Howard Frankland Bridge

TheW. Howard Frankland Bridgeis the central fixed-link bridge spanningOld Tampa BayfromSt. Petersburg, FloridatoTampa, Florida.It is one of three bridges connectingHillsborough CountyandPinellas County;the others beingGandy BridgeandCourtney Campbell Causeway.The bridge carriesInterstate 275and is by far the most traveled of the bay's bridges.[1][2][3]

W. Howard Frankland Bridge
Aerial view of the bridge in 2018
Coordinates27°55′41″N82°35′15″W/ 27.92793°N 82.58755°W/27.92793; -82.58755
Carries8 lanes ofI-275
CrossesOld Tampa Bay
LocaleSt. PetersburgtoTampa,Florida
Other name(s)Howard Franklin, Frankland Bridge
Named forWilliam Howard Frankland
Maintained byFlorida Department of Transportation
ID number150107 (northbound)
150210 (southbound)
Characteristics
Total length15,872 ft (4,838 m) (northbound)
15,900 ft (4,846 m) (southbound)
Width58.4 ft (17.8 m) (northbound)
68.9 ft (21.0 m) (southbound)
Clearance below43 ft (13 m) (northbound)
48.9 ft (14.9 m) (southbound)
History
Opened1960 (northbound)
1990 (southbound)
Statistics
Daily traffic135,000 (2006)[1][2][3]
Location
Map

Work began in fall 2020 to rebuild this bridge with separate pedestrian and bicycle lanes, with completion expected in late 2025. The new bridge will be north of the existing bridge. As a result, traffic is able to use the existing bridge while the new, bigger bridge is being built. The existing southbound bridge will be converted to northbound lanes, once the new bridge is completed.[4]

The bridge is often incorrectly referred to as the HowardFranklinBridge.

History

edit
The original span looking west toward St. Petersburg

Named for the man who proposed it, Tampa businessman Howard Frankland, the bridge opened in April 1960 and carried four lanes (two lanes in each direction separated by a short, narrow barrier). The bridge and approaches cost $16 million.[5]

Because of the bridge's design, including its lack of emergency shoulders, it proved to be dangerous. Accidents were common on the bridge and traffic backed up on both sides, leading to local nicknames, the "Howard Frankenstein Bridge" and "The Car-Strangled Spanner".[6]In 1962, a steel-reinforced tapered concrete barrier was installed "to prevent cars from hurtling the median and crashing into oncoming traffic." Ten people had already died.[7]The bridge was the subject of a60 Minutesbroadcast in the 1960s noting the below-average construction methods used.[citation needed]

Planning for a larger-capacity replacement began in 1978. Original plans ranged from a large, multi-lane suspension (or similar type) bridge, to two parallel bridges (with the central span reserved for HOV lanes). As traffic projections increased, further exacerbated by a disaster on theSunshine Skyway Bridgein 1980, it was clear that the new bridge would need to handle at least eight lanes (four in each direction). By 1987, it was concluded that a parallel, four lane span would be built. Plans were also made to rehabilitate the older bridge after the new bridge opened.

Construction began on the new span in 1988. The new $54 million southbound span was opened to traffic in 1990. The older bridge was then closed, rehabilitated, and reopened in 1992. The older northbound span is shorter and has a steeper hump than the newer southbound span.

Bypass system

edit

Before the parallel bridge was built, I-275 utilized a bypass designation system. Whenever there would be a major delay at the Howard Frankland Bridge, special signs would alert drivers to the delay and direct them to utilize the bypass, which ran alongSR 694and across theGandy Bridge,to theLee Roy Selmon Expressway,Willow Avenue, Howard Avenue, and ending at Interstate 275. Special shields (marked N and S) along the route made sure that drivers were using the correct thoroughfare.[citation needed]

Reconstruction of the bridge

edit
I-275 Northbound approaching Exit 39 with redesigned and updated sign after Howard Frankland Bridge section.

After the widening project in 1992, Interstate 275 was increased to eight lanes on the bridge itself. However, this did not increase capacity on either end of the bridge. Backups were still seen on the Howard Frankland heading into Tampa, primarily due to a bottleneck at theSR 60/Veterans Expresswayexit. On the St. Petersburg side, after a comprehensive reconstruction project that took over ten years, lane counts were increased from four lanes prior to the bridge to six lanes through downtown St. Petersburg, and eight lanes from Gandy Boulevard to the bridge.

A reconstruction project was planned to begin in 2017 for the newGateway Expresswayproject, a plan to build a new toll road to connect different parts in Pinellas County. However, FDOT planned to reconstruct the interstate in smaller phases rather than the original larger two-phase project and the start of construction was delayed to 2020.

Once the reconstruction project is finished in 2025, major traffic congestion on the Howard Frankland bridge is expected to be significantly reduced by the addition of new lanes.[8]On January 7, 2021, FDOT postponed by a week to January 16, 2021 the start date for removing an overpass and the corresponding exit ramp over I-275. It had been scheduled to shut down by 8 p.m.,EST,January 9, through January 10. This work was part of the U.S. $600 million toll road project.[9]On January 16 to 17, 2021, workers removed the 4th street north interchange bridge (overpass) from 8 p.m. on January 16, to 12 p.m. on January 17. Exit 32 was closed until late 2021 while the new overpass is constructed.[10]

Overall construction on this large project began in fall 2020 and completion is expected in late 2025.[4]A completely new bridge will carry southbound traffic. Once that bridge is completed, the existing southbound bridge will be converted to carry northbound traffic. When all traffic is moved to the final alignment, the existing northbound bridge will be removed.[4]The newly built bridge for southbound traffic will include a separate pathway for pedestrian and bicycle traffic, and additional vehicle traffic lanes.[4]

See also

edit

References

edit
  1. ^ab2006 Average Annual Daily Traffic Counts in Pinellas County (A.A.D.T.)(PDF)(Map). Pinellas County Metropolitan Planning Organization. Archived fromthe original(PDF)on December 15, 2007.RetrievedJanuary 13,2008.
  2. ^ab PTMS and TTMS Sites, 2006, Pinellas County (15)(PDF)(Map). Florida Department of Transportation. Archived fromthe original(PDF)on February 16, 2008.RetrievedJanuary 13,2008.
  3. ^ab"2006 Annual Average Daily Traffic Report"(PDF).Florida Department of Transportation. pp. Site 0062. Archived fromthe original(PDF)on February 16, 2008.RetrievedJanuary 13,2008.
  4. ^abcd"I-275 (Howard Frankland Bridge) New southbound bridge between Pinellas and Hillsborough counties".Florida Department of Transportation.RetrievedMarch 27,2022.The new bridge is being built north of the current southbound/westbound (St. Petersburg to Tampa) interstate bridge. The new bridge will consist of eight lanes; four general use lanes, (Tampa to St. Petersburg) and four Express lanes; two lanes from the St. Petersburg side toward Tampa, two lanes from the Tampa side toward St. Petersburg. A bicycle/pedestrian pathway separated from the roadway will is also included. The existing southbound/westbound (Tampa to St. Petersburg) bridge will be converted to the new northbound/eastbound I-275 (St. Petersburg to Tampa). Once the new bridge is built and all traffic is moved to the final alignment, the existing northbound/eastbound (St. Petersburg to Tampa) bridge will be removed.
  5. ^Franklands to Play Key Role in Bridge OpeningSt. Petersburg Times, January 15, 1960
  6. ^TheFrancis Scott Key Bridgeon the Baltimore Beltway is also derisively referred to as "The Car Strangled Spanner," from which those stopped in traffic can actually seeFort McHenryand the harbor where the national anthem was written by thebridge's namesake.
  7. ^Bayway Paving Job to Start in Two Weeks[permanent dead link]St. Petersburg Times, January 30, 1962
  8. ^Hensen, Chuck (April 18, 2018)."GETTING THERE: Lanes to be added to Howard Frankland Bridge".Bay News 9.RetrievedMarch 27,2022.
  9. ^"Howard Frankland Bridge construction project postponed to Jan. 16".WFLA News Channel 8.Tampa, Florida. January 8, 2021.RetrievedMarch 27,2022.
  10. ^Arradondo, Briona (January 16, 2021)."Howard Frankland Bridge back open after overpass removal on Pinellas side".Fox 13 Tampa Bay.RetrievedMarch 27,2022.
edit