TheKariba Damis a double curvature concrete archdamin theKariba Gorgeof theZambeziriver basin betweenZambiaandZimbabwe.The dam stands 128 metres (420 ft) tall and 579 metres (1,900 ft) long.[1]The dam formsLake Kariba,which extends for 280 kilometres (170 mi) and holds 185 cubic kilometres (150,000,000 acre⋅ft) of water.
Kariba Dam | |
---|---|
Location | Zambia Zimbabwe |
Coordinates | 16°31′20″S28°45′42″E/ 16.52222°S 28.76167°E |
Construction began | 1955 |
Opening date | 1960 |
Construction cost | US$480 million |
Owner(s) | Zambezi River Authority |
Dam and spillways | |
Type of dam | Arch dam |
Impounds | Zambezi River |
Height | 128 m (420 ft) |
Length | 579 m (1,900 ft) |
Width (crest) | 13 metres (43 ft) |
Width (base) | 24 metres (79 ft) |
Reservoir | |
Creates | Lake Kariba |
Total capacity | 180 km3(150,000,000 acre⋅ft) |
Catchment area | 663,000 km2(256,000 sq mi) |
Surface area | 5,400 km2(2,100 sq mi) |
Maximum length | 280 km (170 mi) |
Maximum water depth | 97 m (318 ft) |
Power Station | |
Turbines | North:4 x 150 MW (200,000 hp), 2 x 180 MW (240,000 hp)Francis-type South:6 x 125 MW (168,000 hp), 2 x 150 MW (200,000 hp)Francis-type |
Installed capacity | North:960 MW South:1,050 MW Total:2,010 MW |
Annual generation | 6,400 GWh (23,000 TJ) |
Construction
editThe dam was constructed on the orders of the Government of theFederation of Rhodesia and Nyasaland,a 'federal colony' within theBritish Empire.The double curvature concretearch damwas designed byCoyne et Bellierand constructed between 1955 and 1959 byImpresitofItaly[2]at a cost of $135,000,000 for the first stage with only the Kariba South power cavern. Final construction and the addition of the Kariba North Power cavern byMitchell Construction[3]was not completed until 1977, due to largely political problems, for a total cost of $480,000,000. During construction, 86 construction workers lost their lives.[2][4]
The dam was officially opened byQueen Elizabeth The Queen Motheron 17 May 1960.[5][6]
Power generation
editThe Kariba Dam supplies 2,010 megawatts (2,700,000 hp) of electricity to parts of bothZambia(theCopperbelt) andZimbabweand generates 6,400 gigawatt-hours (23,000 TJ)per annum.Each country has its own power station on the north and south bank of the dam, respectively. The south station belonging to Zimbabwe has been in operation since 1960 and had six generators of 125 megawatts (168,000 hp) capacity each for a total of 750 megawatts (1,010,000 hp).[7][8]
On November 11, 2013 it was announced by Zimbabwe's Finance Minister,Patrick Chinamasathat capacity at the Zimbabwean (South) Karibahydropowerstation would be increased by 300 megawatts. The cost of upgrading the facility has been supported by a $319m loan from China. The deal is a clear example of Zimbabwe's "Look East" policy, which was adopted after falling out with Western powers.[9]Construction on the Kariba South expansion began in mid-2014 and was initially expected to be complete in 2019.[10]
In March 2018, presidentEmmerson Mnangagwacommissioned the completed expansion ofKariba South Hydroelectric Power Station.The addition of two new 150 megawatts (200,000 hp) turbines raised capacity at this station to 1,050 megawatts (1,410,000 hp). The expansion work was done bySinohydro,at a cost of US$533 million. Work started in 2014, and was completed in March 2018.[11]
The north station belonging to Zambia has been in operation since 1976, and has four generators of 150 megawatts (200,000 hp) each for a total of 600 megawatts (800,000 hp); work to expand this capacity by an additional 360 megawatts (480,000 hp) to 960 megawatts (1,290,000 hp) was completed in December 2013. Two additional 180 MW generators were added.[12][13][14]
Location
editThe Kariba Dam project was planned and carried out by the Government of theFederation of Rhodesia and Nyasaland.The Federation was often referred to as the Central African Federation (CAF). The CAF was a 'federal colony' within theBritish Empirein southern Africa that existed from 1953 to the end of 1963, comprising the former self-governing BritishcolonyofSouthern Rhodesiaand the formerBritish protectoratesofNorthern RhodesiaandNyasaland.Northern Rhodesia had decided earlier in 1953 (before the Federation was founded) to build a dam within its territory, on theKafue River,a major tributary of theZambezi.It would have been closer to Northern Rhodesia'sCopperbelt,which was in need of more power. This would have been a cheaper and less grandiose project, with a smaller environmental impact. Southern Rhodesia, the richest of the three, objected to a Kafue dam and insisted that the dam be sited instead at Kariba. Also, the capacity of the Kafue dam was much lower than that at Kariba.[15]Initially, the dam was managed and maintained by theCentral African Power Corporation.[16]The Kariba Dam is now owned and operated by theZambezi River Authority,[17]which is jointly and equally owned byZimbabweandZambia.[18]
Since Zambia's independence, three dams have been built on the Kafue River: theKafue Gorge Upper Dam,Kafue Gorge Lower Damand theItezhi-Tezhi Dam.[19]
Environmental impacts
editPopulation displacement and resettlement
editThe creation of the reservoir forced resettlement of about 57,000 Tonga people living along the Zambezi on both sides.[20]
There are many different perspectives on how much resettlement aid was given to the displaced Tonga. British authorDavid Howarthdescribed the efforts in Northern Rhodesia:
"Everything that a government can do on a meagre budget is being done. Demonstration gardens have been planted, to try to teach the Tonga more sensible methods of agriculture, and to try to find cash crops that they can grow. The hilly land has been plowed in ridge contours to guard against erosion. In Sinazongwe, an irrigated garden has grown a prodigious crop of pawpaws, bananas, oranges, lemons, and vegetables, and shown that the remains of the valley could be made prolific if only money could be found for irrigation. Cooperative markets have been organized, and Tonga are being taught to run them. Enterprising Tonga have been given loans to set themselves up as farmers. More schools have been built than the Tonga ever had before, and most of the Tonga are now within reach of dispensaries and hospitals."[21]
AnthropologistThayer Scudder,who has studied these communities since the late 1950s, wrote:
"Today, most are still 'development refugees'. Many live in less-productive, problem-prone areas, some of which have been so seriously degraded within the last generation that they resemble lands on the edge of the Sahara Desert."[22]
American writerJacques Leslie,inDeep Water(2005), focused on the plight of the people displaced by Kariba Dam, and found the situation little changed since the 1970s. In his view, Kariba remains the worst dam-resettlement disaster in African history.[23]
Basilwizi Trust
editIn an effort to regain control of their lives, the local people who were displaced by the Kariba dam's reservoir formed the Basilwizi Trust in 2002. The Trust seeks mainly to improve the lives of people in the area through organizing development projects and serving as a conduit between the people of the Zambezi Valley and their country's decision-making process.[24]
River ecology
editThe Kariba Dam controls 90% of the total runoff of the Zambezi River, thus changing the downstream ecology dramatically.[25]
Wildlife rescue
editFrom 1958 to 1961,Operation Noahcaptured and removed around 6,000 large animals and numerous small ones threatened by the lake's rising waters.[26]
Recent activity
editOn 6 February 2008, theBBCreported that heavy rain could lead to a release of water from the dam, which would force 50,000 people downstream to evacuate.[27] Rising levels led to the opening of the floodgates in March 2010, requiring the evacuation of 130,000 people who lived in the floodplain, and causing concerns that flooding would spread to nearby areas.[28]
In March 2014, at a conference organized by theZambezi River Authority,engineers warned that the foundations of the dam had weakened and there was a possibility of dam failure unless repairs were made.[29]
On 3 October 2014 the BBC reported that "The Kariba Dam is in a dangerous state. Opened in 1959, it was built on a seemingly solid bed of basalt. But, in the past 50 years, the torrents from the spillway have eroded that bedrock, carving a vast crater that has undercut the dam's foundations.… engineers are now warning that without urgent repairs, the whole dam will collapse. If that happened, a tsunami-like wall of water would rip through the Zambezi valley, reaching the Mozambique border within eight hours. The torrent would overwhelm Mozambique'sCahora Bassa Damand knock out 40% of southern Africa's hydroelectric capacity. Along with the devastation of wildlife in the valley, the Zambezi River Authority estimates that the lives of 3.5 million people are at risk. "[30]
In June 2015 The Institute of Risk Management South Africa completed a Risk Research Report entitledImpact of the failure of the Kariba Dam.It concluded: "Whilst we can debate whether the Kariba Dam will fail, why it might occur and when, there is no doubt that the impact across the region would be devastating."[31]
In January 2016 it was reported that water levels at the dam had dropped to 12% of capacity. Levels fell by 5.58 metres (18.3 ft), which is just 1.75 metres (5 ft 9 in) above the minimum operating level for hydropower. Low rainfalls and overuse of the water by the power plants have left the reservoir near empty, raising the prospect that both Zimbabwe and Zambia will face water shortages.[32]
In July and September 2018,The Lusaka Timesreported that work had started relating to the plunge pool and cracks in the dam wall.[33][34]
On 22 February 2019 Bloomberg reported "Zambia has reduced hydropower production at the Kariba Dam because of rapidly declining water levels" but "Zambia doesn't anticipate power cuts as a result of shortages".[35]On 5 August that year, the same publication reported that the reservoir was near empty, and that it may have to stop hydropower production.[36]
As of November 2020 the water level in the Kariba reservoir has remained steady around the 25% capacity, up from nearly half that in November 2019.[37]The Zambezi River Authority has stated that it is optimistic about rainfall estimates for the 2020/2021 rainfall season, allocating an increased amount of water for power production. At that time, the reservoir held 15.77 billion cubic meters of water, with the water line sitting at around 478.30 metres (1,569.23 ft), just above the minimum capacity for power generation of 475.50 metres (1,560.04 ft).[38]
It was reported in February 2022 that rehabilitation work has been underway since 2017 on the Kariba dam. The Zambezi River Authority (ZRA) said that work on the Kariba Dam Rehabilitation Project (KDRP), which includes efforts to reconfigure the plunge pool and rebuild the spillway gates, is scheduled to be finished in 2025. The rehabilitation of the dam is being financed by the European Union (EU), the World Bank, the Swedish government and the African Development Bank (AfDB), with the Zambian and Zimbabwe governments contributing counterpart funding. The project’s goal is to guarantee the structural integrity of the Kariba Dam, assuring the sustained generation of power primarily for the benefit of the inhabitants of Zimbabwe and Zambia and the broader Southern African Development Community area. The work on redesigning the plunge pool involves bulk excavating the rock in the current pool to assist plunge pool stabilization and avoid additional scouring or erosion along the weak fault zone towards the dam foundation. This reshaping work will be accomplished by constructing a temporary water-tight cofferdam to complete the reshaping work under dry conditions.[39]
An energy crisis due to drought and low water levels continued into January 2023, with water level falling to just 1% of capacity and output limited to 800 MW for a fraction of the day.[40][41]
Industrial power users have proposed a 250 MWfloating solarplant on Lake Kariba to improve electricity reliability.[42]
See also
editReferences
edit- ^"Kariba Dam".Columbia Encyclopedia, 6th Ed.Retrieved2007-07-31.
- ^abSpurwing factsArchivedNovember 5, 2009, at theWayback Machine
- ^Indictment: Power & Politics in the Construction Industry, David Morrell, Faber & Faber, 1987,ISBN978-0-571-14985-8
- ^"Hydroelectric Power Plants in Southern Africa".Power Plants Around the World Photo Gallery.Industry Cards. Archived fromthe originalon 19 July 2009.Retrieved20 February2014.
- ^"Opening of Kariba Dam by HM The Queen Mother, May 1960".National Archives.Retrieved10 September2021.
- ^"PHmuseum: The Double Spiritual Nature of Lake Kariba".19 July 2021.Retrieved10 September2021.
- ^"Kariba Dam, Zambia and Zimbabwe; Final Report: November 2000"(PDF).World Commission on Dams. 2000. p. VI. Archived fromthe original(PDF)on 2010-06-13.Retrieved2010-11-17.
- ^"Hydroelectric Power Plants in Southern Africa".IndustCards. Archived fromthe originalon 19 July 2009.Retrieved17 July2014.
- ^'No talks with the West' - ZimbabweArchived2013-12-15 at theWayback MachineZimbabwe Mail,10 May 2013
- ^"Zimbabwe: Kariba South Power Expansion On Course".The Herald. 17 August 2015.Retrieved31 December2015.
- ^Forum on China-Africa Cooperation (30 March 2018)."Zimbabwe Commissions Chinese-Built Power Plant".Beijing: Forum on China-Africa Cooperation.Retrieved31 March2018.
- ^"DBSA provides $105m for Zambia hydropower expansion".Cramer Media's Engineering News. 5 November 2010.Retrieved17 November2017.
- ^"President Michael Sata commissions the Kariba North Bank extension hydro power station".Lusaka Times. 4 December 2013.Retrieved17 July2014.
- ^"Zambia, Kariba Hydropower Plant, North bank extension".SinoHydro.Retrieved17 July2014.
- ^"Kariba Dam, Zambia and Zimbabwe; Final Report: November 2000"(PDF).World Commission on Dams. 2000. p. 9. Archived fromthe original(PDF)on 2010-06-13.Retrieved2010-11-17.
- ^"Agreement relating to the Central African power corporation signed at Salisbury".25 November 1963.Retrieved24 September2016.
- ^"Kariba Dam water levels will soon improve, says Zambezi River Authority".Lusaka Times. 17 February 2016.Retrieved24 September2016.
- ^"Legal Status".Zambezi River Authority. Archived fromthe originalon 2010-04-06.Retrieved2012-09-23.
- ^Zesco: "History of Itezhi-Tezhi"Archived2005-09-07 at theWayback Machinewebsite accessed 1 March 2007.
- ^Terminski, Bogumil (2013)."Development-Induced Displacement and Resettlement: Theoretical Frameworks and Current Challenges".Indiana University.
- ^Howarth, David,The Shadow of the Dam.Collins, 1961
- ^"Pipe Dreams: Can the Zambezi River supply the region's water needs?".Cultural Survival Quarterly.Archived fromthe originalon 2007-09-27.Retrieved2007-07-31.
- ^"When Elephants Fight".Columbia Journalism Review.Archived fromthe originalon 2007-09-30.Retrieved2007-07-31.
- ^"Basilwizi Trust: About Us".basilwizi.org.Basilwizi.Retrieved2020-12-09.
- ^"The Zambezi Valley: damned by dams"(PDF).Retrieved25 July2018.
- ^"Operation Noah".Retrieved25 July2018.
- ^"Flood gates to open in Mozambique".February 6, 2008 – via news.bbc.co.uk.
- ^"Zambia opens dam to alleviate flooding".March 15, 2010 – via news.bbc.co.uk.
- ^IRIN (9 April 2014)."Kariba Dam and Zim disaster preparedness".New Zimbabwe.Archived fromthe originalon 11 April 2014.Retrieved10 April2014.
- ^"The marooned baboon: Africa's loneliest monkey".BBC. 3 October 2014.Retrieved3 October2014.
- ^"Impact of the failure of the Kariba Dam"(PDF).International Rivers.Retrieved25 February2019.
- ^"Kariba dam drops to record low 12%, and Zimbabwe, Zambia stare at a nightmare".Mail & Guardian Africa.2016-01-20.Retrieved2016-02-18.
- ^"Kariba dam rehabilitation works are progressing well".Lusakatimes.19 July 2018.Retrieved25 February2019.
- ^"Initial rehabilitation works on the Dam Wall at Lake Kariba has started".Lusakatimes.5 September 2018.Retrieved25 February2019.
- ^"Zambia Cuts Power From World's Biggest Man-Made Reservoir".Bloomberg.22 February 2019.Retrieved25 February2019.
- ^Hill, Matthew; Ndlovu, Ray (5 August 2019)."Power-Starved Zimbabwe, Zambia Face Further Drought-Induced Blackouts".Bloomberg.Retrieved9 October2019.
- ^"Kariba Reservoir Data | Zambezi River Authority".zambezira.org.Retrieved2020-11-22.
- ^"ZRA allots more water for Kariba generation".Zimbabwe Situation.2020-11-09.Retrieved2020-11-23.
- ^Otieno, Patrick (May 13, 2014)."Kariba Dam Rehabilitation Project (KDRP) Updates".Construction Review Online.
- ^Ajasa, Amudalat (January 4, 2023)."Low water levels have created an energy crisis at the world's largest dam".Washington Post.
- ^"Power crisis looms in Zambia as world's largest man-made dam dries up".LifeGate.2023-01-25.Retrieved2023-07-06.
- ^"Zimbabwe Industrial Power Users Aim to Raise $250 Million for Floating Solar Panels - BNN Bloomberg".BNN.2023-07-05.Retrieved2023-07-06.