TheShanghai Metro(Chinese:Thượng Hải tàu điện ngầm;pinyin:Shànghǎi Dìtiě;Shanghainese:Zaon6he5Di6thiq7) is arapid transitsystem inShanghai,operating urban and suburban transit services to 14 of its 16municipal districts[d]and to the neighboring township ofHuaqiao,inKunshan,Jiangsu Province.

Shanghai Metro
A line 7 train at Meilan Lake station
Overview
OwnerShanghai Municipal Government
Area servedShanghaiandKunshan,Jiangsu
LocaleShanghai
Transit typeRapid transit
Number of lines20[a]
Number of stations507[b](transfer stations counted repeatedly, according to number of lines serving the station)
409 (interchange stations counted once)
Daily ridership10.03 million (2023 avg.)[1]13.39 million (record)[2]
Annual ridership3.661 billion (2023)[1]
Websiteshmetro
Operation
Began operationMay 28, 1993;31 years ago(1993-05-28)
Operator(s)Six subsidiaries (list) ofShanghai Shentong Metro Group Co. Ltd.
CharacterGrade separated
Number of vehicles7,394 revenue railcars (list)[3]
14 depots and 15 yards (list)
Technical
System length896 km (556.7 mi)[4][c]
Track gauge1,435 mm(4 ft8+12in)standard gauge
Electrification1,500 V DCfromoverhead catenaryorthird rail(Lines16and17)
750 V DCthird rail (Pu gian g line)
Top speed120 km/h (75 mph) (Line 16)
100 km/h (62 mph) (Lines11and17)
80 km/h (50 mph) (other lines)
System map

Shanghai Metro
Simplified ChineseThượng Hải quỹ đạo giao thông
Traditional ChineseThượng Hải quỹ đạo giao thông
Literal meaningShanghai Rail Transit
Transcriptions
Standard Mandarin
Hanyu PinyinShànghǎi Guǐdào Jiāotōng
Bopomofoㄕㄤˋㄏㄞˇㄍㄨㄟˇㄉㄠˋㄐㄧㄠ ㄊㄨㄥ
Wade–GilesShang4-hai3Kui3-tao4Chiao1-t'ung1
Wu
RomanizationZaanhe kuedau jiau thon[zɑ̃˨hɛ˦kuɛ˧dɔ˥tɕiɔ˨tʰoŋ˨]
Commonly abbreviated as
Simplified ChineseThượng Hải tàu điện ngầm
Traditional ChineseThượng Hải tàu điện ngầm
Literal meaningShanghai Subway
Transcriptions
Standard Mandarin
Hanyu PinyinShànghǎi Dìtiě
Bopomofoㄕㄤˋㄒㄞˇㄉㄧˋㄊㄧㄝˇ
Wu
RomanizationZånhae dithih

Forming the vast majority of the broader, multi-operatorShanghai rail transitnetwork, the Shanghai Metro system is the world'slongest metro system by route length,totaling 896 kilometres (557 mi)[5][6][c]and thesecond largest system by number of stations,with508 stationsacross 20 lines.[a][b]It also ranksfirst in the world by annual ridership,with 3.88 billion rides delivered in 2019.[7]The last daily ridership record was set on 9 March 2024, at 13.39 million rides.[2]Since thepandemic,ridership still routinely stands at over 10 million on an average workday, accounting for 73% of trips on public transport in the city.[8][9]

History

edit
Evolution of the Shanghai Metro

Opening to the public in 1993[10]: 19 with full-scale construction extending back to 1986, the Shanghai Metro is the third-oldest rapid transit system inmainland China,after theBeijing Subwayand theTianjin Metro.Though actual construction and inauguration of the Shanghai Metro succeeded its counterparts in Beijing and Tianjin, their initial planning would date back to the same period, during the late 50s and early 60s, before the impact of theCultural Revolution.

The system saw its most rapid expansion during the years leading up to the2010 World Expo,namely, between 2003 and 2010. Between 2007 and 2010, it was customary for new lines and extensions to open on an annual basis. The system is still expanding, with the most recent expansions opening in early 2024, and several new lines and extensions under construction.

1950-1965: Proposals and early groundbreaking

edit

The first proposal of a subway system for Shanghai dates back to the year 1950. Against the backdrop of the air raids of Shanghai by the retreatingNationalistforces in that year, a team ofSoviettechnical specialists visiting the city made a proposal to the Municipal Committee on Urban Planning and Design for a dual-purpose underground railway system, to be used for mass transit during peace times, and as shelter facility in times of war. It was later, in 1953, during confidential consultations held with Soviet urban planning specialists by Li Gancheng, the then-Deputy Chief and Party Secretary of the Municipal Construction Committee in Shanghai, that the initial concepts of a north-south line and an east-west line were pencilled on a map of the city, which would later becomeLine 1andLine 2.[11]Further consultations and public surveys on transit needs were held in 1959 by a Municipal Planning Committee for Underground Railway, in conjunction with the Municipal Public Utilities Management Bureau, and identified multiple alternative plans for a subway system.

In 1960, with a newly-formed a Bureau of Tunnel Engineering, the city undertook an experimentalshieldtunneling project in Tangqiao,Pudong,excavating a tunnel with a 4.2m-diameter shield for over 100 meters. DubbedProject 60,this project was carried out in strict confidentiality.[11]In August 1964, the Tunnel Engineering section of the Municipal Urban Construction Bureau completed the route selection phase for the north-south line (laterLine 1), which was eventually to connect key locations in the downtown core, including the Shanghai Cultural Square,People's Squareand the thenShanghai North railway station,with the rapidly industrializing and urbanizing northern districts ofZhabeiandBaoshan,including the industrial zone inPengpu,the worker's residential area in Zhangmiao, and the town ofWusong.It is ostensibly in this same period that, in 1965, another experimental project on underground tunnel and station construction was underway in a segment between Hengshan Park and Xiangyang Park, both inXuhui.However, construction halted during the immediately subsequentCultural Revolutionperiod, and no systematic plan to build an underground railway system materialized.

The 1980s: Renewed plans and initial construction ofLine 1

edit

The economic reforms of 1980s and the rapidly increasing demand for efficient urban public transit saw a swift resurrection of plans for a rapid rail transit system in Shanghai. In 1983, a jointly-published "Proposal on the Construction of a North-South Rapid Rail Transit Line" by the Municipal Planning Committee, the Municipal Construction Committee, in collaboration with the Municipal Bureaus of Urban Planning, of Public Infrastructure, of Railways and of Public Works, called for a rail transit line to be built which connects the city center withMinhangandJinshanin the south-southwest, and withWusongandBaoshanin the north-northeast, clearly echoing the initial north-south line concept of the 1950s-60s, though couched in this period in terms of the City's new master plan to "develop both the north and the south wings."[12]Subsequently, in August 1985, a Project Planning Report submitted to the Municipal Planning Committee and the Municipal Committee on Urban and Rural Construction and Management by the Preparation Working Group on the North–South Rapid Rail Transit Line prioritizes theXinlonghua-to-New railway stationsegment, and makes a conclusive case for the route of the previously-indeterminate middle segment of the line to be placed underHuaihai Road.Thus, the first stage of the first underground railway line, laterLine 1,was determined.

Formal central government-level approval of both the construction of Line 1 and a long-term system-wide plan for the Shanghai Metro came in 1986. In that year, theState Councilapproved the Master City Plan of Shanghai (1983–2000), the first-ever such approval by the State Council in the history of Shanghai. Part of that Master Plan included a 40-year phased program that would eventually see the construction of 11 metro lines covering over 325 km by 2025.[13]On August 14, 1986, the State Council approved the "Proposal Concerning Construction of Shanghai City Subway Line fromXinlonghua StationtoShanghai Railway Station,"[14]clearing the pathway for the beginning of construction of Line 1.

1993–2002: Inauguration and initial expansion

edit

The southern section ofline 1(four stations) opened on May 28, 1993. The full line (including middle and northern sections) eventually opened on April 10, 1995, and in the first year, it handled an average of 600,000 passengers daily.[15]The first phase ofline 2was inaugurated in June 2000, which in 2010 linked Hongqiao International Airport (SHA) and Pudong International Airport (PVG). The 25 kmPearl line (line 3)opened for revenue service in 2001.Line 5opened in 2003.Line 4joined the network in January 2006 and became a circular line in 2007.

The Master Plan of Shanghai Metro-Region 1999–2020 was approved by the State Council of China on May 11, 2001.[16]The plan had 17 lines in total, containing four intra-city-region express rail lines, eight urban metro lines, and five urban light-rail lines with a total length of about 780 kilometers. The total length of the planned MRT network in the central city will add up to 488 kilometers. In addition, Shanghai will strengthen the development of the suburban rail transport network so that it can link to and coordinate with state rail lines, metro lines, and light railways. One or two rail transport lines are planned between every new city and the central city.

2003–2010: Rapid expansion for the Expo 2010

edit

In 2003 when the length was only 3 lines, 65 kilometers (with a further 5 lines already under construction), Shanghai was named host city for the World Expo 2010, plans were made to extend the length of the Metro to 400 kilometers by the time it opened in 2010.[17]Thereby it completed the initial 40-year plan 15 years ahead of schedule. During Expo 2010 the metro system consisted of 11 lines, 407 km, and 277 stations.

2011–2021: Completion of a master plan

edit

In 2009 Shanghai announced it would have21 linesoperating by 2020 with lines extending further into the suburban areas. At the end of 2021 (expected), most of the lines of the plan were opened (with an exemption of line 20, Jiamin line, and Chongming line) leading to 19 lines (line 1-18 and Pu gian g), 802 km, 516 stations.

On October 16, 2013, with the extension ofline 11intoKunshaninJiangsuprovince (about 6.5 km), Shanghai Metro became the first rapid transit system in China to provide cross-provincial service and the second intercity metro after theGuangfo Metro.

2021 onwards: Phase III construction

edit

The National Development and Reform Commission has approved the 2018-2023 construction plan for the city's Metro network. The construction of five new metro lines (and two commuter rail lines) and two extensions to opened lines are expected to take five to six years and are planned to start construction before 2023. After completion, there will be 27 metro and commuter rail lines covering 1,154 kilometers.

With the Shanghai Master Plan, 2017-2035 more emphasis was put on other rail transit modes. The plan calls for a comprehensive transportation system that consists of multimodel rail transit. Intercity lines (intercity railway, municipality railway, and express railway), urban lines (subway and light rail), and local lines (modern tramcar, rubber-tired transit system) in a length of more than 1,000 km each.[18]

By 2035, public transportation will account for over 50% of all means of transportation, and 60% of rail transit stations in the inner areas of the main city will have 600m of land coverage. According to the NDRC, the Shanghai Metro network (including commuter rail) will cover 1,642 kilometers in total by 2030 and more than 2,000 kilometers by 2035.[19]

Ridership

edit

Since 1993, the ridership of the entire network has grown as the new lines or sections come into operation. In 1995, the first year of operation, line 1 carried 62 million passengers (average daily passenger volume of 223,000).[20]Ridership increased between 2011 and 2016 with 10% per annum, between 2017 and 2019 with 5%. The reduction in ridership in 2020 is due to COVID-19.[21]Ridership recovered to close to pre-covid levels in 2021, with a ridership on December 31 of 13.014 million.

Average daily ridership
Year (in millions)
2003
1.252
2004
1.452(+16%)
2005
1.627(+23.8%)
2006
1.797(+10.4%)
2007
2.230(+24.1%)
2008
3.082(+38.2%)
2009
3.611(+17.2%)
2010
5.162(+43.0%)
2011
5.759(+11.6%)
2012
6.219(+8.0%)
2013
6.866(+10.4%)
2014
7.745(+12.8%)
2015
8.405(+8.5%)
2016
9.292(+10.6%)
2017
9.693(+4.3%)
2018
10.164(+4.9%)
2019
10.641(+4.7%)
2020
7.746(-27.2%)
2021
9.780(+26.3%)
2022
6.436(-34.2%)
2023
10.023(+55.9%)
Peak passenger numbers over time (thousands)[e]
September 25, 2015[22] December 31, 2015[23] April 1, 2016[f] March 3, 2017[24] March 17, 2017[25] April 28, 2017 March 9, 2018[g][26] March 14, 2018[27] March 8, 2019[g][28] March 8, 2024[g][29]
Total ridership 10,343 10,830 11,299 11,559 11,792 11,867 12,231 12,306 13,294 13,397
Transfers 4,340 4,435 4,886 4.977 5,240 5,240 5,931
Line1 1,370 1,410 1,420 1,370 1,410 1,430 1,410 1,410 1,507* 1,280
Line2 1,770 1,750 1,770 1,770 1,830 1,850 1,820 1,860 1,903 1,458
Line3 610 600 640 610 630 640 610 610 621 469
Line4 940 890 950 940 950 950 950 960 976* 763
Line5 160 170 180 170 170 170 160 160 221* 208
Line6 440 450* 470 490 500* 490 480 480 520* 472
Line7 850 800 890 920* 920 900 950 960* 958 782
Line8 1,080 1,080 1,080 1,110 1,120* 1,120 1,160* 1,150 1,221* 1,100
Line9 940 970* 970 1,010* 1,020* 1,020 1,150* 1,150* 1,228* 1,243
Line10 860 860 880 910 940 960 990* 1,000* 1,067* 1,007
Line11 740 800* 860 920* 940* 960 960 950 1,012* 1,056*
Line12 220 540* 620 700 710 710 740 740 826* 844*
Line13 200 340 370 450* 450* 430 490* 500* 710* 712
Line14 505*
Line15 418*
Line16 160 180 190 210 220 230 230 230 254 252
Line17 120 120 175* 234
Line18 555*
Pu gian g 36* 38

Lines

edit

In service

edit

There are currently 19 lines in operation, with lines and services denoted numerically as well as by characteristic colors, which are used as a visual aid for better distinction on station signage and on the exterior of trains, in the form of a colored block or belt.

Most tracks in the Shanghai Metro system are served by a single service; thus "Line X" usually refers to both the physical line and its service. The only exception is the segment shared by lines3and4,betweenHongqiao Road stationandBaoshan Road station,where both services use the same tracks and platforms.

Map of the current network
Line Termini
(District)
Commencement Latest extension Length Stations Ref.
1 Fujin Road
(Baoshan)
Xinzhuang
(Minhang)
May 28, 1993 December 29, 2007 36.4 km
(22.62 mi)
28 [30]
2 National Exhibition and Convention Center
(Qingpu)
Pudong Airport Terminal 1&2
(Pudong)
September 20, 1999 April 8, 2010 63.8 km
(39.64 mi)
30 [31]
3 North Jiangyang Road
(Baoshan)
Shanghai South Railway Station
(Xuhui)
December 26, 2000 December 18, 2006 40.3 km
(25.04 mi)
29[h] [32]
4 Loop line December 31, 2005 December 29, 2007 33.7 km
(20.94 mi)[i]
26[h] [34]
5 Xinzhuang
(Minhang)
Minhang Development Zone
(Minhang)

Fengxian Xincheng
(Fengxian)

November 25, 2003 December 30, 2018 32.7 km
(20.32 mi)
19 [35]
6 Gangcheng Road
(Pudong)
Oriental Sports Center
(Pudong)
December 29, 2007 April 12, 2011 32.3 km
(20.07 mi)
28 [36]
7 Meilan Lake
(Baoshan)
Huamu Road
(Pudong)
December 5, 2009 December 28, 2010 44.2 km
(27.46 mi)
33 [37]
8 Shiguang Road
(Yangpu)
Shendu Highway
(Minhang)
December 29, 2007 July 5, 2009 37.4 km
(23.24 mi)
30 [38]
9 Shanghai Song gian g Railway Station
(Song gian g)
Caolu
(Pudong)
December 29, 2007 December 30, 2017 65.6 km
(40.76 mi)
35 [39]
10 Jilong Road
(Pudong)
Hongqiao Railway Station
(Minhang)


Hangzhong Road
(Minhang)

April 10, 2010 December 26, 2020 44.9 km
(27.90 mi)
37 [40]
11 North Jiading
(Jiading)

Huaqiao
(Kunshan, Jiangsu)

Disney Resort
(Pudong)
December 31, 2009 April 26, 2016 82.4 km
(51.20 mi)
39 [41]
12 Qixin Road
(Minhang)
Jinhai Road
(Pudong)
December 29, 2013 December 19, 2015 40.4 km
(25.10 mi)
32 [42]
13 Zhang gian g Road
(Pudong)
Jinyun Road
(Jiading)
December 30, 2012 December 30, 2018 38.8 km
(24.11 mi)
31 [43]
14 Fengbang
(Jiading)
Guiqiao Road
(Pudong)
December 30, 2021 N/A 38.5 km
(23.92 mi)
30 [4]
15 Gucun Park
(Baoshan)
Zizhu Hi-tech Park
(Minhang)
January 23, 2021 N/A 42.3 km
(26.28 mi)
30 [44]
16 Longyang Road
(Pudong)
Dishui Lake
(Pudong)
December 29, 2013 December 28, 2014 59.0 km
(36.66 mi)
13 [45]
17 Hongqiao Railway Station
(Minhang)
Xicen
(Qingpu)
December 30, 2017 November 30, 2024 41.6 km
(25.85 mi)
14 [46]
18 South Chang gian g Road
(Baoshan)
Hangtou
(Pudong)
December 26, 2020 December 30, 2021 36.5 km
(22.68 mi)
26 [47]
Pu gian g Shendu Highway
(Minhang)
Huizhen Road
(Minhang)
March 31, 2018 N/A 6.7 km
(4.16 mi)
6 [48]
Total 808km[c] 507[b] [49]

Future expansion

edit

The Shanghai Metro system is one of the fastest-growing metro systems in the world. Ambitious expansion plans call for 25 lines with over 1,000 km (620 mi) of length by 2025.[50]By then, every location in the central area of Shanghai will be within 600 m (2,000 ft) of a subway station.[51]Shanghai metro is connected with the metro system ofSuzhou Rail Transit;[52]the Suzhou Rail Transitline 11connects Shanghai Metroline 11with Suzhou Rail Transitline 3.[53]

Network map of scheduled network as of the latest approval.
Planned opening date Line Name Terminals Length Stations Status Ref.
TBA 14 Infill station Longju Road 1 Pending [4]
2 Phase III western extension National Exhibition and Convention Center Panxiang Road 1.7 km
(1.06 mi)
1 Under construction[54] [55]
12 Western extension Qixin Road Dongjing 17.2 km
(10.69 mi)
6 Under construction[56]
13 Western extension Jinyun Road National Exhibition and Convention Center 9.8 km
(6.09 mi)
5 Under construction[57]
13 Eastern extension Zhang gian g Road Dangui Road 4.1 km
(2.55 mi)
2 Under construction[9]
15 Southern extension Zizhu Hi-tech Park Wangyuan Road 11.4 km
(7.08 mi)
4 Under construction[58]
2025[59] 18 Phase II Kangwen Road South Chang gian g Road 8.1 km
(5.03 mi)
6 Under construction[60]
2027[61] 19 Phase I Baoshan Railway Station Hong gian Road 46.17 km
(28.69 mi)
34 Under construction[62]
2031[63] 19 Northern extension Zhoujiazui Road Hong gian Road 44.5 km (27.65) 17 Under construction[62]
2027[64] 20 Phase I West Section Jinchang Road Shanghai Circus World 7.2 km
(4.47 mi)
7 Under construction[65]
TBA 20 Rest of Phase I and eastern extension Shanghai Circus World Xinyuan Road 20.6 km
(12.80 mi)
20 Pending EIA
2026[66] 21 Phase I Dongjing Road Tanghuang Road 28 km
(17.40 mi)
17 Under construction[67]
2027[68] 21 Phase I Eastern extension Tanghuang Road Pudong Airport Terminal 3 14.0 km
(8.70 mi)
6 Under construction[69]
TBA 22 Phase I Jinji Road Yu'an 42.8 km
(26.59 mi)
8 Under construction[70]
23 Phase I Shanghai Stadium Minhang Development Zone 28 km
(17.40 mi)
22 Under construction[67]
1 Southern extension Xinzhuang Humin Road 1.2 km
(0.75 mi)
1 Shelved [71]
2 Southern extension Pudong Airport Terminal 1&2 Pudong Airport Terminal 3 4 km
(2.49 mi)
1 Long-term planning
5 Southern extension reserve Fengxian Xincheng Pingzhuang Highway 3.5 km
(2.17 mi)
1 Phase 2 reserved station
9 Eastern extension remaining section Caolu Caolu Railway Station 3 km
(1.86 mi)
1

Infrastructure

edit

Rolling stock

edit
Aline 10train atJilong Road station

There are currently over 7,000 railcars in the Shanghai metro system. The train fleet reached 1,000 cars in 2007, 2,000 cars in 2012, and 3,000 cars in 2016, the 4,000th car was delivered on December 17, 2016, the 5,000th car was delivered on July 20, 2018.[72]The 7,000th car was delivered on December 25, 2020.[3]

Number of revenue railcars in the Shanghai metro system
Year 2007 2012 2016 December 17, 2016 July 20, 2018 May 28, 2020 December 28, 2020
Number of railcars 1,000 2,000 3,000 4,000 5,000 6,000 7,000
Average daily ridership (million) 2.23 6.219 9.292 9.292 10.164 7.746 7.746
Average no. of daily ridership per railcar 2,230 3,110 3,097 2,323 2,033 1,291 1,107

Most lines currently use semi-automatic train operations (STO/GoA2). Starting and stopping are automated, but a driver operates the doors, drives the train if needed and handles emergencies. The exceptions being:

  • Lines2,5and17:Driverless train operations (DTO/GoA3) train attendant operates the doors and drives the train in case of emergencies.
  • Lines10,14,15,18andPu gian g line:Unattended train operations (UTO/GoA4) starting and stopping, operation of doors are all fully automated without any on-train staff. With a total length of 169 km it is the world's 2nd largest fully automated metro system, after theSingapore MRT.[73]

Most lines currently use 6 car sets, with the exceptions being:

On most lines the maximum operating speed is 80 km/h (50 mph), with the exceptions being:

  • Lines11and17the maximum operating speed is 100 km/h (62 mph).
  • Line 16the maximum operating speed is 120 km/h (75 mph).

Pu gian g lineis the only line using cars withrubber tiresrunning on concrete tracks.

All subway cars have air-conditioning. During summer of 2021 the subway's first and last carriages on Metro lines 3-5, 10-13, and 15-18 will be 2 degrees Celsius warmer than the other carriages, the air-conditioning is adjustable for different carriages on these lines. The measure aims to address the needs of some passengers who find the trains "too cold," especially the elderly and children.[75]

Platform screen doors

edit
Platform screen doorsinstalled atXujiahui stationonline 1

Almost all stations have (full height)platform screen doorswith slidingacrylic glassat the platform edge. Only half height doors calledautomatic platform gates[76]are placed at most of the elevated sections and the section ofline 2fromSonghong RoadtoLongyang Road.The train stops with its doors lined-up with the sliding doors on the platform edge and open when the train doors open, and are closed at other times.

During construction of the early lines conditions were reserved for the installation of platform screen doors but not installed, due to cost considerations and no domestic companies making them at the time. In the early 2000s, before the screen doors were installed, the annual suicide rate on the Shanghai subway system averaged about eight.[77]In 2003 Shanghai Metro Operation Technology Development Co., Ltd. developed domestically platform screen doors with costs only 40% of imported platform screen doors (they cost over RMB6 million each to install).[78]Shanghai Circus World,opened December 28, 2004, was the first station to have installed platform screen doors. To help cope with passenger handling, platform safety doors were built forline 4onwards[j]and a program for retrofitting older lines was put in place.[79]The retrofitting on existing lines started in November 2005 withline 1(first station wasXujiahui) whose core stations had doors by the end of 2006.[80]Originally, platform screen doors were adopted to prevent cool or hot air from leaving the station to reduce electricity usage.[citation needed]

Renewable energy

edit

Shanghai metro started building solar plants from 2013 and the process has been accelerated since 2019, with plans to build rooftop solar plants with a total electricity generation capacity of 30 to 50 megawatts between 2021 and 2025. In 2021 it owned through it subsidiary Shanghai Metro New Energy Co., Ltd. ten rooftop solar plants on depots and parking lots (Chuanyanghe, Zhibei, Jinqiao, Longyang Road, Sanlin, Fujin Road, Zhongchun Road, Beizhai Road, Chentai Road and Pu gian g Town) generating an average annual power generation of about 23 million kwh.[81]Annual electricity consumption of Shanghai Metro exceeds 2.5 billion kWh.

Stations

edit

There is cellular phone network coverage across the network. In 2020, all stations provided 5G network coverage.[82]Free WiFi is also provided.[83]There are toilets for passengers in more than 90% metro stations in Shanghai.[84]The system is 100% wheelchair accessible, with elevators at all stations.[85]

Safety

edit

Riders are subject to searches of their persons and belongings at all stations by security inspectors using metal detectors, X-ray machines. Items banned from public transportation such as "guns, ammunition, knives, explosives, flammable and radioactive materials, and toxic chemicals" are subject to confiscation.[86]

Stations are equipped with closed-circuit television. Police use it to arrest pickpockets caught on CCTV, for example.[87]

Smoking is strictly prohibited in the metro premises. Bicycles (including folding bikes) and pets (including cats, dogs etc.) are not allowed in stations. The use of skateboards, roller skates and other equipment is not allowed in stations and carriages.[88]

Since April 1, 2020, there is a national ban on "Uncivilized Behavior" on China's Subways, which also includes conduct rules cracking down on bad subway etiquette, such as stepping on seats, lying down on a bench or floor and playing music or videos out loud. It also bans eating and drinking on subway cars nationwide, with exceptions for infants and people with certain medical conditions.[89]

FirstAEDs(automatic external defibrillator) were installed at Metro stations in 2015, with all metro stations having AEDs at the end of 2021.[90]

Passenger information systems

edit

Plasma screens on the platforms show passengers when the next two trains are coming, along with advertisements and public service announcements. The subway cars containLCDscreens showing advertisements and on some lines, the next stop, while above-ground trains haveLEDscreens showing the next stop. The LED screens are being phased in online 1and are also included in lines7and9,two underground lines.

Station signs are in Simplified Chinese and English. There are recorded messages stating the next stop in Mandarin, English, and (on lines16and17only)Shanghainese,[91][92]but the messages stating nearby attractions or shops for a given station (a form of paid advertising) are in Mandarin only. The metro operating company is resistant to expanding use ofShanghainesefor announcing stops, on the basis that, on most lines, the majority of passengers can understand either Mandarin or English.[93]

The Metro authority has tested a new systematic numbering system for stations online 10,but did not extend it to other lines.[94]

On December 31, 2009, Shanghai launched awebsiteArchivedOctober 25, 2018, at theWayback Machinedisplaying real-time comprehensive passenger flow information, each station and line is displayed as either green (normal operation), yellow (crowded), and red (suspended/not in operation).

Operations

edit

Short turn service patterns

edit

Short turnservice patterns exist on all lines exceptline 16.Partial services serve only a (usually busier) sub-segment of the entire physical line.[30][31][32][34][36][37][38][39][40][41][42][43][44][46]

Line 11,one of the three branch lines of the metro system, operates a different short turn service pattern. Trains traveling to and from the branch line terminate atHuaqiao StationandSanlinrespectively. Hence, a passenger who wants to travel from the terminus of the branch toDisney Resort,the eastern terminus of the line, must change trains.[41]

Express services

edit

Line 16,unlike the rest of the system, is built withpassing loopsand operates express and rapid services. The service was postponed on January 30, 2014, due to lack of available trains, but resumed on March 21, 2016.[95][96][97]

Operating hours and train intervals

edit

The operating hours for most Shanghai metro stations starts between 5:00 to 6:00 in the morning and ends between 22:30 to 23:00CST.The current timetable is available on theShanghai metro website.

The interval of trains during peak hours differ between 1 minutes and 50 seconds on line 9 and 6 minutes on line 18. Lines in the inner sections have train intervals under three minutes during morning peak hours and under 3 minutes and 45 seconds during evening peak hour. The more suburban outer sections, outside peak hours train intervals are longer.

Headways by line
Line 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Pu gian g
Inner sections Morning peak 2'30 2'30 5'00 3'10 2'30 2'00 1'55 2'00 1'50 2'30 2'00 2'30 2'30 3'20 3'40 3'30 3'30 3'00
Mid-day 4'00 4'00 7'00 8'00 4'30 4'30 5'30 4'20 5'30 4'00 6'00 6'00 6'00 6'00 8'00 7'00 10'00 7'00
Evening peak 3'00 3'00 5'00 5'00 3'00 2'30 2'44 2'45 2'30 3'00 3'00 3'45 3'00 4'00 4'30 4'00 4'00 3'30
Weekend daytime 4'00 3'40 4'00 6'30 4'00 3'20 5'00 3'40 5'00 3'45 5'00 6'00 5'00 5'00 6'00 5'00 7'00 6'30
Other hours 4'00- 5'00- 6'30- 5'00- 7'30- 5'00- 5'00- 5'00- 6'00- 5'00- 6'00- 6'00- 6'00- 5'00- 5'00- 5'00- 8'00- 6'30-
12'00 11'00 10'00 12'00 10'00 10'00 8'00 6'00 10'00 8'00 8'00 10'00 10'00 12'00 13'00 10'00 10'00 12'00
Notes [k] [l] [m] [n] [o] [p] [q] [r] Last updated: July 2023.
Outer sections
(max interval)
Morning peak 2'30 4'00 10'00 7'30 4'00 4'00 3'30 5'30 9'00 10'00 5'00 5'00 6'40 7'20 7'00 6'00 3'20
Mid-day 6'00 8'00 14'00 9'00 9'00 11'00 8'00 5'30 12'00 12'00 6'00 6'00 12'00 12'00 10'00 7'00 6'30
Evening peak 3'00 6'00 10'00 9'00 3'45 6'55 5'30 5'00 9'00 7'00 7'30 5'00 8'00 9'00 8'00 7'00 3'50
Weekend daytime 4'00 7'20 13'00 8'00 10'00 10'00 7'20 5'00 10'00 10'00 6'00 5'00 10'00 12'00 7'00 6'30 6'00
Other hours 4'00- 5'00- 13'00- 7'30- 10'00- 10'00- 10'00- 6'00- 6'00- 11'00- 6'00- 6'00- 5'00- 5'00- 8'00- 6'30- 9'00
12'00 11'00 17'00 10'00 12'00 11'00 12'00 10'00 14'00 18'00 10'00 10'00 12'00 13'00 10'00 12'00

Extended hours on Friday and Saturday

edit

On lines in the city center on Fridays and Saturdays, operating hours are extended by an additional hour. From April 1, 2017, the operating hours of lines 1, 2, and 7-10 were extended by an hour after the regular last train on each Friday, Saturday and the last working days beforeChinese Public Holidays.[98]Since July 1, 2017, this was extended such that lines 1-4 and 5-13. By the end of 2018, all the stations in the city center extended their operating hours after midnight on Fridays and Saturdays. Since September 30, 2020, extended operation was resumed on lines 1, 2, 9 and 10.[99]Since April 30, 2021, also extended weekend operation of lines 7 and 13 was resumed.[100]

Extra trains from Hongqiao railway station

edit

From Sunday to Thursday, there are two trains on both line 2 and 10 taking passengers from Hongqiao railway station and airport after normal operation time and only stop at selected stations.

Owners and operators

edit

Fares and ticket system

edit
China Art Museumstation
Platform ofline 3atShanghai South railway station

Like many other metro systems in the world, Shanghai Metro uses a distance-based fare system. The system uses a "one-ticket network", which means that interchanging is possible between all interchange stations, given that the transfer staying within the Shanghai Metro system, without the purchase of another ticket where available, excluding some stations where transferring to another line at said station requires leaving the Fare Zone which mandates a Single-Journey Ticket be used before entering that of another line, requiring the purchase of another Single-Journey Ticket (Shanghai Public Transport Cards are exempt as they are not consumed upon exit). TheShanghai Public Transport Card,which allows access to most public transport in Shanghai under one card, is another form of payment.

All stations are equipped with Shanghai public transport card self-service recharge machines, some of which support card sales and card refund operations. Passengers can also choose to purchase public transport cards to travel. Since 2005 automatic ticket vending machine, which accepted banknotes, appeared in Shanghai Metro stations.[101]Automatic ticket vending machines are divided into "coins only" and "coins and banknotes are collected", the coin only machine collects 1 yuan and 0.5 yuan, and the coins and banknotes all accept 5, 10, 20, and 50 yuan banknotes and 1 and, 0.5 yuan coins. Vending machines will provide change.

Children under 1.3 meters

edit

One or two children not taller than 1.3 meters (inclusive) are exempted from paying a fare in accompany of another passenger. In cases of more than two, the passenger should buy tickets. A preschool child, unattended by an adult, is not allowed to take the train alone.[102]

Periodic pass

edit

A pass for unlimited travel within the metro system for either 24 or 72 hours is offered. This pass is not available through vending machines, but has to be purchased at Service Centers at metro stations.[103]

  • Aone-day passpriced at 18yuan.This pass was introduced on April 24, 2010, for theExpo 2010held in Shanghai.
  • Athree-day passpriced at 45yuan.This pass was available since March 8, 2012.
  • AMaglev single trip ticket and metro ticketpriced at 55yuan.This pass allows for a ride on theShanghai Maglev Trainand unlimited travel within the metro system for 24 hours. AMaglev round trip and metro ticketis priced at 85yuan.

Distance-based fare

edit
  • The base fare is 3yuan(RMB) for journeys under 6 km, then 1 yuan for each additional 10 km. As of December 2017, the highest fare is 15 yuan (travel betweenOriental LandtoDishui Lake,the farthest distance at present).[104]This fare scheme has not changed since September 15, 2005.[105]
¥3
0 ~ 6 km
¥4
6 ~ 16 km
¥5
16 ~ 26 km
¥6
26 ~ 36 km
¥7
36 ~ 46 km
¥8
46 ~ 56 km
¥9
56 ~ 66 km
¥10
66 ~ 76 km
¥11
76 ~ 86 km
¥12
86 ~ 96 km
¥13
96 ~ 106 km
¥14
106 ~ 116 km
  • Shortest route calculated as multiple route available between any entry-exit stations.
  • Travel time limit is 4 hour. Additional lowest single journey fare (3 yuan) is required if time limit is exceeded.
  • For journeys exclusively fromXinzhuang StationtoPeople's Square Station,the fare is 4 yuan, though the distance between People's Square Station and Xinzhuang Station is about 17.8 km (11.1 mi).

Only passengers with unused tickets at the station on the day can refund tickets at the service center. Refunds can also be processed in the event of a train failure for more than 15 minutes, and the apology letter can be downloaded on the official website, WeChat public account and Metropolis app.

Single-Journey Ticket

edit
Shanghai metro ticketing machine map

Single-Journey tickets can be purchased from ticket vending machines, and at some stations, at a ticket window. Single-ride tickets are embedded with RFID contactless chips. When entering the system riders tap the ticket against a scanner above the turnstile, and when they exit they insert the ticket into a slot where it is stored and recycled. This ticket does not facilitate transfers at avirtual interchange station.Passengers would have to purchase a new ticket when reentering the fare gate.[106]

Public transportation card

edit

In addition to a single-ride ticket, the fare can be paid using aShanghai public transport card.Transportation card of other cities that utilizesChina T-Unioncan also be used in Shanghai Metro. This RFID-embedded card can be purchased at selected banks, convenience stores and metro stations with a 20-yuan deposit. This card can be loaded at ticket booths, Service Centers at the metro stations as well as many small convenience stores and banks throughout the city. The Shanghai Public Transportation Card can also be used to pay for other forms of transportation, such as taxi or bus. Refunds can be obtained at selected stations.[s][107]

Discounts for SPTC holders:

  • Cumulative discount:Users of theShanghai public transport cardor QR codes get a 10% discount for the rest of the calendar month after paying 70 yuan in taking metro, The discount is applied only for journeys after the payment; it is not retroactively applied to previous journeys.[108]
  • Virtual-transportation discount:Transfers at virtual interchange stations the fare will be calculated continuously. This discount is also applicable forT-Uniontransportation cards of other cities and Shanghai Public Transportation QR code.[108]
  • Combined ride discount:Users of theShanghai public transport cardand QR codes get a 1 yuan discount when transferring to the metro within 120 minutes. (The 10% monthly discount may be applied after the transfer discount.) This discount also applies for a bus to Metro and bus to bus transfers and can accumulate over multiple transfers. Depending on the time spent at the destination the discount will be applied at the start of the return trip as well, making the cost of a round-trip 11 yuan instead of the 16 yuan that would normally be charged without the card.[108]

Mobile payment methods

edit

Passengers can also pay their Shanghai Metro fares using a mobile phone app, Daduhui (Metro Metropolis) since January 2018. The app requires one to scan a QR code when entering the fare gate at the origin station and again when exiting at the destination station. The fare is then deducted.[109]The system supportsAlipay,WeChat PayandUnion Pay,three of the most commonly used mobile payment methods in China.[17]

The Shanghai Public Transportation QR Code, which is accessible through Alipay, WeChat and other applications, has been accepted on the Shanghai Metro since 2022. The usage of the Shanghai Public Transportation QR Code does not requirebluetooth.Furthermore, users of the aforementioned QR Code are entitled to the same fare discounts as users of aShanghai Public Transportation Card.

Fare evasion

edit

The official reported daily fare evasion rate accounts for about 0.16% of the total passenger flow.[110]In the Shanghai Metro fare evasion will result in a fine of 6 times the fare.[111]

Shanghai Metro have been cooperating with police to crack down on subway fare evasion. In 2012, the Shanghai Metro has reported 202,457 counts fare evasion, and an additional 472,898 yuan of adjusted fare was collected.[112]Since June 3, 2013, the subway operator announced that all evaders will be recorded in the personal credit information system, which may lead to obstacles in loan applications and job hunting in the future.[113]However, in actual implementation, the subway law enforcement officers only took the above measures for those who refused to make up the fare; and in some stations where fare evasion often occurred, the ticket gates were changed from the original three-bar type to gate type gates.[114][115]

Controversies and incidents

edit

Class C cars

edit

In 1999,Shanghai ElectricandAlstom Metropolissigned an agreement to invest 28 million US dollars to establish Shanghai Alstom Transportation Equipment Co., Ltd., and introduce a rail transit train production line inMinhang,which would be able to assemble 300 trains annually. Shanghai Alstom only had the national license to produce C-class cars from its establishment and no license to produce A-class cars. At that time, the municipal government stipulated that Shanghai would purchase 300 C cars produced by the new company on lines5,6,and8of the future rail transit construction. The two parties reached an agreement on the purchase of 300 cars at that time. For this reason, the Transportation Research Institute had to "reduce" the predicted passenger flow to accommodate the C-class railcars, allowing for a reduction of the station's civil construction scope for the smaller trains. In the construction of lines5,6,and8,the railcars were not supplied by the completion of the tender, but by a signed agreement for the railcars after "internal consultation and coordination" between Shentong Group and Shanghai Alstom, a violation of Articles 3 and 4 of the Law of the People's Republic of China on Tendering and Bidding.

The person in charge of the passenger flow forecasting project ofline 8confirmed that the passenger flow forecast report of line 8 was not completed until 2005 after continuous revision. However, in 2003 an agreement was signed for line 8 to supply 168 C-class vehicles, i.e., Shentong Group signed an agreement with Shanghai Alstom two years before the release of the forecast report, and decided to use the C-class car. At that time, it was predicted that the forecast passenger flow of line 8 would be about 500,000 passengers per day during the three years from 2007 to 2010. The operator used as initial forecast passenger flow of only 200,000 passengers per day. line 8 was extremely congested upon opening, even leading to physical conflicts between passengers. In 2010, to deal with the overcrowding Shanghai Metro hiredpassenger pushersto assist commuters boarding line 8 trains.[116]Today, line 8 carries up to over 1 million passengers a day.

The estimated passenger flow ofline 6was more than 105,000. However, the highest passenger flow in the first few days of opening reached 150,000.[117]With a headway of 13.5 minutes at opening and only four carriages, during peak hours people had to wait 45 minutes to get a ride. The relevant departments did not conduct a comprehensive survey of the residents around the proposed line to estimate passenger flow but instead household registration data was used which excludes migrant populations.[118]

Other controversies

edit

In June 2012, Shanghai Metro published a post on Weibo asking women to wear more clothing in public. The post argued that it was not surprising for women to be harassed in the subway if they are wearing revealing clothing and called on women to cherish themselves. This post attracted backlash from women's rights advocates and feminists who called the post misogynistic.[119]

Train collisions and incidents

edit
  • March 24, 2004: An evening crash at the turnaround line north ofTonghe Xincun stationoccurred during testing of the north extension of theline 1(which opened on December 28, 2004), set 122 had a sideswipe with set 102, resulting in car 92113 damaged beyond repair. In 2007, the damaged car was replaced with a new car. Details of the crash have not been released since ever the accident.[120]
  • December 22, 2009, at 5:58 a.m., an electrical fault in the tunnel betweenSouth Shaanxi Road stationandPeople's Square stationcaused a few trains to stall. The tripping failure of the power supply catenary was caused by the top of the tunnel falling down and causing a short circuit. The segment betweenHengshan RoadandHanzhong Roadwas suspended.[121]At 6:54 a.m., while the track was under repair, a low-speed collision occurred between two trains online 1atShanghai railway station.As train set 0150 went to the Shanghai railway station's turnaround the signalling system sent a speed code of 65 km/h instead of 20 km/h, resulting in insufficient braking distance as the distance between set 0150 and set 117 was only 118 meters when the signal system sent a code of a speed of 0 km/h. As train set 0150 increased speed from 60.5 km/h to 62 km/h, the train driver commenced emergency braking, preventing a more serious collision. The train collided at a speed of 17 km/h with the side of the rear of set 117 entering the turnaround track from the down platform in the reverse direction. Nobody was injured, but the car 013151 and cars 98033 and 98042 which were badly damaged. There were no passengers aboard set 117. Service resumed at 11:48 a.m.[122]Some passengers on set 0150 were in the train until 11 a.m. The crashes affected millions of morning commuters and occurred duringDongzhi Festival,when people visit cemeteries to pay tribute to their departed ancestors.[123]
    At 8.40 p.m. another crash occurred and theHengshan Road-Shanghai Railway Stationsection was suspended again.[124]A fire broke out at the substation inSouth Shaanxi Road,due to a transformer failure caused by fluctuations in the power supply of the external network.
  • July 27, 2011, in the evening, after a train ofline 10was sent fromLongxi Roadstation, it was supposed to be sent toHangzhong Roadstation (branch line), but it was sent toHongqiao Railway Stationby mistake, and then stopped at theShanghai Zoostation for passengers going toHangzhong Roadstation to disembark. The Shanghai Metro claimed that the incident was caused by "signal debugging failure".[125]
  • September 27, 2011, at 2:51 p.m., two trains online 10collided betweenYuyuan Garden stationandLaoximen station,injuring 284–300 people. Initial investigations found that train operators violated regulations while operating the trains manually after a loss of power on the line caused its signal system to fail. No deaths were reported.[126]
  • March 12, 2013, at 16:12, the second car of aline 5train derailed nearMinhang Development Zonestation. There were no casualties. This caused theline 5to run 48 minutes behind schedule. During the delay, the line was cut back toJinping Roadand service to theMinhang Development Zonewas served by the Jiangchuan Route 1 shuttle bus. The subway said the accident was caused by "signal equipment failure."[127]
  • 22 December 2024, at 8:00, a Line 11 train (set 1173) traveling at 100km/h between Malu and Wuwei Road collided with a construction crane working on a road connecting the Shanghai-Jiading Expressway and Jiamin Expressway. Most of the glass in the front carriage shattered, and the driver cabin partially collapsed. No people were injured, but the track and train was damaged. The track between Malu and Wuwei Road was closed until 21:30, after all repairs were made. A replacement bus was offered to commuters until then.[128]

Platform screen door incidents

edit
  • End of July 2006 at theShanghai Stadium stationonline 4at about 7:50 p.m. a middle-aged woman accidentally caught her foot between the train and the platform as a group of passengers swarmed aboard the train. She pulled out her foot, but her shoe fell under the platform, and she suffered skin trauma.[80]
  • July 15, 2007, at 3:34 p.m. 47-year-old Sun Mou entered a southboundline 1train atShanghai Indoor Stadium stationand got caught between the screen door and the moving train. The train buzzer and screen door lights were activated while the passenger tried to get into the car, but he was unable to squeeze into the compartment due to the crowding. Sun's mother sued Shanghai Metro for 1.18 million yuan. The man was found to be carrying 0.29 grams of heroin, and the drug was detected in his blood. As platform screen door had repeatedly caught people, officials said safety switches will be installed on the inside of the screen doors. If someone touches the safety switch, the train will be suspended. A laser detection device was under development to reduce the chance of similar incidents.[129]
  • July 24, 2007, at 2:41 p.m. A passenger entered a northboundline 1train atXujiahui stationwhen the buzzer sounded. His laptop bag was caught between the train door and the screen door and hit the tunnel wall, falling to the roadbed as the train began to move. The laptop was valued at 11,350 yuan and Shanghai Metro was only willing to compensate 2,500 yuan. The passenger took the matter to court, and both parties were ultimately found at fault.[129]
  • On July 5, 2010, at theZhongshan Park stationa woman died after she was dragged between the train and theplatform screen doorswhen the train started moving, causing her body to collide with a safety barrier.[130]
  • On June 6, 2018, atPeople's Square stationonline 8at about 4 p.m. a woman suffered a head injury after she became stuck between the platform screen doors. She later unsuccessfully sued the metro operator for hospital expenses, and claimed she did not hear the door closing chime.[131]
  • On January 22, 2022, at 16:30 online 15Qi'an Road stationan elderly woman was injured and later died after becoming trapped between the platform screen door and train.[132]

Subway culture

edit
edit

The Shanghai Metro logo is a circular pattern composed of the first letters "S" and "M" of the English "Shanghai Metro", which means that the subway runs around the city and extends in all directions. The design reflects the rapid and convenient subway transportation and the speed of subway development. The logo is red, the font is black, and the background color is white:[133]

  • Red symbolizes the young, vigorous and prosperous Shanghai subway business;
  • Black symbolizes the firm belief and pursuit of the subway enterprise to shoulder historical responsibilities and perseverance;
  • White symbolizes the brilliant vision of the subway employees' wisdom, talent and fighting spirit.

Mascot

edit

On February 4, 2010, in the run-up to the 2010 World Expo in Shanghai, the subway mascot named Changchang (Chinese:Sướng sướng) was unveiled.[134]The mascot is a boy with red, white and blue as the main colors. Changchang means "happiness, smoothness, and imagination", which not only reflects the happiness that Shanghai subway brings to the city and life, but also reflects the dense network and unimpeded development of the subway throughout the city. It symbolizes its infinite possibilities to meet the diversified future.[135][136]

  • Its helmet symbolizes technology and speed, and the subway logo on the helmet reflects the identity of the subway mascot;
  • The mask is based on the subway cab as the prototype, which represents the concept of operation, and also has the meaning of "leading";
  • The smiling eyes reflect the kindness and enthusiasm of Shanghai Metro, and it implies smiling service and warm transportation;
  • The "smooth" raised arms and the outstretched hands symbolize that the subway, as an important means of transportation in Shanghai, welcomes passengers at home and abroad with cordial service;
  • The feet represent the safety and comfort of the Shanghai subway;
  • The wheels on the feet symbolize technology and speed.

Other

edit
  • Unveiled on August 13, 2021, Xujiahui Station has a statue of Liu Jianhang, chief engineer of Shanghai Metro when Line 1 was constructed in 1990.[101]

Museum

edit

Network map and statistics

edit

The following data displays the system length of Shanghai Metro and the number of stations.

Notes

edit
  1. ^abThis figure excludes theMaglev lineandJinshan railway,both often included in Shanghai Metro maps but not considered part of the system.
    Official reported number of lines byShentong Metro GroupincludesMaglev line,resulting in 21 lines.
  2. ^abcThis figure counts an interchange station separately if intersecting lines have distinct, dedicated track and platform infrastructure. Thus, the 9 stations along theHongqiao Road-Baoshan Roadsegment, which are shared by lines3and4on the same tracks and platforms, are not double-counted, whereas all other interchange stations are counted once for each intersecting line, includingYishan Road,which, despite also being served by lines3and4,have separate track and station infrastructure. Stations on non-Shanghai Metro systems (includingMaglev lineandJinshan railway) are not included.
    The officially-cited number of stations byShentong Metro GroupincludesMaglev line(2 stations), resulting in 508 stations.
    If all interchange stations are counted only once regardless of infrastructure separation, thenMTA New York City Subwayis the system with the largest number of unique stations, totaling 424.
  3. ^abcThis figure excludes theMaglev line,both often included in Shanghai Metro maps but not considered part of the system. The figure counts the shared track (11.566 km) of lines3and4once, as Line 3 only.
    Official reported network length by Shentong Metro Group includes the 29kmMaglev line,resulting in 831 km (516.4 mi).
  4. ^JinshanandChongmingdistricts do not have Shanghai Metro service, though anew lineto Chongming is under construction as of March 2021. Meanwhile, Jinshan has been served by theChina Railways-operated, non-fare-integratedJinshan Linesince September 2012.
  5. ^A "*" indicates single line record high.
  6. ^Tomb-Sweeping Day.
  7. ^abcWomen's Day leisure shopping. More travel as most organizations give female employees half-day off and shopping malls have discounts on this day.
  8. ^abLines3and4share the same track betweenHongqiao RoadandBaoshan Road(9 stations). These are not counted twice in the total number of stations.
  9. ^Lines3and4share the same track betweenHongqiao RoadandBaoshan Road.In case these track are not counted the length ofline 4is 22.03km.[33]
  10. ^Note:line 5was constructed beforeline 4and had to retrofit platform screen doors after having opened.
  11. ^Morning peak southwards: between 2'30 and 5'00; northwards: between 5'00 and 7'30.
  12. ^Morning peak interval between 3'10 and 7'30.
  13. ^Morning peak northwards toward Baoshan: 2'30; Evening peak southeast towards Pudong: 4'40.
  14. ^Morning peak southwards towards Oriental Sports Center 2'15.
  15. ^Morning peak east towards Song gian g 2'30; Evening peak west towards Pudong: 3'00.
  16. ^Morning peak northwards towards Baoshan/Pudong: 3'00.
  17. ^Morning peak northwest towards Jiading: 2'30; Evening peak southeast towards Pudong: 3'30.
  18. ^Morning peak eastwards towards Lantian Road between 3'00 and 3'20.
  19. ^Refunds of theShanghai Public Transportation Cardare available between 9:00-19:00 at line 1:Jin gian g Park,Hengshan Road,Hanzhong RoadandGongkang Road;line 2:Songhong Road,Jiangsu Road,Century ParkandHaitiansan Road;line 3:Caoxi Road,Zhongtan Road,Dongbao xing RoadandNorth Jiangyang Road;line 4:Yangshupu Road.

References

edit
  1. ^ab"2023 năm thành thị quỹ đạo giao thông hoạt động số liệu tốc báo _ cả năm _ số lượng hành khách _ chặng đường".news.sohu.RetrievedSeptember 2,2024.
  2. ^ab"1339 vạn đợt người! Khi cách 5 năm Thượng Hải tàu điện ngầm lưu lượng khách sáng tạo cao, nguyên nhân ở đâu _ phổ giang đầu đề _ mênh mông tin tức -The Paper".thepaper.cn.RetrievedSeptember 2,2024.
  3. ^abShanghai adds 7,000th train to Metro fleet.Shine. December 25, 2020.
  4. ^abc"14 hào tuyến, 18 hào tuyến một kỳ bắc đoạn ngày 30 tháng 12 tránh ra thông lúc đầu hoạt động thân thành quỹ đạo giao thông võng 831 km, 5 điều toàn dây chuyền sản xuất tự động quy mô thế giới đệ nhất"[Shanghai Metro Line 14 & Line 18 Phrase I north part to enter service on 30 December with the network extends to 831 kilometers and five GoA4 lines as the world's largest metro system].shmetro(in Chinese). December 28, 2021.RetrievedDecember 28,2021.
  5. ^Shanghai Metro (December 26, 2020)."Phase 2 of Line 10 and Phase 1 (South Section) of Line 18 opens on December 26"10 hào tuyến nhị kỳ, 18 hào tuyến một kỳ nam đoạn ngày 26 tháng 12 tránh ra thông thí hoạt động.Shanghai Shentong Metro Group Co., Ltd.(in Chinese (China)).
  6. ^https://english. gov.cn/news/202412/28/content_WS676f5620c6d0868f4e8ee55b.html
  7. ^WeChat@ tàu điện ngầm lưu lượng khách cập vận chuyển nghiên cứu A Ngưu (February 15, 2020).Đều đã tới! 2019 năm Trung Quốc thành thị tàu điện ngầm số lượng hành khách tổng kết.Trung Quốc thành thị quỹ đạo giao thông hiệp hội.
  8. ^Thượng Hải tàu điện ngầm thời gian làm việc lưu lượng khách siêu ngàn vạn trở thành tân thái độ bình thường(in Chinese).Ifeng.March 9, 2016.Archivedfrom the original on March 10, 2016.RetrievedMarch 12,2016.
  9. ^abYuting, Zhu; Meiping, Yang (May 28, 2023)."Shanghai Metro on the right track after 30 years".Shine.
  10. ^Chatwin, Jonathan (2024).The Southern Tour: Deng Xiaoping and the Fight for China's Future.Bloomsbury Academic.ISBN9781350435711.
  11. ^ab"Tàu điện ngầm bước chân ba loại Thượng Hải - tân dân tuần san".m.xinminweekly.cn(in Chinese). March 9, 2022.Archivedfrom the original on May 15, 2023.RetrievedMay 15,2023.
  12. ^"Thượng Hải thành thị quy hoạch chí — nhanh chóng có quỹ giao thông".Archivedfrom the original on June 27, 2016.RetrievedApril 15,2019.
  13. ^Railway technology.Shanghai Metro.2007.
  14. ^Lu JinDong and Chen Yi Xin.Feature: Urban Railways in China and India. The Shanghai No. 1 Subway Line.Japan Railway & Transport Review No. 10 (pp.31–37).
  15. ^"Line 1 | ExploreShanghai".exploreshanghai.RetrievedNovember 13,2021.
  16. ^Master City Plan of Shanghai in 2001.encyclopedia.
  17. ^abShanghai Metro: from nothing to world leader.Shine. September 8, 2018.
  18. ^Shanghai Master Plan 2017-2035. Striving for the Excellent Global City.Shanghai Urban Planning and Land Resource Administration Bureau. January 2018.
  19. ^Chongming is in line for planned Metro extension.Shine. December 20, 2018.
  20. ^Tam chương giao thông công cộng thứ 5 tiết tàu điện ngầm [Chapter 3 Public Transportation Section 5 Subway]( 26 cuốn thành thị xây dựng [Volume 26 Urban Construction] ed.). Trang đầu địa phương chí cơ sở dữ liệu thị cấp chí thư Thượng Hải thông chí đệ [Local Chronicles Database Municipal Chronicles]. July 14, 2008.{{cite book}}:CS1 maint: location missing publisher (link)
  21. ^[Impact of the COVID-19 pandemic on public transport]
  22. ^Tàu điện ngầm lưu lượng khách lại sáng tạo cao tàu điện ngầm bộ phận trạm điểm ngày 30 tháng 9 khởi đem phong trạm.Sina Shanghai. September 27, 2015.
  23. ^Thượng Hải thân thông tàu điện ngầm tập đoàn công ty hữu hạn 2015 niên độ xã hội trách nhiệm báo cáo.Shanghai metro Social Responsibility (2015).
  24. ^4 tuyến đổi mới đơn tuyến lưu lượng khách tân cao thị dân đi ra ngoài thân lãi quỹ giao.Shanghai Metro. March 4, 2015.
  25. ^Metro breaks recordsShine. March 20, 2017.
  26. ^1223.1 vạn đợt người ngày 9 tháng 3 Thượng Hải tàu điện ngầm lại sang lưu lượng khách tân cao.Shanghai Metro Transportation Management Center. March 11, 2018.
  27. ^1230.6 vạn đợt người! Thượng Hải tàu điện ngầm liên tục hai chu sang lưu lượng khách tân cao 5 điều đường bộ siêu trăm vạn.Shaghai Observer. March 17, 2018.
  28. ^【 1329.4 vạn đợt người 】 ngày 8 tháng 3 Thượng Hải tàu điện ngầm lưu lượng khách sang lịch sử tân cao.Shanghai Metro. March 9, 2019.
  29. ^Shanghai Metro. March 9, 2024.
  30. ^ab"1 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 1 Timetable].service.shmetro(in Chinese). April 27, 2001.RetrievedAugust 14,2021.
  31. ^ab"2 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 2 Timetable].service.shmetro(in Chinese). April 24, 2002.RetrievedAugust 14,2021.
  32. ^ab"3 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 3 Timetable].service.shmetro(in Chinese). May 16, 2003.RetrievedAugust 14,2021.
  33. ^Jin, Zihua; Jin, Jiamo (December 20, 2004)."Thượng Hải tàu điện ngầm 4 hào tuyến C hình chữ đường bộ phô xong đường ray sang năm đế thí hoạt động ( tổ đồ )".China News Network. Sina.
  34. ^ab"4 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 4 Timetable].service.shmetro(in Chinese). May 16, 2004.RetrievedAugust 14,2021.
  35. ^"5 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 5 Timetable].service.shmetro(in Chinese). May 16, 2005.RetrievedAugust 14,2021.
  36. ^ab"6 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 6 Timetable].service.shmetro(in Chinese). November 30, 2006.RetrievedAugust 14,2021.
  37. ^ab"7 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 7 Timetable].service.shmetro(in Chinese). May 30, 2007.RetrievedAugust 14,2021.
  38. ^ab"8 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 8 Timetable].service.shmetro(in Chinese). April 24, 2008.RetrievedAugust 14,2021.
  39. ^ab"9 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 9 Timetable].service.shmetro(in Chinese). December 30, 2009.RetrievedAugust 14,2021.
  40. ^ab"10 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 10 Timetable].service.shmetro(in Chinese). September 24, 2010.RetrievedAugust 14,2021.
  41. ^abc"11 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 11 Timetable].service.shmetro(in Chinese). June 29, 2011.RetrievedAugust 14,2021.
  42. ^ab"12 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 12 Timetable].service.shmetro(in Chinese). January 8, 2012.RetrievedAugust 14,2021.
  43. ^ab"13 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 13 Timetable].service.shmetro(in Chinese). August 30, 2013.RetrievedAugust 14,2021.
  44. ^ab"15 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 15 Timetable].service.shmetro(in Chinese). January 12, 2016.RetrievedAugust 14,2021.
  45. ^"16 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 16 Timetable].service.shmetro(in Chinese). May 16, 2016.RetrievedAugust 14,2021.
  46. ^ab"17 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 17 Timetable].service.shmetro(in Chinese). January 2, 2017.RetrievedAugust 14,2021.
  47. ^"18 hào tuyến đầu chuyến xe cuối thời khắc biểu"[Line 18 Timetable].service.shmetro(in Chinese). January 1, 2018.RetrievedAugust 14,2021.
  48. ^"Phổ giang tuyến đầu chuyến xe cuối thời khắc biểu"[Pu gian g Line Timetable].service.shmetro(in Chinese). March 3, 2018.RetrievedAugust 14,2021.
  49. ^"Shanghai".urbanrail.net.RetrievedAugust 14,2021.
  50. ^Thượng Hải tương lai 10 năm 9 điều quỹ giao tân tuyến công kỳ toàn tuyến trạm điểm giải mật —— phượng hoàng bất động sản Thượng Hải.sh.house.ifeng(in Chinese).Archivedfrom the original on September 14, 2017.RetrievedSeptember 13,2017.
  51. ^Mỗi ngày báo tường.kuaibao.qq(in Chinese).RetrievedAugust 26,2016.[permanent dead link]
  52. ^Vô tích Tô Châu cũng đem quỹ giao thông hỗ? Trước mắt có quy hoạch nhưng thượng vô bảng giờ giấc.Eastday(in Chinese). October 18, 2013.Archivedfrom the original on October 29, 2013.RetrievedOctober 28,2013.
  53. ^Thượng Hải đến Tô Châu đệ nhị điều vượt tỉnh tàu điện ngầm hoàn thành tuyển chỉ, lưỡng địa thẳng tới chỉ cần 1 giờ _ Trung Nguyên võng.zynews(in Chinese (China)).Archivedfrom the original on October 21, 2018.RetrievedOctober 21,2018.
  54. ^"Thượng Hải tàu điện ngầm 2 hào tuyến tây kéo dài công trình tiến triển: Nhà ga chủ thể vây hộ kết cấu chính thức thi công _ ngầm _ bàn tường _ từ kính đông trạm".sohu.RetrievedDecember 1,2022.
  55. ^"Mới nhất tin tức! 2021 năm Thượng Hải tàu điện ngầm đem khởi động 7 điều tàu điện ngầm đường bộ xây dựng"[Latest news! Shanghai Metro to build 7 new metro lines].NetEase(in Chinese). January 26, 2021.RetrievedAugust 15,2021.
  56. ^"Thượng Hải tàu điện ngầm 12 hào tuyến tây kéo dài công trình hôm nay khởi công, tổng đầu tư du 160 trăm triệu nguyên".thepaper.cn.December 16, 2022.RetrievedDecember 17,2022.
  57. ^"Sang nhiều hạng đầu cái! Hỗ tàu điện ngầm 13 hào tuyến tây kéo dài đầu trạm chủ thể đỉnh cao".sh.people.cn.RetrievedDecember 1,2022.
  58. ^"Thượng Hải thị quỹ đạo giao thông 15 hào tuyến nam kéo dài hạng mục chính thức khởi công _ hình ảnh tin tức".fengxian.gov.cn.RetrievedAugust 20,2024.
  59. ^"Full Steam Ahead: Latest on Metro Line 18 (Phase II) and 21_ tiếng Anh bản".english.shyp.gov.cn.RetrievedJanuary 7,2025.
  60. ^"Đào cơ ù ù khởi động, Thượng Hải tàu điện ngầm 13 hào tuyến tây kéo dài cùng 18 hào tuyến nhị kỳ lại khai kiến _ kỷ địch _ xây dựng tập đoàn _ công trường".sohu.RetrievedDecember 1,2022.
  61. ^"Shanghai Municipal Government (via Public) / City mulls plan for nine more Metro projects".May 5, 2016. Archived fromthe originalon May 5, 2016.RetrievedJanuary 7,2025.
  62. ^ab"Shanghai begins construction of Metro Line 19".english.shanghai.gov.cn.RetrievedAugust 5,2024.
  63. ^"Thượng Hải thị xây dựng hạng mục hoàn bình tin tức công khai ngôi cao 1".e2.sthj.sh.gov.cn.RetrievedJanuary 7,2025.
  64. ^"3 new Metro lines to ease pressure".archive.shine.cn.August 13, 2016.RetrievedJanuary 7,2025.
  65. ^"Thượng Hải quỹ đạo giao thông 20 hào tuyến một kỳ tây đoạn công trình khởi công, đi qua Phổ Đà tĩnh an".sh.people.cn.RetrievedDecember 16,2022.
  66. ^"Wayback Machine"(PDF).December 20, 2023. Archived fromthe original(PDF)on December 20, 2023.RetrievedJanuary 7,2025.
  67. ^ab"Đề phòng trúng gió hạ nhiệt độ không ngừng công, Thượng Hải 7 cái quỹ giao xây dựng hạng mục lấy được tân tiến triển".
  68. ^"Wayback Machine"(PDF).December 20, 2023. Archived fromthe original(PDF)on December 20, 2023.RetrievedJanuary 7,2025.
  69. ^"Tin tức - đường hầm võng".tunnelling.cn.RetrievedAugust 20,2024.
  70. ^"Thượng Hải quỹ giao sùng minh tuyến tân tiến triển" thân sùng hào "Thuẫn cấu cơ đao bàn hạ giếng".sh.people.cn.RetrievedDecember 14,2022.
  71. ^"Thượng Hải thị thành thị quỹ đạo giao thông đệ tam kỳ xây dựng quy hoạch"[Shanghai Rapid Transit Third Phase Construction Plan](PDF).ndrc.gov.cn(in Chinese).Archived(PDF)from the original on December 26, 2018.RetrievedDecember 26,2018.
  72. ^"Shanghai receives 5000th metro car – International Railway Journal".July 20, 2018.Archivedfrom the original on August 12, 2018.RetrievedAugust 12,2018.
  73. ^Chen, Huizhi (December 28, 2021)."Shanghai to add two Metro lines on December 30".Sihine.
  74. ^abThượng Hải tàu điện ngầm 8 hào tuyến chiếc xe.Trung xe trường xuân quỹ đạo xe khách cổ phần công ty hữu hạn(in Chinese).RetrievedMarch 20,2020.
  75. ^Metro about to warm things up for chilly passengers.Shine. August 6, 2021.
  76. ^Dow Assists in Construction of Shanghai Metro: Case Study: Shanghai Metro. 2018.Dow Performance Silicones.
  77. ^"Shanghai Subway Takes Suicide Prevention Measures".China Daily. October 19, 2004.
  78. ^Wang, Bin (November 28, 2003)."3 vạn lần bình thường chốt mở gia tăng che chắn môn mở rộng khả năng [30,000 normal switches increase the possibility of screen door promotion]".Sina. Oriental Morning Post.
  79. ^"Shanghai Metro".Railway Technology.
  80. ^abHe, Shiyu (August 21, 2006)."Nguy hiểm thăm tần hiện tàu điện ngầm che chắn môn" nhận tri lầm khu "Dẫn phát tai hoạ ngầm [ đồ ] [Dangerous visits frequently appear in the subway screen door" cognition misunderstanding "causing hidden dangers]".Zhe gian g Online News Website. China News.
  81. ^Shanghai metro group to increase solar energy capabilitiesShanghai Daily, February 23, 2021.
  82. ^Shanghai's 5G services coming to Metro stationsShine. May 22, 2020.
  83. ^Free World-class Wi-Fi of Shanghai Metro.Ruijie. September 30, 2016.
  84. ^Shanghai Metro:FAQ Service
  85. ^Wheelchair travel. China Wheelchair Accessible Travel GuideShanghai Public Transportation.
  86. ^Shanghai metro:security check
  87. ^PHOTOS: Shanghai Metro Pickpockets Caught on CCTV.That's Shanghai, June 5, 2017.
  88. ^Shanghai Metro:Shanghai Rail Transit Safety Management Measures.November 25, 2013
  89. ^China bans eating, drinking and ‘uncivilized’ behavior on subway.New York Post. October 29, 2019.
  90. ^Chen, Huizhi (August 18, 2021)."All Shanghai Metro stations to have cardiac arrest defibrillators".Shine.RetrievedAugust 18,2021.
  91. ^"16 hào tuyến khai thông hành khách bạo lều chọn dùng 3 tiết móc nối lần đầu dùng hỗ ngữ báo trạm _ tân lãng thượng".sh.sina.cn(in Chinese).Archivedfrom the original on September 14, 2017.RetrievedSeptember 13,2017.
  92. ^"Shanghai Metro to make announcements in Shanghainese".Archivedfrom the original on November 5, 2017.RetrievedSeptember 13,2017.
  93. ^Thượng Hải tàu điện ngầm phó giám đốc chỉ nếu tàu điện ngầm gia tăng hỗ ngữ báo trạm là thính giác ô nhiễm.Dương thành võng(in Chinese). September 6, 2014.Archivedfrom the original on March 4, 2016.RetrievedJanuary 20,2016.
  94. ^"Shanghai Daily".RetrievedDecember 5,2011.
  95. ^12 hào tuyến, 16 hào tuyến ngày 29 tháng 12 khởi đón khách thí hoạt động.Shanghai Metro.Archivedfrom the original on November 25, 2014.RetrievedJanuary 11,2015.
  96. ^Thượng Hải tàu điện ngầm.shmetro(in Chinese).Archivedfrom the original on August 11, 2017.RetrievedSeptember 13,2017.
  97. ^16 hào tuyến đầu chuyến xe cuối thời khắc biểu(in Chinese). Shanghai Metro. December 27, 2014.Archivedfrom the original on May 21, 2017.
  98. ^2018 cuối năm Thượng Hải trung tâm thành nội tàu điện ngầm hoạt động toàn "Quá 0 điểm".shanghai.xinmin.cn(in Chinese).Archivedfrom the original on February 28, 2017.RetrievedMarch 13,2017.
  99. ^Shanghai Metro Geared up for Your Trips during "May Day" Holiday.Shanghai Metro operation notice.
  100. ^Shanghai Metro's Measures for Passengers’ Travel Needs in Forthcoming Holidays.Shanghai Metro operation notice.
  101. ^abRong gian g, Wang; Xiaowei, Jiang; Jun, Dong; Suoqing, Zhang; Xinyi, Shen (May 28, 2023)."Longer, safer, smarter: 30 years with Shanghai Metro".Shine.RetrievedMay 29,2023.
  102. ^Shanghai metro: Introduction of Ticket: Free metro trip.
  103. ^Signs at the Service points seen on July 4–5, 2010 at the Xujiahui (near Exit 8) and Shanghai West Railway Station.
  104. ^Shanghai metro: Pricing of Metro Tickets.
  105. ^Jigong, Hu."Thượng Hải thị Vật Giá Cục về đồng ý điều chỉnh bổn thị quỹ đạo giao thông vận chuyển hành khách phiếu giới phục hàm (Reply letter of Shanghai Municipal Price Bureau on agreeing to adjust the passenger fare of rail transit in this city)".Shanghai Metro.RetrievedSeptember 6,2005.
  106. ^Shanghai Metro: Introduction of Ticket.
  107. ^Shanghai metro: Introduction of Ticket: Public Transport Card
  108. ^abcShanghai Metro: Metro Concession Terms.
  109. ^"Shanghai Metro to Accept Mobile-App Payments".January 17, 2018.RetrievedJune 26,2021.
  110. ^Oriental Morning Post: Strictly crackdown on all types of fare evasion by the subway.Shanghai Shentong Group Co., Ltd.. August 21, 2010.
  111. ^Shanghai Rail Transit Management Regulations.Shanghai Municipal People's Government. May 21, 2002.
  112. ^Li Jiamin.Shanghai continues to crack down on subway fare evasion, as of July, nearly 47,000 people were investigated and dealt with-fare evasion inspection of Shanghai subway Fang Xiang, Shen Tong Wang Mingze, violation investigation and replacement of tickets-Shanghai Channel-Dongfang.October 19, 2013.
  113. ^Shanghai Metro rectification and evasion of fares will affect loans.October 19, 2013.
  114. ^Shanghai Metro is trying out new turnstiles to prevent passengers from evading fares.Observer Network. November 5, 2014.
  115. ^People's Square Station "upgrade" resumes operations today.Phoenix. February 11, 2017.
  116. ^Daozu, Bao (April 2, 2010)."Shanghai metro hires people to shove commuters into trains".China Daily.
  117. ^The passenger flow forecast report is pre-designated for small cars.Xinmin February 15, 2008.
  118. ^"Thượng Hải tàu điện ngầm tân tuyến chọn dùng xe con sương tao nghi ngờ".sina.cn. February 15, 2008.
  119. ^"Women protest against subway's dress code".China Daily. June 25, 2012.
  120. ^"Nhập khẩu A hình tàu điện ngầm chiếc xe ở nam xe đánh thượng Trung Quốc dấu vết [Imported A-type subway vehicles are branded as China on CSR]".China Southern Locomotive and Rolling Stock Industry Group Corporation. August 2, 2007.
  121. ^Thượng Hải tàu điện ngầm phát sinh đoàn tàu mặt bên va chạm sự cố trước mắt vô hành khách bị thương(in Chinese). Chinanews.cn.Archivedfrom the original on February 28, 2010.RetrievedDecember 5,2011.
  122. ^calvinohu (January 23, 2010)."Thượng Hải tàu điện ngầm 9 năm trước thiết kế sơ hở gây thành đoàn tàu chạm vào nhau sự cố [Design omissions in Shanghai Metro 9 years ago led to train collision]".
  123. ^"Subway snag hits thousands".Chinadaily.cn.Archivedfrom the original on October 21, 2012.RetrievedDecember 5,2011.
  124. ^Shanghai Yearbook 2010; 23. Urban and Rural Construction and Management; Transportation Construction and Management.
  125. ^People's Daily Online:Shanghai: A train on Line 10 "turned in the wrong direction" last night. The subway said "signal debugging failure".Dragon TV. July 28, 2011.
  126. ^"Signal maker: Not to blame for Shanghai rail crash".AP.
  127. ^Li XinNet exposure Shanghai Metro Line 5 train derailment actually happen "turnout fault"Xinmin (Phoenix)
  128. ^"Thượng Hải tàu điện ngầm 11 hào tuyến tao cần cẩu xâm nhập bị hao tổn khu đoạn bộ phận khôi phục hoạt động - tân hoa võng".news.cn.RetrievedDecember 29,2024.
  129. ^abLiu, Binbei (February 21, 2008)."Thượng Hải tàu điện ngầm che chắn môn kẹp chết hành khách người nhà tác muốn bồi thường [Family members of passengers trapped in Shanghai subway screen doors seek compensation]".Sina news.
  130. ^"Woman killed in subway accident in Shanghai".China Daily. July 6, 2010.Archivedfrom the original on September 30, 2011.RetrievedJuly 28,2011.
  131. ^Ke, Jiayun (February 27, 2019)."Woman loses appeal after blaming Metro for safety door injury".Shine.
  132. ^Huizhi, Chen (January 25, 2022)."Woman killed on Metro after getting stuck in door".Shine.
  133. ^Xiaocheng, Cheng."【 tàu điện ngầm logo ảnh gia đình 】 này đó thành thị tàu điện ngầm tiêu chí ngươi biết cái gì hàm nghĩa sao?".Sohu.RetrievedDecember 11,2017.
  134. ^Shanghai Metro mascot "Chang Chang" debuts in security screening promotional video.April 2, 2010.
  135. ^What's the implied meaning of “Chang Chang”, the mascot of Shanghai Metro?Shanghai metro FAQ.
  136. ^Thương tổn tàu điện ngầm linh vật bộc lộ quan điểm “Sướng sướng” mang mũ giáp dẫm bánh xe ( đồ ).Oriental Morning Post. February 5, 2010.
edit