St. Clairis asubway stationonLine 1 Yonge–UniversityinToronto,Ontario, Canada. The station opened in 1954 as part of the original Yonge Street subway.

St. Clair
General information
Location15St. Clair Avenue East
Toronto,Ontario
Canada
Coordinates43°41′16″N79°23′35″W/ 43.68778°N 79.39306°W/43.68778; -79.39306
PlatformsSide platforms
Tracks2
Connections
  • 74Mt Pleasant
  • 88South Leaside
  • 97Yonge
  • 312St Clair
  • 320Yonge
  • 512St Clair
Construction
Structure typeUnderground
AccessibleYes
Other information
WebsiteOfficial station page
History
OpenedMarch 30, 1954;70 years ago(1954-03-30)
Passengers
2023–2024[1]27,336
Rank20 of 70
Services
Preceding station Toronto Transit Commission Following station
Summerhill
towardsVaughan
Line 1 Yonge–University Davisville
towardsFinch
Deer Park Crescent
towardsGunns Loop
512 St. Clair Terminus
Yonge Street
Westbound only
towardsGunns Loop
Location
Map

Description

edit

The station is located betweenSt. Clair Avenue Eastand Pleasant Boulevard behind the buildings on the east side ofYonge Street.The station has three vertical levels: Main entrance level (level with St. Clair Avenue), concourse level (level with Pleasant Boulevard) and subway platform level. There are elevators, escalators and stairways connecting the levels.[2]

The station has four entrances, all of which acceptPresto cardsand tickets:[2]

  • Main entrance is at street level on its south side of St. Clair Avenue East. This is a staffed, wheelchair-accessible entrance. There is aMcDonald's restaurantwithin the station building beside the entrance door.
  • The secondary entrance, also wheelchair accessible, is located at the concourse level which is also street level with Pleasant Boulevard. This used to be staffed entrance, until January 5, 2020.[3]
  • A third entrance is from the concourse level of St. Clair Centre at 2 St. Clair Avenue East, at the northeast corner with Yonge Street. Stairs at the entrance lead down to the subway platforms.
  • A fourth entrance, open during peak hours, is accessed from 1 St. Clair Avenue East (Scotiabank), a building at the southeast corner of the intersection with Yonge Street. Stairs lead to the station concourse level.

The St. Clair streetcar loop runs counter-clockwise behind buildings on the south side St. Clair Avenue East. There are two streetcar platforms within the fare-paid zone: an arrival platform roughly perpendicular to St. Clair Avenue, and a departure platform parallel to the avenue. Both platforms are on the main entrance level.[4]

A bus terminal is located on the south side of the station parallel to and accessed from Pleasant Boulevard. It is on the concourse level within the fare-paid zone next to the station's secondary entrance. A multi-storey building stands over the bus roadway and platform.[4]

Entrance on south side of St. Clair Avenue, just east of Yonge Street

History

edit

On March 30, 1954, the station opened along with the original Yonge subway (EglintontoUnion station).

Originally, in 1954, the station's streetcar loop handled streetcars coming from Mount Pleasant Road as well as St. Clair Avenue West. Three routes with four destinations used to pass through the loop all sharing the same track. The streetcar services at the loop were:[5][6]

  • St. Clair route, both westbound toKeele Streetand eastbound to Mount Pleasant Road andEglinton Avenue
  • Earlscourt route, westbound to Lansdowne Avenue
  • Rogers route (rush hour service), westbound to Rogers Road and Bicknell Avenue

In 1974, the Rogers streetcar route was converted to bus, ending direct rush-hour service between Rogers Road and St. Clair station. This abandonment was due to a streetcar shortage.[6]

On March 30, 1975, the St. Clair route east of St. Clair station became the separate Mt. Pleasant streetcar route. This ended the one-seat ride from Mount Pleasant Road to St. Clair Avenue West thus forcing a change of vehicle at St. Clair station.[6]

On July 25, 1976, the Mt. Pleasant streetcar line was converted to diesel bus, ending streetcar service east of St. Clair station. The Metro Roads Department, responding to complaints from motorists about streetcars on Mount Pleasant Road slowing traffic, forced the line's abandonment.[7][8]

On November 29, 1977, trolley buses replaced diesel buses on route 74 Mt. Pleasant and followed the former streetcar route; thus, the Mount Pleasant trolley buses used the streetcar loop and platforms at St. Clair station rather than the bus terminal. The trolley buses operated out of the Eglinton Garage, the site being used today as theEglinton stationbus terminal.[8]

In 1978, the Earlscourt and St. Clair streetcar routes were merged as the 512 route. With the introduction of theCLRV,streetcar destination signs showed a route number instead of a route name. With this change, St. Clair station served only one streetcar route, although some 512 streetcars continued to be signed as terminating at Lansdowne Avenue during the rush hours.[6]

On December 28, 1991, the trolley buses on route 74 Mt. Pleasant were replaced by diesel buses, which again used the station's bus terminal.[8]

Since 2007, the station has been fully accessible with the addition of elevators, escalators and stairway connecting all levels.[9]

Subway infrastructure in the vicinity

edit

North of the station, the tunnel jogs west to cross to the west side of Yonge Street. At theMuir Portalthe line runs in an open cut for 1.3 kilometres, between Yonge Street and the Davisville Yard, the TTC's original subway yard.

South of the station, the train continues to travel in a tunnel. Originally, the area south of the station was open-cut until Summerhill Avenue, immediately before Summerhill station; the line continued in open cut as far as Pleasant Boulevard, just before the next station to the north, St. Clair. Various sections of this open cut were roofed over as the years passed, and since the early 1980s it has been entirely under cover, except when one block was opened out and re-covered, to allow new construction above it. Passengers who look out into the tunnel on this section can still see the sloping sides of the original cut, the stumps of lamp posts and trees, and the undersides of four road bridges.

Nearby landmarks

edit

Nearby landmarks include theDavid A. Balfour Park(Vale of Avoca sectionof Rosedale ravine), St. Michael's Cemetery,Deer Park,Moore Park,Upper Canada College,andForest Hill.

Surface connections

edit

TTC routes serving the station include:

Route Name Additional information
74A Mount Pleasant Northbound to Doncliffe Drive
88A South Leaside Eastbound to Thorncliffe Park Drive via Overlea Boulevard
88B Eastbound to Thorncliffe Park Drive via Wicksteed Avenue
97A Yonge Northbound toSteeles Avenue
97B Northbound to Steeles Avenue via Yonge Boulevard
97C Northbound toEglinton stationand southbound toUnion station
(Rush hour service; on-street stop outside station)
312 St. Clair Blue Night servicestreetcar; westbound toGunns Loop(west of Keele Street)[10]
320 Yonge Blue Night service; northbound toSteeles Avenueand southbound to Queens Quay
(On-street stop outside station)
512 St. Clair Streetcar; westbound to Gunns Loop (west of Keele Street)

References

edit
  1. ^"Subway ridership, 2023-2024"(PDF).Toronto Transit Commission.RetrievedNovember 12,2024.This table shows the typical number of customer-boardings made on each subway line and the number of customers travelling to and from each station platform on a typical weekday in Sep 2023-Aug 2024.
  2. ^ab"St Clair Station – Station Description".Toronto Transit Commission.Archivedfrom the original on December 6, 2017.RetrievedDecember 2,2017.
  3. ^TTC Customer Service [@TTChelps] (January 3, 2020)."Starting January 5, 2020, the Pleasant Blvd entrance to St Clair Station will only be accessible by @PRESTOcard or PRESTO Ticket. If you are paying with cash, #TTC ticket, token or pass, please use the main entrance on St Clair Ave. East Learn more: http://bit.ly/38Q3v4E pic.twitter /Bpy7cPT7vA"(Tweet).RetrievedJanuary 7,2020– viaTwitter.
  4. ^ab"St Clair Station – Northbound Platform, Toronto, ON, Canada".Google Maps.RetrievedDecember 2,2017.
  5. ^Bow, James (July 5, 1973)."Streetcar Track Map 1973".Transit Toronto.Archivedfrom the original on March 3, 2016.RetrievedDecember 3,2017.
  6. ^abcdBow, James (September 5, 2017)."Route 512 – The St Clair Streetcar".Transit Toronto.Archivedfrom the original on December 6, 2017.RetrievedDecember 2,2017.
  7. ^Bow, James (April 21, 2013)."The Mount Pleasant Streetcar (Deceased)".Transit Toronto.Archivedfrom the original on October 21, 2017.RetrievedDecember 3,2017.
  8. ^abcBow, James (September 6, 2016)."74 Mount Pleasant".Transit Toronto.Archivedfrom the original on December 6, 2017.RetrievedDecember 3,2017.
  9. ^"Accessible Transit Services Plan − 2006 Status Report"(PDF).Toronto Transit Commission.January 2006.Archived(PDF)from the original on February 27, 2021.RetrievedDecember 3,2017.Installation of accessibility features, including elevators, is now underway at three stations, with the completion of work at Osgoode and York Mills Stations planned for early 2007, and St. Clair Station planned for June 2007.
  10. ^"Service changes on 508 Lakeshore, 512/312 St Clair and 510/310 Spadina routes".Toronto Transit Commission.June 23, 2024. Archived fromthe originalon June 13, 2024.
edit

Media related toSt. Clair Stationat Wikimedia Commons