmultinationalgroup specializing innuclear powerheadquartered in Courbevoie, France.[1]Before its 2016 corporate restructuring, Areva was majority-owned by the French state[2]through theFrench Alternative Energies and Atomic Energy Commission(54.37%),Banque publique d'investissement(3.32%), andAgence des participations de l'État(28.83%).[3]Électricité de France,of which the French government has a majority ownership stake, owned 2.24%;Kuwait Investment Authorityowned 4.82% as the second largest shareholder after the French state.[4]
Company type | State-owned enterprise |
---|---|
Industry | Nuclear industry |
Predecessors | Framatome Cogema Technicatome |
Founded | 2001 |
Successors | Framatome Orano Technicatome |
Headquarters | Courbevoie,Paris ,France |
Area served | Worldwide |
Key people | Philippe Braidy(chairman and chief executive officer) |
Products | Nuclear reactors Nuclear fuel Uranium Electric power |
Services | Nuclear enrichment Nuclear material transport Nuclear reprocessing |
Owner | Government of France |
Number of employees | 45,340 (2013) |
Subsidiaries |
|
Website | www |
As a part of the restructuring program following its insolvency, Areva sold out or discontinued its renewable energy businesses, sold its reactors business subsidiaryAreva NP(nowFramatome) toEDFand itsnuclear propulsionand research reactors subsidiary Areva TA (now Technicatome) to Agence des participations de l'État, and separated its nuclear cycle business into a separate company New Areva (becomingOrano). As a result, Areva S.A. became wholly state-owned by the French government, remaining responsible only for the liabilities related to theOlkiluoto 3project inFinlandand holding a 40% stake in Orano.
History
editCreation
editAreva was created on 3 April 2001 by themergerof Framatome (later: Areva NP, now: Framatome),Cogema(later: Areva NC, now:Orano Cycle) and Technicatome (later: Areva TA, now: Technicatome). It was based on the structure of its precursor, CEA-Industrie.Anne Lauvergeonbecame its first CEO.[5][6]
Jean-Pierre Raffarin,the formerPrime Minister of France,announced the privatization of Areva in 2003, but it was postponed several times, the French government opting finally for the privatization of GDF and EDF. At the end of October 2005, French Prime MinisterDominique de Villepinannounced that he had suspended the privatization process.
In 2003, Areva secured a contract for theOlkiluoto 3project, which foresaw construction of thethird generationEPR-typepressurised water reactor.In 2004 a contracted fixed price was established as €3.2 billion.[7]Construction started in 2005.[8]
In 2004, Areva acquiredAlstom's transmission and distribution activities, which became Areva T&D. It was sold back to Alstom andSchneider Electricin June 2010.[9]
On 15 September 2005, Areva andConstellation Energyof Baltimore announced ajoint venturecalled UniStar Nuclear to market the commercial EPR in the United States.[10]The joint venture later becameUniStar Nuclear Energyin 2007. In 2010, EDF acquired 100% of UniStar Nuclear Energy.[11]However these plans failed to come to fruition, and in February 2015 Areva suspended the EPR Design Certification Application Review process at the U.S.Nuclear Regulatory Commission(NRC).[12]
In 2006, Areva created its renewable energies business group.[13]Creusot Forge and Creusot Mécanique merged into the Areva group,[14][15]even though there were quality concerns over Creusot Forge's work.[16]In 2007, Areva purchased 51% of offshorewind turbinemanufacturer Multibrid.[17]Multibrid has been a start-up and German offshore wind pioneer, producing wind turbines in Bremerhaven. The innovative M5000 wind turbine has a compact medium speed drive train and carbon rotor blades. The patented air treatment to prevent corrosion was unique. The turbine design been made byaerodyn Energiesysteme GmbH. In 2015 the renewable unit of Areva changed into ADWEN GmbH.
In June 2010, Areva purchased the remaining 49% and formedAreva Wind.In February 2010, Areva bought Ausra, and renamed itAreva Solar.[18][19]
In 2007, Areva purchased UraMin, which later became Areva Resources Southern Africa (now part of Orano).[20]
In 2007, Areva started construction of theFlamanville 3EPR reactor. In addition, in November 2007 Areva agreed to an €8 billion deal with theChina Guangdong Nuclear Power Groupto supply them with two EPRs forTaishan Nuclear Power Plant.[21][22]Under the terms of the agreement, Areva also had to help operate the plant, including the reprocessing of spent fuel.[23]Also in 2007, Areva andMitsubishi Heavy Industriescreated a joint venture namedAtmeato develop a 1,100 MWe Atmea-1 pressurised water reactor (Generation III reactor).[24]In 2009,Siemenssold its remaining shares of Areva NP and Arvea NP became wholly owned by Areva.[25]At the same year, Areva NP acquired 30% stake in the Mitsubishi Nuclear Fuel company.[24]
On 6 May 2008, Areva announced that it would seek all necessary approval to build an enrichment facility in Bonneville County,Idaho.[26]The project was later cancelled. Also in 2008, Areva was awarded an operations contract to clean up theSellafield nuclear reprocessing siteas part of the Nuclear Management Partners consortium, made up of URS, Amec and Areva.[27]
In June 2008, Areva reached an agreement withKazatompromto create a joint-venture Katco.[28]
On 4 February 2009, Areva signed a memorandum to supply two to six nuclear reactors to theNuclear Power Corporation of India Limitedfor theJaitapur Nuclear Power Projectin the Indian state of Maharashtra.[29][30]
In March 2010, Areva indicated work was being done on a new type ofburner reactortype capable of breaking downactinidescreated as a product ofnuclear fission.[31]
In 2011, Areva was listed at theEuronextstock exchange in Paris.
Post-Fukushima problems
editIn December 2011, Areva suspended building work at several sites in France, Africa and the United States, one day after forecasting a €1.6 billion ($2.1 billion) loss.
Areva halted "capacity extensions" at itsLa Hague Reprocessing Plant,in northern France, at its Melox factory in the southwest, and at two sites attached to its Tricastin power plant in the south. Work has also stopped on extensions to uranium mines inBakoumain the Central African Republic,Trekkopjein Namibia, and Ryst Kuil in South Africa,[32]and caused a potential delay in construction until a capital solution is secured for theEagle Rock Enrichment Facilityin the United States.[33]Areva wrote off most of the $2.5 billion purchase cost of Canadian uranium mining company Uramin, purchased in 2007, after concluding that its uranium ore deposits were of negligible value.[34]
In September 2014Standard & Poor'sstated it might downgrade Areva's credit rating following weak first-half results, leading to Areva indicating it would cut capital spending and dispose of some assets.[35]In March 2015 Standard & Poor's further downgraded Areva's credit rating to BB− after Areva posted a €4.8 billion loss for 2014.
In 2012, Areva acquired a hydrogen technology developerCompagnie européenne des technologies de l'hydrogène(CETH) and renamed it Areva H2Gen. At the same year, it inaugurated a hydrogen storage system called the MYRTE platform nearAjaccio,Corsica (MYRTE is the French acronym forMission Hydrogène Renouvelable pour l’intégration au réseau électrique).[36]The system aims to establish the feasibility of a storage solution forsolar energyusing hydrogen technologies, which would serve as a back-up system to stabilize Corsica's power grid.[36]In 2014, Areva's energy storage and management system, the Greenergy Box, was added to the existing installation, in operation since early 2013. In January 2014, Areva and Spain's wind turbine manufacturerGamesa Corporación Tecnológicacreated on the bases of Areva Wind a joint ventureAdwen.[37]In August 2014, Areva exited the solar industry.[38]
In October 2013, Areva won a $2.7 billion contract to supply two EPR nuclear reactors with nuclear steam supply and control systems at theHinkley Point Cplant inSomerset,England.[39][40]It will also provide uranium extraction and enrichment for the fuel fabrication stage.[41]
In December 2013, Areva andChina General Nuclear Power(CGN) agreed to a partnership in renewable energy, with a focus on offshore wind, biomass, concentrated solar power, and energy storage.[42]
In October 2014, CEO Luc Oursel took a leave of absence for health reasons.[35]He died in December of the same year.[43]On 20 November 2014 Standard & Poor's downgraded Areva long-term debt to BB+ and short-term-debt to A-3.[44][45]
In May 2014, Areva through its subsidiary CETH2, and the ADEME (French Environment and Energy Management Agency), announced the creation of the AREVA H2-Gen joint venture.[46]
In December 2015 operations atLe Creusot Forgewere stopped following a discovery at theFlamanville Nuclear Power Plant.[47][48]About 400 large steel forgings manufactured by Le Creusot Forge since 1965 found to have carbon-content irregularities that weakened the steel. A widespread programme of reactor checks was started involving a progressive programme of reactor shutdowns. This caused power price increases in Europe as France increased electricity imports, especially from Germany, to augment supply.[49][50]In December 2016 international inspectors found evidence of recent doctored paperwork, which had not been detected by Areva's independent quality control checks.[51][52]In April 2017Autorité de sûreté nucléaire(ASN) published the requirements for forging to resume at Le Creusot Forge.[47][48]In August 2017 ASN published a draft decision requiring the examination of Le Creusot Forge manufacturing records of all components during scheduled reactor refuelling outages.[53]
Restructuring
editIn June 2016 Areva's restructuring plans were made public, including the sale of the majority of its reactor business to EDF in 2017, excluding theOlkiluoto 3 EPRunder construction in Finland which will remain with Areva SA.[54]In December 2017, Areva and EDF signed agreements on the transfer of Areva NP's nuclear reactor operations.[55]As part of the restructuring plan, Areva created a new fuel cycle company, dubbed as New Co or New Areva. The new company combined Areva Mines,Areva NC,Areva Projects, and Areva Business Support companies.[56]It was created as a wholly owned subsidiary of Areva; however, Areva lost control over the company as the French government invested to recapitalize the company. On 23 January 2018 that company changed its name to Orano.[56][57]In January 2017, Areva sold its stake in the wind turbine manufacturer Adwen.[58]In March 2017, Areva sold its nuclear propulsion and research reactor subsidiary Areva TA toAgence des Participations de l'Etat.[59]
Current operations
editAs of 2019[update],Areva S.A. is responsible only for the liabilities related to the Olkiluoto 3 project. The reactor, which is one of the first of the newGeneration III reactors,was initially expected to begin producing electricity in 2009, but project completion was delayed eventually until 2023, and it has faced several price increases.[7]Areva and TVO have reached an agreement, according to which Areva would pay €450 million in compensation over the delays and lost income. The agreement would settle all legal actions between the two companies.[60][61]
Areva also holds of 40% stake in Orano.
Past operations
editAreva was a company with apresence in each industrial activitylinked to nuclear energy:mining,chemistry, enrichment, fuel assembly, reprocessing, engineering, nuclear propulsion and reactors, treatment, recycling, stabilization and dismantling. Areva also offered technological solutions for renewable energy.[62]Areva's activities were divided into five business groups.[63]
Nuclear operations
editThe mining business group managed the exploration of uranium ore, its extraction, and processing, as well as the restoration of sites after mine closure.[64]It had staff on five continents and operated uranium production sites in Canada, Kazakhstan, and Niger.[65]As of the end of 2013, the Mining Business Group employed 4,463 people.[66]Uranium production accounted for 19% of Areva's consolidated revenue in 2013.[67]It is now part of Orano.
The front end business group provided access to fuel for Areva's customers, and oversees operations to convert uranium into nuclear fuel, including the chemical conversion of ore intouranium hexafluoride,the enrichment of uranium, and the design and production of fuel for nuclear reactors.[68]As of the end of 2013, 8,555 people worked for Areva's front end business group.[69]It accounted for 24% of Areva's consolidated revenue in 2013.[69]It is now part of Orano.
The reactors and services business group designed and builtpressurized water reactorsandboiling water reactors,and offers products to service nuclear reactors. It is now part of Framatome. The business group also designed and built naval propulsion and research reactors, which is now Technicatome. The business group had 15,592 employees at the end of 2013 and generated 36% of Areva's revenue in the same year.
The back end business group developed recycling solutions for used fuel for reuse in reactors. It also offered storage and transportation solutions for radioactive material, and site rehabilitation at nuclear facilities. It is now part of Orano. At the end of 2013, it had 11,583 employees and made up for 19% of Areva's revenue. In 2017 the NUHOMS Matrix advancedused nuclear fuel storageoverpack, a high-density system for storing multiple spent fuel rods in canisters, was launched.[70]
Renewable energy operations
editAreva created its global renewable energies business group in 2006 as an expansion of itsclean energyportfolio withrenewable energy.[13]This group represented four business lines:concentrated solar power,offshorewind power,biomasspower, and hydrogen power storage and distribution. Areva builtbiomasspower plants worldwide, representing 2.5 GWe of installed capacity.[71]These plants are located in Brazil, Chile, Germany, the Netherlands, India and Thailand.[71][72][73]Its subsidiary Areva Renewables Brazil built biomass power plants based on bagasse (organic waste from sugar cane).[74]In the United States, Areva formed a partnership withDuke Energyto build and operate 55 MW biomass power plants based on wood waste.[75]
Areva acquired a bio-coal production technology called Thermya,[76]which produces a biofuel issued from biomass torrefaction that can replace coal to generate thermal energy and electricity.[77][78]Areva also developed AdCub, a modular concept for compact power plants targeting small-scale biomass resources that addresses relatively untapped growth opportunities in Europe. The objective is to combine innovative solutions which optimize customer costs for small-scale power plants (between 3 and 6 MW) and reduce construction time. This new biomass plant concept also aims to improve upstream technologies for multi-fuel acceptance and higher availability.[77]
Areva designed, manufactured and industrialized turnkey energy storage solutions and products to generate electricity withfuel cellsand produce hydrogen by electrolysis. Areva supported research in the hydrogen field through partnerships with a number of industrial companies and national research organizations includingAgence Nationale de la Recherche,the Horizon Hydrogen Energy (H2E) program, PAN-H (Plan d'Action National sur l'Hydrogène et les piles à combustible) and Pôle Capenergies, an innovation cluster dedicated to the development of renewable forms of energy without greenhouse gas emissions.[79]
Other operations
editAreva was involved inmilitary technology,such as designing the nuclear reactor for theFrench Barracuda class submarine.[80]One of Areva's subsidiaries,Euriware(founded in 1991) was specialized in consulting and IT services and employs 2,200 people.[81]Areva also owned 1.99% ofSafranand 1.4% ofSuez Environnement.[82][83]
CERCA, a subsidiary of Areva that produces fuel for research reactors, was also involved inTRIGA,a research reactor established in 1996 with the US firmGeneral Atomicsthat is used for training, research, and the production of radioisotopes.[84]
Areva was a former corporate member of theBruegelthink tank.[85]
Notable incidents
edit2007 fine
editIn January 2007, Areva was fined €53 million by theEuropean CommissionforriggingEU electricity markets through acartelinvolving 11 companies, includingABB,Alstom,Fuji,Hitachi Japan,AE Power Systems,Mitsubishi Electric Corp,Schneider Electric, Siemens,Toshibaand VA Tech ELIN.[86]According to the commission, "between 1988 and 2004, the companies rigged bids for procurement contracts, fixed prices, allocated projects to each other, shared markets and exchanged commercially important and confidential information."[86]
Areva is not accused of any cartel involvement other than through the acquisition of an Alstom unit in January 2004. "This subsidiary was acquired by the Areva group towards the end of the infringement, in January 2004. The parent entities of the Areva group share a joint liability with that subsidiary for the period after its acquisition."[87]"A few months before the cartel ended, Alstom sold the unit involved to Areva, which knew nothing of the cartel. It [Areva] and Alstom have joint liability for 53.6 million, which they must decide how to split."[88]
EU Competition CommissionerNeelie Kroesdeclared that "The commission has put an end to a cartel which has cheated public utility companies and consumers for more than 16 years".[89]
Libya deal
editOn 13 August 2007, the French newspaperLe Parisienalleged that theFranco-Libyan civil nuclear power agreementsigned by PresidentNicolas Sarkozydid not concern desalinization of sea water, as claimed by the French government, but instead focused in particular on selling the EPR to Libya, a contract potentially worth $3 billion.[25]Le Parisiencited Philippe Delaune, deputy to the deputy director of international affairs for theCEA atomic agency,which is the main share-holder in Areva.[25]Following allegations that the deal had been related to therelease of the Bulgarian nurses,theFrench Socialist Party,through the spokespersonJean-Louis Bianco,declared that this deal was "geopolitically irresponsible".[25]TheGerman governmentalso denounced the agreement.[25]
Bakouma assault
editOn 24 June 2012, an armed group assaulted a uranium plant operated by Areva atBakoumain the southeast of theCentral African Republic.A statement by the military described that "a violent clash on Sunday afternoon pitted" Central African troops against "an unidentified group of armed men attempting to launch an assault on the site of mining company Areva".
According to the report the army successfully repelled the attack, but "the enemy did some material damage and pulled back while taking a sizeable quantity mainly of food with them." The Areva group issued no immediate statement regarding the attack. Central African military sources believe that the attack was organized by members of theChadianrebel groupPopular Front for Recovery(FPR) led by 'General' Baba Ladde, which has been active in the region since 2008. The army says it is conducting further operations to neutralize the remaining armed rebels in the region of Bakouma.[90][91]
Attack in Niger
editIn May 2013, the company's uranium mine in Niger was damaged and one civilian was killed in anAl-Qaeda-linked suicide bomb attack.[92]The mine reached full production again in August 2013.[93][94]
Tuareg people
editIn November 2009, Greenpeace released a report indicating that two villages near Areva's mining operations in Niger had dangerously high levels of radiation.[95][96]
In January 2014,Al JazeeraproducedOrphans of the Sahara,three-part series on theTuareg peopleof the Sahara desert, in which claims were brought to light that Areva mining and consequent irradiations are causing diseases and deaths among their people.[97]
Al Jazeera also published Areva's response, in which the company said it submits regular reports on its environmental monitoring of water, air and soil to the Nigerien Office of Environmental Assessments and Impact Studies (BEEEI) which indicate that there is no pollution around the sites in question.[98]
Corporate issues
editName etymology
editThe name Areva was derived from the name of theCistercianAbbey ofArévalo.
Sport sponsorship
editAreva sponsored several sporting events over the years. In 2009, Areva launched Athlenergy, an online resource for runners,[99]and became the sponsor of the French Athletics Federation[100]and the official sponsor ofMeeting Areva,a track and field competition held annually at theStade de Francein Saint-Denis, France.[101]In May 2014, Athlenergy becameArevarun.Areva also sponsors several running events, including the Paris Half Marathon[102]and Saintélyon, a night run from Sainte Etienne to Lyon, in France.[103]
In 2008, Areva signed a contract to sponsor the German football clubFC Nürnberguntil 2012.[104]The contract was completed in 2012.[105]
Areva sponsored the French "Defi Areva" team in the 2002America's Cuprace, and the French "Areva Challenge" team in the 2007 America's Cup race. In 2002, during its first public appearance, in Lorient, France, the "Defi Areva" yacht collided with a dinghy carrying four Greenpeace protesters, and the impact knocked a hole in the side of the 80-foot boat.[106][107]
See also
editReferences
edit- ^"Legal Notice".Areva.Retrieved21 June2010.
- ^Carol Matlack,Areva is costing France plenty,Bloomberg Businessweek,17 April 2015.
- ^"Les participations publiques"(in French). Agence des participations de l'État. 30 April 2015.Retrieved21 February2016.
- ^"2014 Reference document"(PDF).Areva. 30 March 2015.Retrieved21 February2016.
- ^"Stock Ownership Profile".Areva.Retrieved22 May2014.
- ^"Is Areva now Framatome? – MassInitiative".massinitiative.Retrieved20 February2023.
- ^abJolly, David (11 February 2013)."Finnish Nuclear Plant Won't Open Until 2016".The New York Times.Retrieved22 May2014.
- ^Kanter, James (28 May 2009)."In Finland, Nuclear Renaissance Runs into Trouble".The New York Times.
- ^"Will split Areva T&D into two separate entities: Alstom".MoneyControl. 3 June 2014.
- ^"EPR: Constellation Energy and Areva Join Forces to Introduce New and Unique Business Model for the Future of American Nuclear Power".Areva.Retrieved25 June2014.
- ^"Constellation/EDF UniStar nuclear timeline".Reuters.Retrieved25 June2014.
- ^"US EPR plans suspended".World Nuclear News. 6 March 2015.Retrieved21 April2015.
- ^ab"Renewable Energy, Expected Growth".Areva.Retrieved22 May2014.
- ^Janet Wood, Caroline Peachey (21 March 2017)."Nuclear cracks are beginning to show".Nuclear Engineering International.Retrieved28 March2017.
- ^"Creusot Forge and Creusot Mécanique: the production of large forged parts - History".Areva.Retrieved3 March2017.
- ^"ASN warned about Creusot Forge over 10 years ago".Nuclear Engineering International. 6 April 2017.Retrieved10 April2017.
- ^"Wind power: Areva acquires a 51% stake in Multibrid".Areva.Retrieved25 January2009.[permanent dead link]
- ^ Wald, Matthew L. (8 February 2010)."Nuclear Power Giant Buys Solar Firm".The New York Times.
- ^"French Nuclear Giant Buys Calif. Solar Startup".The New York Times.9 February 2010.
- ^Paris, Alison Birrane and Jeff Sparshott in London and Alice Dore in (16 June 2007)."Areva to Buy UraMin for $2.5 Billion".The Wall Street Journal.ISSN0099-9660.Retrieved27 October2021.
- ^Clark, Nicola; Lague, David (26 November 2007)."European companies sign deals to supply China with airplanes and nuclear power".The New York Times.
- ^"Areva, Airbus Lead $30 Billion Haul in China Visit".Bloomberg. Archived fromthe originalon 27 June 2014.Retrieved25 June2014.
- ^John Tagliabue,The New York Times,27 November 2007"China Deal Gives Lift to Revival of Fission".
- ^ab "Areva NP becomes Framatome and Atmea is reorganised".Nuclear Engineering International.8 January 2018.
- ^abcdeMarc Lomazzi,Le Parisien,13 August 2007"Nucléaire: les dessous de l'accord entre la France et la Libye"(in French).
- ^"Areva selects enrichment site".World Nuclear News. 8 May 2008.
- ^"Nuclear Management Partners Wins Extension to Clean up Sellafield".The Financial Times.Retrieved24 June2014.
- ^"Areva and Kazakhstan Sign a Strategic Agreement in the Front End of the Nuclear Cycle".areva.11 June 2008.
- ^"We are partners over the long haul".The Hindu.25 November 2010.
- ^"Areva wins India nuclear deal worth at least $10 bln".Reuters.4 February 2009. Archived fromthe originalon 15 July 2012.
- ^Robin Pagnamenta, The Times, 22 March 2010,Areva develops new nuclear reactors that 'destroy' atomic waste,The Australian
- ^"French nuke giant Areva suspends investment in sites".AFP.14 December 2011. Archived fromthe originalon 24 January 2013.
- ^"Areva Continues Eagle Rock Commitment".13 December 2011. Archived fromthe originalon 23 January 2012.Retrieved31 December2011.
- ^Carol Matlack (16 April 2015)."Areva Is Costing France Plenty".Bloomberg.Retrieved21 April2015.
- ^abMichael Stothard (18 November 2014)."EDF in fresh delay for flagship nuclear plant".Financial Times.Retrieved21 November2014.
- ^ab"Areva unveils hydrogen storage system".Engineering News.Retrieved11 June2014.
- ^"Wind turbine firms Gamesa and Areva in joint venture".BBC News.BBC. 20 January 2014.
- ^ "AREVA Exits CSP after net loss in first half 2014".CSP Today.1 August 2014.
- ^"Two EPR Reactor's at EDF's Hinkley Point".Areva. Archived fromthe originalon 5 July 2014.Retrieved24 June2014.
- ^"Areva Secures U.K. Reactor Order Worth More Than $2.7 Billion".Bloomberg.Retrieved24 June2014.
- ^"Framatome - Large projects - Hinkley Point C".framatome.Retrieved7 April2022.
The part of the project concerning preliminary fuel fabrication activities, including the extraction of uranium, its conversion and enrichment, will be conducted by AREVA.
- ^"Areva signs energy partnership agreements in China".Reuters.9 December 2013. Archived fromthe originalon 21 April 2019.Retrieved25 June2014.
- ^Landauro, Inti."Areva CEO Luc Oursel Dies".The Wall Street Journal.Retrieved5 December2014.
- ^"European Factors to Watch-Indexes to edge higher, focus on ECB speeches".Reuters. 20 November 2014.Retrieved23 November2014.
- ^"Areva cut to junk by S&P".Financial Times.20 November 2014.Retrieved25 November2014.
- ^"AREVA: Hydrogen Production: Creation of a Global Leader in PEM Electrolysis".Reuters. Archived fromthe originalon 11 June 2014.Retrieved11 June2014.
- ^ab"ASN sets conditions for Creusot Forge restart".World Nuclear News. 18 April 2017.Retrieved21 April2017.
- ^ab"French regulator lists conditions for operation of Le Creusot Forge".Nuclear Engineering International. 20 April 2017.Retrieved21 April2017.
- ^Andrew Ward (28 October 2016)."French nuclear outages threaten higher UK power bills".Financial Times.Retrieved2 November2016.
- ^John Large (26 September 2016).Irregularities and Anomalies Relating to the Forged Components of Le Creusot Forge(PDF).Large Associates(Report). Greenpeace France.Retrieved27 October2016.
- ^Matthew Dalton; Inti Landauro; Rebecca Smith (13 December 2016)."Coverup at French Nuclear Supplier Sparks Global Review".Wall Street Journal.Retrieved15 December2016.
- ^Vaughan, Adam (24 March 2017)."Inspectors find safety irregularities at Creusot nuclear forge in France".The Guardian.Retrieved24 March2017.
- ^"EDF ordered to check component records".World Nuclear News. 17 August 2017.Retrieved18 August2017.
- ^"Areva outlines restructuring plan".World Nuclear News. 15 June 2016.Retrieved25 June2016.
- ^ "Binding agreements signed for sale of New NP".World Nuclear News.27 December 2017.
- ^ab "New Areva changes name to Orano".World Nuclear News.23 January 2018.
- ^ De Clercq, Geert (23 January 2018)."Areva to be renamed Orano – Les Echos".Reuters.Retrieved12 February2018.
- ^ Weston, David (6 January 2017)."Areva completes Adwen sale".Wind Power Monthly.
- ^ "AREVA a finalisé la cession d'Areva TA"[Areva has finalized the sale of Areva TA].capital.fr(in French). 30 March 2017.
- ^"Le Monde: Areva to pay hundreds of millions in compensation for delayed OL3 Nuclear Power Plant in Finland".Metropolitan.fi. 10 March 2018.Retrieved12 March2018.
- ^"TVO confirms a settlement agreement signed on OL3 EPR project completion and related disputes".TVO.11 March 2018.Retrieved12 March2018.
- ^"The Renewable Energies Business Group at a Glance".Areva.Retrieved22 May2014.
- ^"Areva's Operations".Areva.Retrieved22 May2014.
- ^"The Mining Business Group at a Glance".Areva.Retrieved23 June2014.
- ^"Mining Business Group Worldwide".Areva.Retrieved23 June2014.
- ^"2013 Reference Document"(PDF).Areva.Retrieved23 June2014.
- ^"Mining Business Group".Areva.Retrieved22 May2014.
- ^"The Front End Business Group at a Glance".Areva.Retrieved23 June2014.
- ^ab"The Front End Business Group".Areva.Retrieved22 May2014.
- ^"Areva's space-saving solution for used fuel storage".World Nuclear News. 29 September 2017.Retrieved29 September2017.
- ^ab"Bioenergy: Naturally Renewable".Areva.Retrieved9 June2014.
- ^"A Sustainable Future".Areva.Retrieved9 June2014.
- ^"Biomass: AREVA Delivers Power Plant to Eneco".The Wall Street Journal.Retrieved11 June2014.
- ^"Areva Renewables in Brazil, Brazilian Bioenergy Specialist".Areva.Retrieved9 June2014.
- ^"ADAGE, Energy Northwest to Pursue Development of Biomass Plants".Bloomberg. Archived fromthe originalon 27 June 2014.Retrieved11 June2014.
- ^"Areva Buys Biocoal Technology".Biomass Magazine.Retrieved11 June2014.
- ^ab"Bioenergy Technology: Innovation in Action".Areva.Retrieved9 June2014.
- ^"2012 Annual Report Forward-Looking Energy"(PDF).Areva. Archived fromthe original(PDF)on 22 May 2014.Retrieved9 June2014.
- ^"AREVA Energy Storage".Areva.Retrieved9 June2014.
- ^"France's Future SSNs: The Barracuda Class".Defense Industry Daily.Retrieved13 June2014.
- ^"EURIWARE: Who We Are".AEURIWARE.Retrieved9 June2014.
- ^"Areva Worldwide Presence".Areva.Retrieved9 June2014.
- ^"Areva Finalizes the Disposal of its Stake in Eramet".Areva.Retrieved9 June2014.
- ^"CERCA: fuel production for research reactors".Areva.Retrieved9 June2014.
- ^"Membership".Bruegel.Retrieved9 June2014.
- ^abEU cracks down on electricity-gear cartelArchived3 March 2016 at theWayback Machine,EurActiv,25 January 2007.
- ^Competition: Commission fines members of gas insulated switchgear cartel over 750 million eurosIP/07/80 Brussels, 24 January 2007, Press Releases – EUROPA
- ^Lawsky, David (25 January 2007)."EU shocks electric cartel with 750 million euro fine".Reuters.
- ^Vote call by Siemens shareholders,BBC,25 January 2007
- ^"Gunmen Attack French Uranium Plant".timeslive.co.za.25 June 2012.
- ^"CAR gunmen attack French uranium plant".News24.25 June 2012.
- ^"Niger attacks launched from southern Libya: Niger's president".Reuters.25 May 2013. Archived fromthe originalon 27 May 2014.
- ^Areva Niger mine back at full production after Islamist attack,South Africa:Mining Weekly,2013
- ^"AREVA: At September 30, 2013: Backlog of €42bn".Reuters. Archived fromthe originalon 28 May 2014.Retrieved27 May2014.
- ^RFI.fi
- ^Left in the Dust – uranium mining in Niger// GreenpeaceVideo.YouTube.
- ^Orphans of the Sahara channel (23 January 2014)."Orphans of the Sahara: Exile".aljazeera.Al Jazeera.
- ^Orphans of the Sahara channel (23 January 2014)."Uranium mining in Niger: AREVA responds".aljazeera.Al Jazeera.
- ^"Athlenergy: The New Website for Track & Field and Running Enthusiasts".Areva.Retrieved24 June2014.
- ^"Areva Renews Its Partnership with the French Athletics Federation".Areva.Retrieved24 June2014.
- ^"DiamondLeague-Paris: The Website for Meeting Areva".Meeting Areva.Retrieved26 June2014.
- ^"SemideParis: The English-Language Website for the Paris Half Marathon".Paris Half Marathon. Archived fromthe originalon 5 June 2014.Retrieved26 June2014.
- ^"SainteLyon".Saintélyon. Archived fromthe originalon 13 September 2013.Retrieved26 June2014.
- ^"Areva extends with 1. FC Nürnberg but shrinks package".SportsProMedia.7 August 2012.
- ^"Areva powers down FC Nurnberg backing".Soccerex.9 August 2012. Archived fromthe originalon 26 June 2014.
- ^"French America's Cup yacht struck by Greenpeace protesters".The Guardian.20 May 2002.
- ^"French America's Cup yacht holed in Greenpeace protest".The Telegraph.19 May 2002.
External links
edit- Media related toArevaat Wikimedia Commons
- Official website
- "Framatome SA History".International Directory of Company Histories.FundingUniverse. 1998.