TheEurocopter(nowAirbus Helicopters)UH-72 Lakotais a twin-engine helicopter with a single, four-bladed main rotor. The UH-72 is a militarized version of theEurocopter EC145,built by American Eurocopter (nowAirbus Helicopters, Inc.), a division ofAirbus Group, Inc.Several hundred UH-72 of various types have entered service by the 2020s since their introduction in 2006.
UH-72 Lakota | |
---|---|
General information | |
Type | Lightutilitymilitary helicopter |
National origin | Multinational |
Manufacturer | Eurocopter Airbus Helicopters |
Built by | American Eurocopter Airbus Helicopters, Inc. |
Status | In service |
Primary users | United States Army |
Number built | 463 (September 2020)[1] |
History | |
Manufactured | 2006–present |
Introduction date | 2007 |
First flight | 2006 |
Developed from | Eurocopter EC145 |
Initially marketed as theUH-145,the helicopter was selected as the winner of theUnited States Army's Light Utility Helicopter (LUH) program on 30 June 2006. In October 2006, American Eurocopter was awarded a production contract for 345 aircraft to replace the agingBell UH-1H/V IroquoisandBell OH-58A/C Kiowahelicopters in the US Army andArmy National Guardfleets. The UH-72 performs non-combat logistics and support missions within the US forhomeland security,disaster response missions, and medical evacuations. This allows the more expensive UH-60 and other types to be freed up for frontline service. The UH-72A is also used for helicopter pilot training.
In the 2020s the upgraded UH-72B version with various upgrades and a distinct ducted tail rotor began to enter service. The helicopter is noted for its lower procurement and operating costs, and deliveries are noted as being on-budget and on-time to the U.S. Army. The B model with 5-rotors (compared to 4) and other improvements was introduced in the 2020s and is the latest model entering service in 2021. Tests of an unmanned version were conducted. An armed scout version was entered in the U.S. Army'sArmed Aerial Scoutcompetition, though that program was cancelled in 2014 due to budget cuts. By 2022, over 460 aircraft had been produced including the A and B models.[2]
Development
editBackground
editThe U.S. Army'sLHXprogram began in the early 1980s, proposing two helicopter designs with a high percentage of commonality of dynamic components. One was a light utility version ( "LHX-U" ) for assault and tactical movement of troops and supplies, the other was a light scout/attack version ( "LHX-SCAT" ) to complement the growing development of theAH-64 Apache.As the program was developed, the light utility version was dropped and focus was placed on the light attack reconnaissance version,[3]which eventually became theRAH-66 Comanche.[4]
In 2004, theU.S. Department of Defenseand the US Army made the decision to terminate the RAH-66 program. As part of the termination, the Army retained the future years' funding intended for the Comanche.[5]To replace the capability of the cancelled Comanche, the US Army planned several programs, including three new aircraft. The Army Staff decided that these three aircraft, theArmed Reconnaissance Helicopter(ARH), theLight Utility Helicopter (LUH),and the Future Cargo Aircraft (FCA) (later renamedJoint Cargo Aircraft,or JCA), were to be existing, in-production commercial aircraft modified for Army service.
LUH Program and UH-145
editTheLUHprogram was initiated in early 2004, with an initial requirement for 322 helicopters to conducthomeland security,administrative, logistic, medical evacuation (MEDEVAC) and support of the army test and training centers missions. The LUH contract was released in July 2005. At least five proposals were received, including theBell 210andBell 412,MD Explorer,andAgustaWestland AW139.EADS North America(EADS NA) marketed theUH-145variant of theEC 145for the program.[6]On 30 June 2006, the U.S. Army announced that the UH-145 as the winner of the $3 billion LUH contract. In August, the UH-145 was officially designatedUH-72Aby theDepartment of Defense.The award was confirmed in October 2006 following protests from losing bidders. Despite a four-month delay due to the protests, the first UH-72 was delivered on time in December, when the nameLakotawas also formally announced for the type, following the service's tradition of giving Native American names to its helicopters.[citation needed]
On 23 August 2007, the UH-72A received full-rate production (FRP) approval to produce an initially-planned fleet of 345 aircraft through 2017.[7]The UH-72A is produced atAirbus Helicopters's facility inColumbus, Mississippi.Initial production was assembly of kits received fromEurocopter Deutschlandbut full local production was reached in 2009.[8]In December 2009, the service ordered 45 more UH-72As.[9]The 100th Lakota was delivered in March 2010,[10]and the 250th was delivered in April 2013.[11]That month, the U.S. Army opted to halt procurement after 2014 due to budget cuts;[12]at that point, a total of 312 Lakotas were on order by the service.[13]In January 2014, Congress gave the Army $171 million to procure 20 additional UH-72As.[14]The 300th UH-72 was delivered to the Army in May 2014.[15]
In May 2013, Congress questioned why the UH-72 had not been considered for the armed scout role. TheArmy Chief of StaffGeneralRay Odiernostated that the UH-72A was developed for domestic operations and is not considered to be operationally deployable to combat zones. The UH-72 is employed by theUS Army National Guardin a utility role in the US, releasingUH-60 Black Hawkhelicopters to deploy overseas.[16]On 21 June 2013,Under Secretary of Defense for Acquisition, Technology and LogisticsFrank Kendallstated in a letter to Congress that UH-72 combat modifications were "presently unaffordable". Fleet-wide combat modifications would reportedly cost $780 million and add 774 lb (351 kg) of weight per helicopter; changes would include passive and active survivability systems, hardened engines and drivetrain, external lighting and communications upgrades.[17]
Trainer use
editSince 2009 the U.S. Navy operates several UH-72A along with TH-67 Creek at the Naval Test Pilot School (USNTPS); these replaced TH-6 Cayuse.[18]In 2011, the Navy UH-72A were equipped with special avionics to support training for students.[19]
In December 2013, the US Army was considering retiring its OH-58 Kiowa fleet and transferring all Army National Guard andUS Army ReserveAH-64 Apachesto the active Army to serve as scout helicopters. With this plan all 100 active Army UH-72s along with 104 Army National Guard UH-72s would be transferred to use as training helicopters, replacing theBell TH-67 Creekat theUnited States Army Aviation Center of ExcellenceatFort Rucker,Alabama. Some active ArmySikorsky UH-60 Black Hawkswould be transferred to Army Reserve and Army National Guard units for homeland defense and disaster response missions. The proposals aim to retire older helicopters to substantially reduce costs while retaining crucial capabilities.[20]With the prospect of most UH-72s being repurposed as training helicopters, the Army requested funds to buy 100 more Lakotas to add to the training fleet. TheFY2015 budgetcovered 55 helicopters, and the funds fromFY2016were to be used to complete the purchase.[21]
On 4 September 2014, the Army issued a notice of intention to buy up to 155 UH-72s for training "on an other than full and open competitive basis".AgustaWestlandlaunched a judicial bid to have the acquisition declared unlawful, claiming that the EC145 did not offer the best value for money and that its "restricted flight maneuver envelope" impeded training. Airbus defended the Army's position, noting the EC145's prior selection, claiming AgustaWestland's cost figures were exaggerated and that it was already used for training.[22]Bell Helicopteralso criticized the decision but took no legal actions. On 14 October 2014, aFederal Claims Courtissued a temporary order denying the US government's challenge of AgustaWestland's action until the Army issued a final justification and approval (J&A) to sole-source the procurement. The Army contended that the UH-72A came under the 2006 LUH contract, and so did not require a new J&A, effectively nullifying the challenge.[23]The court sided with AgustaWestland, rejected the Army's J&A, and halted UH-72 procurement for training after finding that the Army had exaggerated the costs and time needed to acquire a training helicopter. The initial acquisition process was found negligent as it effectively tied the UH-72 to Airbus for its serviceable life. The court ordered the Army to either conduct a procurement for new training helicopters or stop buying UH-72 trainers.[24][25]The Army appealed the decision.[26][27]The lawsuit was overturned on appeal in favor of the US Army in 2018,[28]and the Army retired its last TH-67 trainer in 2021.[29]
The UH-72 has faced controversy as a trainer due to perceived problems with its use as an initial trainer. A study by the National Commission on the Future of the Army, a commission established byCongressto make recommendations on force structure of the Army to the president,[30]concluded that the UH-72 was cost-prohibitive as a training helicopter and there were cheaper options available to buy. It also showed that most instructor pilots disapproved of the UH-72, deeming it "too much aircraft for the mission", and unsuitable as an initial entry trainer.[31]The UH-72 has also been criticized as unable to teach touchdownauto-rotations,among other maneuvers. TheGerman Armyhad stopped using EC-135s for their initial trainer after Airbus advised them of it not being suitable for initial training. TheUS Navyalso rejected the UH-72 as a trainer for the same reason.[32][33][34][35]By 2024, the US Army was looking at alternatives to the UH-72 as a trainer due to cost and complexity,[36]only three years after it took over from the preceding TH-67 helicopter it replaced.[37]
Proposed uses
editThe Armed Scout 645 (EC645) was a proposed armed UH-72 variant for the US Army'sArmed Aerial Scout(AAS) program to replace the OH-58D. On 4 May 2009, EADS andLockheed Martinannounced a teaming agreement for the 645.[38][39]ThreeAAS-72Xdemonstrators were built and began flight testing in late 2010.[40]In September 2012, EADS began voluntary flight demonstrations of both an AAS-72X and an EC145 T2, reportedly meeting with performance requirements.[41][42]Two versions were offered: the AAS-72X, an armed version of the UH-72; and the AAS-72X+, an armed militarized version of theEC-145T2.[43]In late 2013, the AAS program was terminated.[44]
In May 2012, the UH-72A was submitted in theUS Air Force's Common Vertical Life Support Platform (CVLSP) program for aUH-1N Twin Hueyreplacement. As with the US Army, the UH-72A can operate in permissive environments, such asICBMsite support and security under theAir Force Global Strike Commandand personnel transport in the National Capital Region by theAir Mobility Command's89th Airlift Wing.Advantages over the UH-1N include 30 percent more speed, range, and loiter time, enhanced reliability andcrashworthiness,night vision compatibility, modern avionics, and being cheaper to operate.[45]In August 2013, the USAF said it planned to sustain the UH-1N for six to ten more years.[46]In September 2013, actingAir Force SecretaryEric Fanningreceived a letter from the CEO of EADS North America, arguing that to refit and maintain the Hueys costs more than to acquire and operate UH-72As; the letter also urged prompt action as Army orders were almost complete and production was winding down. The USAF said it had insufficient funding for such a procurement and can risk using Hueys for a while. EADS North America stated that the UH-72A "will lower the risk to the U.S. Air Force nuclear enterprise, and will save taxpayers the considerable cost of future recapitalization."[47]Reportedly, buying UH-72As would cost as much as upgrading 62 Hueys, but long-term operating costs would be much lower.[48]
In April 2024, Airbus unveiled the UH-72B Unmanned Logistics Connector, anunmannedversion of the UH-72B. It is being proposed as an uncrewed logistics platform for theUnited States Marine Corps(USMC) andUnited States Army.[49]Its proposal to the USMC addresses aerial logistics needs in thePacificrelating to Expeditionary Advanced Base Operations. Its proposal to the Army addresses the need for a VTOL logistics aircraft for contested airspace, which came alongside the recent Army cancellation of theFuture Attack Reconnaissance Aircraftand ending of theUH-60Vproduction. A scale model of the helicopter was displayed at the Sea Air Space maritime exposition in April 2024.Airbus US Space & DefenseBusiness Development manager Carl Forsling stated that the UH-72B ULC could be fielded as early as the late 2020s as an affordable and low-risk option for the USMC.[50]In April 2024, Craig Dupuy, Airbus' senior director of business development and strategy at Grand Prairie, stated:
We’re pretty close to knowing if we’ll be on contract or not; It’s a middle-tier acquisition, so they’ve conveyed to industry that they have five years from initial award to put something in the field. We’re trying to determine right now, what is our future? What is our pathway? The biggest opportunity that we see right now for the future is getting into uncrewed logistics for the Army or the Marine Corps. There’s a lot of interest in the platform, just from a value [proposition] piece, a cabin size piece. That’s where we’re being pointed to go and look and say, is this a future path for this aircraft?[49]
The UH-72B ULC will be able to carry up to 4,000 lb of Joint Modular Intermodal Containers andNaval Strike Missilecontainers, alongside other related cargo.[51]
Design
editThe initial model entered service with a traditional tail rotor, 4-blade main rotor, twin engines and a clam shell rear access. The B-model uses a 5-bladed rotor and ducted fan tail rotor, and enhanced avionics and engines.
The UH-72 is designed to take on a range of missions, from general support andmedical evacuation(MEDEVAC) topersonnel recoveryand counter-narcotics operations. They are planned to replace the UH-1 and OH-58A/C, which are older light utility helicopters, and supplant other types in domestic use, primarily those inArmy National Guardservice. The UH-72 is being procured as acommercial off-the-shelf(COTS) product, which simplifies logistics support of the fleet.[52]EADS NA has teamed withSikorskyto provide Contractor Logistics Support (CLS) for the UH-72, through its Helicopter Support, Inc. (HSI)/Sikorsky Aerospace Maintenance. (SAM) subsidiaries.[53]
The basic UH-72A is simply a commercial EC145 helicopter that has a US Army color scheme and is fitted with anAN/ARC-231radio. Other than utility transport, the Lakota can be configured for medical evacuation, VIP transport, security and support, and opposing forces training. It is described as the best military aircraft in the inventory for domestic operations, used by the Army National Guard for state support, disaster relief, and homeland defense and by non-deployed active units for MEDEVAC and training.[54]Compared to the previousUH-1 Hueyused in those roles, the twin-engine Lakota flies faster at 145 kn (269 km/h; 167 mph) versus 124 kn (230 km/h; 143 mph), has an external hoist system, and has a fully integrated computerized cockpit. The Huey has an advantage in the MEDEVAC role, being able to carry three patients compared to the Lakota's two-patient load, but an average evacuation typically deals with two or fewer patients.[55]The Security & Support Mission Equipment Package (S&S MEP) equipped on the UH-72A allows forhomeland security,counter-drug, and border patrol missions to be performed. This package includes an electro-optical/infrared sensor and laser pointer turret, moving map system and touch-screen displays, video management system, digital video recorded and datalink, searchlight, and rescue hoist from the MEDEVAC package.[56]
The upgraded UH-72B model, which harnessed improvements in the mainstream civilian model, featured a number of changes such as afenestrontail rotor (ducted fan), more powerful engines,FADEC,and enhanced avionics.[57]The B model has a fully automated FADEC for engine control, which reduces the possibility of ahot start.[57]
Operational history
editThe first aircraft was delivered to the US Army on 11 December 2006 inColumbus,Mississippi.[58]On 12 December 2006, GeneralRichard A. Cody,Vice Chief of Staff of the Army, and Joe Red Cloud, a chief of theOglalaSioux Tribe,Lakota nation,accepted the first UH-72A in an official ceremony.[59]The service estimated that delivery of the planned 345 aircraft would continue until 2017.[7]
The first production helicopters were sent to theNational Training Center (NTC), Fort Irwin,California for medical evacuation missions in January 2007. On 20 June 2007, the NTC's US Army Air Ambulance Detachment (USAAAD) became the first operational unit to field the Lakota.[60]On 10 July 2007, theTraining and Doctrine Command(TRADOC) Flight Detachment atFort Eustis,Virginia became the second US Army unit fielded with the UH-72A.[61]
A report published in August 2007 by theOperational Test and Evaluation Directorate(DOT&E) noted that although the Lakota "...is effective in the performance of light utility missions," it was prone to overheating during operations in the desert conditions of Fort Irwin when not equipped with air conditioning systems.[62]In response, vents were added in the doors to increase cabin air flow; air conditioning has been installed on some Medical and VIP versions, as well as added air conditioning units for crew comfort.[63]
TheJoint Readiness Training Center(JRTC) located atFort Polk,Louisianareceived their first aircraft on 7 September 2007. On 16 January 2009, theUnited States Military Academyreceived two UH-72As, replacing two UH-1H helicopters for VIP transport to and from the academy. The helicopters also support the cadet parachute team and cadet training missions.[64]TheUS Naval Test Pilot Schoolreceived the first of five UH-72As in September 2009. The UH-72A replaced theTH-6B Cayuseas the prime training aircraft for the test pilot school's helicopter curriculum.[65]
By March 2010, the Lakota entered service in Puerto Rico,Kwajalein Atoll,and the US Army's missile test range in Germany.[66]On 20 December 2010, a UH-72A assigned to thePuerto Rico Army National Guardbecame the first UH-72A to experience a fatal accident. The aircraft crashed at sea off the coast of Puerto Rico and all six personnel aboard were killed.[67]
On 18 July 2012, the US Army's Aviation Flight Test Directorate received three UH-72As atRedstone Arsenal,Huntsville, Alabama;they are used for general support and as chase aircraft to support aviation development testing. With this delivery, the service has received over 200 UH-72As.[68]On 22 September 2012, theOregon Army National Guard's Detachment 1, C Company, 1–112 Aviation, received the first of four UH-72A helicopters during a roll-out ceremony atCamp RileainWarrenton, Oregon.[69]
On 25 March 2015, Airbus completed assembly of the first UH-72A made specifically for training for the US Army. The training configuration of the Lakota differs from the baseline model in several ways, including an observer seat for the instructor, a "buzz number"on its side for easy identification, and a flight control system that allows it to communicate withFort Rucker.As part of the Army's aviation restructure initiative, Fort Rucker's fleet ofTH-67training helicopters will be replaced with 187 UH-72s, comprising 106 purpose-built trainers and 81 existing versions that will be modified.[70]
By 2017, 400 UH-72A had been delivered to the United States Army, with all deliveries on time and on budget, coming from the Mississippi facility, that uniquely employs 40% veterans in workforce.[71]
In 2018, the 1–376th AVN BN was deployed to Germany with UH-72A Lakotas supporting MEDEVAC missions atHohenfelsandGrafenwoehrmilitary bases. The Lakotas took over the mission from 214th Aviation Battalion Black Hawks; this is the first deployment of the Lakota outside the US.[citation needed]
In the 2020s the upgraded UH-72B model began to enter service, with number of upgrades including afenestrontail rotor, more powerful engines,FADEC,and avionics.[57]
Export
editOn 7 June 2013, Thailand requested the sale of six UH-72A Lakotas with associated equipment, training, and support for an estimated cost of $77 million.[72]On 9 October 2013, the Thai government approved $55 million in funds to support theRoyal Thai Army's acquisition of six UH-72A helicopters from 2013 to 2015.[73]On 28 March 2014, the Thai Army awarded a $34 million contract to Airbus Helicopter for six UH-72As, fitted with a mission equipment package including the AN/ARC-231 airborne radio terminal; deliveries were to begin by April 2015.[74]By November 2015, the six helicopters had been delivered.[75]
On 29 September 2014, Congress was notified of a Thailand request for the sale of another nine UH-72s, related equipment, and support.[76][77]
Variants
edit- UH-72A Lakota
- An unarmed utility military version of the EC 145.
- UH-72B Lakota
- Upgrade of the UH-72A; this configuration is based on the upgraded civilian H145. The model has aFenestrontail rotor, five-bladed main rotor, more powerful engines, enhanced controls, and the Airbus Helionix avionics suite.[78]Deliveries to the ARNG began in September 2021.[79]
- UH-72B Unmanned Logistics Connector
- A proposedunmanned variantof the UH-72B for theUnited States Marine CorpsandUnited States Army.It would provide autonomous logistical support for Expeditionary Advanced Base Operations for the USMC and contested airspace for the Army.[51]If the USMC selects it, it could be fielded by the late 2020s.[50][49]
- AAS-72X
- An armed scout and multi-role version of the UH-72A offered in the US Army'sArmed Aerial ScoutOH-58D replacement program, offered by EADS andLockheed Martinuntil AAS was cancelled. The AAS-72X had two external hardpoints and turret mounted visions system among other features, and was C-17 transportable[80]
- AAS-72X+
- An armed military version of the Eurocopter EC145T2 was also proposed for the Armed Aerial Scout program building on the features of the X model.[81]However, the X+ was equipped with more powerful engines with an extra 200 shaft horsepower each, afenestronshrouded tail rotor, and a fully digital glass cockpit.[82][83]
Operators
editSpecifications (UH-72A)
editData fromUH-72 specifications,[86]Eurocopter EC 145 data[87]
General characteristics
- Crew:1 or 2 pilots
- Capacity:9 troops or 2 stretchers and medical crew / 3,953 lb (1,793 kg) payload
- Length:42 ft 9 in (13.03 m)
- Height:11 ft 4 in (3.45 m)
- Empty weight:3,951 lb (1,792 kg)
- Max takeoff weight:7,904 lb (3,585 kg)
- Powerplant:2 ×Turbomeca Arriel 1E2turboshaftengine, 738 shp (550 kW) each
- Main rotor diameter:36 ft 1 in (11 m)
- Main rotor area:1,022.4 sq ft (94.98 m2)
- Blade section:ONERA OA415/OA312 at root; ONERA OA409/OA407 at tip[88]
Performance
- Maximum speed:167 mph (268 km/h, 145 kn)
- Cruise speed:153 mph (246 km/h, 133 kn)
- Range:426 mi (685 km, 370 nmi)
- Service ceiling:13,182 ft (4,018 m)
- Rate of climb:1,600 ft/min (8.13 m/s)
See also
editRelated development
Aircraft of comparable role, configuration, and era
Related lists
References
edit- ^"En 2020, Airbus Helicopters s'en est bien sorti".Air et Cosmos.27 January 2021.
- ^"The Army Guard's New Workhorse: the Airbus UH-72B".Vertical Mag.Retrieved7 May2024.
- ^"US Army set new LHX Timetable"Archived14 October 2012 at theWayback Machine.Fight International,27 February 1988.
- ^"From LHX to Comanche"Archived9 February 2009 at theWayback Machine.Globalsecurity.org, 25 March 2008.
- ^"Briefing on the Restructure and Revitalization of Army Aviation"Archived9 May 2009 at theWayback Machine.U.S. Department of Defense, 23 February 2004.
- ^"EADS North America to Offer the UH-145 for the U.S. Army's light utility helicopter (LUH) mission"Archived5 February 2008 at theWayback Machine.EADS North America, 24 August 2005.
- ^ab"The UH-72A “comes home” to its new Army assignment in Mississippi "Archived17 July 2011 at theWayback Machine.EADS North America, 7 June 2008.
- ^"EADS underscores commitment to U.S. production"Archived26 July 2008 at theWayback Machine.Reuters, 9 May 2008.
- ^"EADS North America receives $247 million contract for Light Utility Helicopter program"Archived17 July 2011 at theWayback Machine.EADS North America, 10 December 2009.
- ^Trimble, Stephen (4 March 2010)."How long before UH-72 gets militarized?".flightglobal.Archivedfrom the original on 10 July 2010.Retrieved4 June2011.
- ^EADS North America Delivers 250th UH-72A Lakota Helicopter to U.S. ArmyArchived23 May 2013 at theWayback Machine– EADS North America press release, 25 April 2013
- ^Army Trimming Light Utility Helicopter ProgramArchived23 October 2013 at theWayback Machine– Aviationweek, 10 April 2013.
- ^The Last Of The LakotasArchived10 June 2013 at theWayback Machine.Strategypage, 29 May 2013.
- ^US Army to acquire 20 more LakotasArchived22 January 2014 at theWayback MachineFlightglobal, 17 January 2014.
- ^Airbus Group Delivers 300th On-Time, On-Budget UH-72A Lakota Helicopter to U.S. ArmyArchived7 October 2015 at theWayback Machine– Reuters, 14 May 2014
- ^Cox, Matthew."Army Defends GCV, Keeps Lakota Stateside".Archived8 June 2013 at theWayback MachineDoDBuzz, 9 May 2013.
- ^"Upgrading UH-72As for combat conditions 'unaffordable', Pentagon says."Archived2 July 2013 at theWayback MachineJane's, 27 June 2013.
- ^"The North Spin - News: NAVAIR Works with Army to Purchase H-72 Lakotas for USNTPS".thenorthspin.Retrieved6 April2024.
- ^HeliHub (26 May 2011)."Navy Test Pilot School Lakotas receive state-of-the-art instrumentation".HeliHub.Retrieved6 April2024.
- ^"Army Plans To Scrap Kiowa Helo Fleet"Archived14 December 2013 at theWayback Machine.MarineCorpstimes, 9 December 2013.
- ^US Army Seeks To Purchase 100 Lakota Helicopters– Defensenews, 27 February 2014
- ^Rotorcraft rivals trade blows over US Army trainer buyArchived30 September 2014 at theWayback Machine– Flightglobal, 29 September 2014
- ^Army Moves Ahead with Airbus Trainer PlanArchived10 December 2014 at theWayback Machine– Ainonline, 7 December 2014
- ^In the United States Court of Federal Claims, MEMORANDUM OPINION AND ORDER ENJOINING THE ARMY'S DESIGNATION OF THE UH-72A LAKOTA HELICOPTER AS THE ARMY'S "INSTITUTIONAL TRAINING HELICOPTER" AND DECEMBER 10, 2015 PROPOSAL TO PURCHASE ADDITIONAL UH-72A LAKOTA HELICOPTERS, WITHOUT "FULL AND OPEN" COMPETITIONArchived20 June 2017 at theWayback Machine;No. 14-877 C Filed 24 August 2016, PUBLIC VERSION; hosted on Defense Daily Network.
- ^"WHERE DO ACTION OFFICERS DREAM UP THESE SCHEMES? – Public Contracting Institute".publiccontractinginstitute.29 November 2016.Archivedfrom the original on 18 October 2017.Retrieved18 October2017.
- ^Judson, Jen (26 December 2016)."Army Appeals Court Decision To Stop Lakota Helo Buy".Defense News. Defense News.
- ^"U.S. Army Hopes For Decision On Lakota Appeal By Fall".aviationweek.Archivedfrom the original on 18 October 2017.Retrieved18 October2017.
- ^Judson, Jen (24 January 2018)."US Army wins appeal in Leonardo lawsuit holding Lakota buys hostage".Defense News.Retrieved30 August2024.
- ^Hughes, Jim (18 February 2021)."Fort Rucker, Army Aviation bid bittersweet farewell to TH-67 Creek".US Army.Retrieved30 August2024.
- ^"Background – National Commission on the Future of the Army".ncfa.ncr.gov.Archived fromthe originalon 13 February 2017.Retrieved16 October2017.
- ^"UH-72 AS A PRIMARY TRAINER"(PDF).National Commission on the Future of the Army.NCFA. Archived fromthe original(PDF)on 20 February 2017.Retrieved16 October2017.
- ^"Auto-rotation training drives German army light-twin requirement".Flight Global.Archivedfrom the original on 9 July 2017.Retrieved16 October2017.
- ^Osborn, Tony (13 April 2017)."U.S. Army Transitioning Rotary-Wing Training To Lakota".Aviation Week.Archivedfrom the original on 17 October 2017.
- ^Rogoway, Tyler (2 May 2017)."US Army Says It Badly Needs A Scout Helicopter After Junking The Ones It Had".The War Zone.Archivedfrom the original on 17 October 2017.Retrieved16 October2017.
- ^"'Bidders' Head to Florida to Navy Trainer Event ".Rotor and Wing.Archivedfrom the original on 17 October 2017.Retrieved16 October2017.
- ^Judson, Jen (26 August 2024)."US Army takes new look at training aviators with decisions coming soon".Defense News.Retrieved30 August2024.
- ^Hughes, Jim (18 February 2021)."Fort Rucker, Army Aviation bid bittersweet farewell to TH-67 Creek".US Army.Retrieved30 August2024.
- ^"EADS North America selects Lockheed Martin as Mission Equipment Package integrator for new Armed Scout Helicopter"Archived7 November 2017 at theWayback Machine.Eurocopter, 4 May 2009.
- ^Armed Scout fact sheetArchived29 May 2009 at theWayback Machine.EADS NA/Lockheed Martin, Retrieved: 4 June 2011.
- ^Warwick, Graham (4 April 2010)."Army's Aerial Scout Options Expand".Aviation Week.[permanent dead link ]
- ^EADS starts voluntary US Army flight demo of AAS-72X+Archived1 February 2014 at theWayback Machine.Flightglobal, 26 September 2012
- ^EADS urges US Army to buy new scout helicopterArchived23 October 2012 at theWayback Machine.Flightglobal, 18 October 2012
- ^AAS versionsArchived20 October 2012 at theWayback Machine.AOL.Defense, 18 October 2012
- ^Outgoing General: US Army Must Continue To Fund Research and Development– Defensenews, 14 January 2014
- ^UH-72 Lakota Could Be a Candidate for Air Force DutyArchived14 May 2013 at theWayback Machine– Defensemedianetwork, 10 March 2013
- ^air force planning decade-long Huey extensionArchived22 August 2013 at theWayback Machine– Militarytimes, 22 August 2013
- ^EADS Urges Air Force’s Fanning To Buy Lakota Helos For Nuke MissionArchived25 September 2013 at theWayback Machine– Breakingdefense, 16 September 2013
- ^EADS Targets U.S. Air Force As Next UH-72 Lakota CustomerArchived9 January 2014 at theWayback Machine– Aviationtoday, 1 December 2013
- ^abcNorris, Guy (26 April 2024)."Uncrewed Airbus Lakota Marine Logistics Bid May Spur Army Role".Aviation Week.Retrieved28 April2024.
- ^ab"UH-72B Unmanned Logistics Connector".Airbus.
- ^Jesmain, Andrew."DIIG Current Issues No.7: Case Study: The Drivers of a Successful COTS Acquisition"Archived2 April 2012 at theWayback Machine.Center for Strategic and International Studies (CSIS), 2009.
- ^"Sikorsky Contractor Logistics Support"Archived10 January 2011 at theWayback MachineSikorsky. April 2007
- ^Stateside Lakota deliveries let Black Hawks go to theaterArchived13 October 2014 at theWayback Machine– Army.mil, 22 April 2011
- ^'Huey' takes historic last ride at Yakima Training CenterArchived13 October 2014 at theWayback Machine– Army.mil, 3 February 2011
- ^New Lakota variant packs punch for GuardArchived13 October 2014 at theWayback Machine– Army.mil, 29 September 2011
- ^abc"The Army Guard's New Workhorse: the Airbus UH-72B".Vertical Mag.Retrieved6 April2024.
- ^Sims, Paul."Ready for flight. Eurocopter delivers first UH-72A to U.S. Army as world's media watches."[permanent dead link ]Starkville Daily News, 12 December 2006.
- ^US Army unveils UH-72A LakotaArchived12 December 2006 at theWayback Machine.US Army, 11 December 2006.
- ^"UH-72A Light Utility Helicopter Enters Operational Service with the First Full-equipped US Army Unit"Archived4 October 2012 at theWayback MachineEADS North America,19 June 2007.
- ^Dinklage, Lindy."Lakotas mark transition in Army aviation"Archived17 June 2011 at theWayback Machine.U.S. Army, Fort Eustis Public Affairs, 15 October 2007. Retrieved: 28 June 2009.
- ^Davis, Aaron C. for Associated Press."New Army chopper overheats".encyclopedia, 10 November 2007.
- ^"UH-72 Lakota: Hot n’ High"Archived5 May 2009 at theWayback Machine.defenseindustrydaily, 18 November 2007.
- ^"USMA takes possession of new helicopters"Archived11 June 2011 at theWayback Machine.Mid-Hudson News Network, 17 January 2009.
- ^"Expanding missions for the UH-72A are highlighted at the 100th Lakota delivery ceremony".EADS North America. 4 March 2010. Archived fromthe originalon 10 May 2010.Retrieved19 April2010.
- ^Tremble, Stephen."UH-72A crashes off Puerto Rico in first major mishap"Archived26 December 2010 at theWayback Machine.Flight International,22 December 2010.
- ^"Army Fields Three UH-72A Lakotas to Redstone Arsenal".19 July 2012.Archivedfrom the original on 16 December 2013.Retrieved19 July2012.
- ^"Oregon National Guard to roll out new UH-72A Lakota Helicopters".Archived fromthe originalon 15 December 2013.Retrieved23 September2012.
- ^First Purpose-Built UH-72A Training Helicopter on Its Way to Fort Rucker– Nationaldefensemagazine.org, 25 March 2015
- ^Orban, André (10 October 2017)."Airbus Helicopters delivers 400th UH-72A Lakota to U.S. Army".Aviation24.be.Retrieved6 April2024.
- ^"Thailand Seeks Six UH-72A Lakota Helicopters"Archived14 December 2013 at theWayback Machine– Deagel, 20 June 2013.
- ^Thai government approves funds for helicopter procurementArchived15 October 2013 at theWayback Machine– Janes, 9 October 2013
- ^"Thailand finalises purchase of Lakota helicopters"Archived7 April 2014 at theWayback Machine– Janes, 31 March 2014
- ^"US Army adds 12 more UH-72A Lakotas to trainer order"Archived14 November 2015 at theWayback Machine– Flightglobal, 12 November 2015.
- ^"Thailand – UH-72A Lakota Helicopters"Archived3 October 2014 at theWayback Machine.Defense Security Cooperation Agency, 29 September 2014.
- ^"FMS: Thailand Wants Nine UH-72A Lakota Helicopters"Archived6 October 2014 at theWayback Machine.Deagel, 29 September 2014.
- ^"Airbus delivers first UH-72B Lakota helicopter to the U.S. Army National Guard".Airbus, 7 September 2021.
- ^Airbus unveils B-model Lakota helos to enter US Army fleet next year.Defense News.28 August 2020.
- ^"Armed Aerial Scout 72X (AAS-72X) Helicopter".Army Technology.Retrieved9 May2024.
- ^"Armed Aerial Scout 72X (AAS-72X) Helicopter".Army Technology.Retrieved9 May2024.
- ^"Scout Helicopter Competitors to Army: It’s Time for a Flyoff".Nationaldefensemagazine, December 2012
- ^"EADS urges US Army to buy new scout helicopter"Archived23 October 2012 at theWayback Machine.Flight International
- ^abc"World Air Forces 2018".Flightglobal Insight. 2018.Archivedfrom the original on 6 February 2018.Retrieved4 August2018.
- ^"U.S. Naval Test Pilot School UH-72A Lakotas have arrived".navy.mil.Archivedfrom the original on 4 March 2016.Retrieved10 March2013.
- ^UH-72A Lakota specificationsArchived26 August 2014 at theWayback Machine.Airbus Helicopters, Inc.
- ^Eurocopter EC 145 Technical DataArchived29 September 2007 at theWayback Machine.Eurocopter
- ^Lednicer, David."The Incomplete Guide to Airfoil Usage".m-selig.ae.illinois.edu.Retrieved16 April2019.