Vande Bharat Expressis a medium to long-distancesemi-high speedsuperfast express serviceoperated byIndian Railways.It is areserved,air-conditionedchair carservice connecting cities that are less than 800 km (500 mi) apart or take less than ten hours to travel with existing services and a plannedreserved,air-conditionedsleeperservice connecting cities that are 800 km (500 mi) to 1,200 km (750 mi) apart. The train was a part of the 'Make in India' initiative by the government and entered commercial service on 15 February 2019.

Vande Bharat Express
Vande Bharat Express trains in different liveries
Overview
Service typeInter-citysemi-high-speed rail
StatusActive
PredecessorShatabdi Express
First service15 February 2019;6 years ago(2019-02-15)
Websiteindianrail.gov.in
Route
Line(s) used66
On-board services
Class(es)
  • AC Chair Car (CC)
  • AC Executive Class (EC)
Seating arrangements
  • Airline style
  • Rotatable seats (EC)
Catering facilitiesOn-board catering
Observation facilitiesWide windows
Entertainment facilities
Baggage facilitiesOverhead racks
Other facilities
Technical
Rolling stock
Track gauge1,676 mm(5 ft 6 in)broad gauge
Electrification25 kV 50 Hz ACviaoverhead line
Operating speed
  • 160 km/h (99 mph) (maximum)
  • 83 km/h (52 mph)[1][2](average)
Average length
  • 384 m (1,260 ft) (16 coaches)
  • 192 m (630 ft) (8 coaches)
  • 480 m (1,570 ft) (20 coaches)

Thechair car trainsetsare self-propellingElectric Multiple Units(EMUs) with eight, sixteen or twenty coaches. The trainset was designed and manufactured byIntegral Coach FactoryinChennai.Introduced in 2018, the trainsets achievedsemi-high speedsof 183 km/h (114 mph) on trials, and crossed target trial speed of 180 km/h (110 mph) on trials, but the maximum operational speed is 160 km/h (99 mph) which is achieved by theRani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat ExpressandHazrat Nizamuddin-Khajuraho Vande Bharat Expresson theTughlakabadAgrasection. This is the highest operational speed on the Indian Railways network, shared withGatimaan Expressover the same section. A notable feature of Vande Bharat Express is its faster acceleration and deceleration, because of which it went from0 to 100 km/hin just 52 seconds during trial which is quicker than some high-speed trains. Thesleeper trainsetsareEMUswith sixteen coaches.

History

edit

Efforts to increase speed (1960–2016)

edit

In 1960, theRailway Board of Indiacommissioned a study to increase the speed of its trains, which was restricted to 96 km/h (60 mph) on the existentbroad gaugelines.[3]A target of 160 km/h (99 mph) with an intermediate stage of 120 km/h (75 mph) was set for passenger trains.Research Design and Standards Organisation(RDSO) started work on the same and using thecoacheswere manufactured by theIntegral Coach Factory(ICF) atMadrasand hauled bydiesel locomotives,Rajdhani Expresscapable of reaching speeds of up to 120 km/h (75 mph) were introduced in 1969.[4][5]With the introduction ofWAP-1electric locomotives,Shatabdi Expressintroduced in 1988, were capable of running at a maximum speed of 130 km/h (81 mph).[6][7][8]

Talgotrain atNew Delhi railway stationduring trials in 2016

From the late 1990s, the ICF coaches were replaced by safer and newerLHB coachesdesigned byLinke-Hofmann-BuschofGermany.[9][10]In December 2009, theMinistry of RailwaysofGovernment of Indiaenvisaged the implementation of high-speed rail projects to provide services at 250–350 km/h (160–220 mph) with the upgradation of existing tracks, construction of new lines and introduction of high speed trainsets.[11][12]In 2014, proposals were made to introduce semi-high-speed 160–200 km/h (99–124 mph) services between major cities.[13]In 2016,Gatimaan Expresswas inaugurated which achieved speeds of 160 km/h (99 mph) between Delhi and Agra.[14]

In June 2016, Indian Railways soughtRequests For Qualification(RFQ) to jointly manufacture five thousandElectric Multiple Unit(EMU) sets with interested international and domestic parties.[15]In 2015,Talgoconducted trial runs on theMumbai–Delhi line,completing the journey in ten hours, almost six hours quicker than the existing fastest train with an average speed of 117.5 km/h (73.0 mph). There were significant issues such as the adaptation ofrakes,maintenance, higher costs and robustness.[16]Indian Railwayscould not reach a direct agreement and the deal never materialised.[17]

Making an indigenous trainset (2016–19)

edit

After foreign proposals for introducing semi-high-speed trains were unsuccessful, theMake in Indiacampaign fuelled the cause for developing the next generation EMU semi-high-speed trainsets locally. ICF worked on an indigenous design, which was constructed at the Integral Coach Factory.[18]These trainsets known as Train 18 initially, were introduced in 2018 and reached speeds of up to 183 km/h (114 mph) in trials.[19]These trainsets were later renamed toVande Bharat.[20]

Introduction and further (2019–present)

edit
Inauguration of the first Vande Bharat Express toVaranasiat theNew Delhi railway station

On 15 February 2019, thefirst Vande Bharat ExpressbetweenNew DelhiandVaranasiwas flagged off at theNew Delhi railway stationby Prime MinisterNarendra Modi.[21][22]The train covered a distance of 759 km (472 mi) in 8 hours at an average speed of 95 km/h (59 mph) and reduced the existing travel time along the route by 15%.[23]In October 2019, thesecond servicewas launched between New Delhi andKatra.[24]

After the inauguration of the first two services, Indian Railways stopped production of new train-sets owing to internal issues.[25]In 2019, Indian Railways resumed tenders for the production of new sets with more time provided to come up with the cheapest bid for the upgrades required.[26]The second generation trainsets entered service on 30 September 2022.[27]Since Vande Bharat trains provide fast service across short-distances, similar to the Shatabdi Express, the trains will eventually replace the existing Shatabdis and Rajdhanis.[28][29]In December 2023, the Government announced a target to have 4,500 Vande Bharat trains by 2047.[30]

Sleeper version (2023-present)

edit

As of 2023, ICF was developing a long-distance version of the Vande Bharat trainset with sleeper cars.[29]The first prototype was rolled out byBEMLin September 2024.[31]The first trainset was expected to be ready for testing by 20 September and enter commercial service by December 2024.[32][33]

Rolling stock

edit
Thetrainsetis capable of reaching speeds of up to 180 km/h (110 mph) but limited operationally to lower speeds

Vande Bharat Express uses Electric Multiple Unit (EMU) trainsets manufactured by Integral Coach Factory in Chennai.[34]The trainsets have eight, sixteen or twentychair cars.[35]A standard sixteen car rake consists of twoDriving Trailer Coaches,one each on every end along with two non-driver trailer coaches, four trailer coaches withpantographsand eightmotor coaches.[36]A second generation sixteen car trainset weighs 392 tonnes and costs115 crore(US$13 million).[37][38]The chassis of a coach is 23 m (75 ft) long, and is made ofstainless steel.[39]

During its trial runs, the trainsets had clocked speeds of up to 183 km/h (114 mph) with an acceleration of 0–100 km/h (0–62 mph) in 52 seconds.[19][40]The operational speed is limited due to track restrictions, halts and traffic congestion. The maximum operational speed of 160 km/h (99 mph) is achieved by theRani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat ExpressandHazrat Nizamuddin-Khajuraho Vande Bharat Expresson the 174 km (108 mi)TughlakabadAgrasection.[41]

Facilities

edit
AC Executive Class (EC)
AC Chair Car (CC)

The train has two classes of accommodation with the AC Executive Class being the premium class and the AC chair being the other. The executive class coach can seat 52 passengers and is equipped withrotating seatsin a 2x2 configuration.[42]The chair car coaches can seat 78 passengers per coach (44 in first and last coaches) and are equipped with retractable seats in 2x3 configuration.[43]The coaches are fullyair conditionedand equipped withelectric outlets,reading lights,CCTV cameras,automatic doors,bio-vacuum toilets,Sensor-based water tapsandPassenger information system.[44]The coaches have wider windows with roller blinds and overhead racks for luggage.[45]The service offers onboardcateringwith both vegetarian and non-vegetarian meal options included in the fare as standard.[46][47]

Services

edit

The first service was introduced in February 2019. By December 2023, about 35 trains were operational.[48]As of February 2025,66 Vande Bharat trains are in service, which includes 16 sixteen-car services, 08 twenty-car services and 43 eight-car services.[49]

Service Zone Cars Distance Travel time Speed Inaugural run
Maximum[a] Average
New Delhi–Varanasi NR 20 759 km (472 mi) 8h 00m 130 km/h (81 mph) 95 km/h (59 mph) 15 February 2019
New Delhi–SMVD Katra NR 20 655 km (407 mi) 8h 05m 130 km/h (81 mph) 81 km/h (50 mph) 3 October 2019
Mumbai Central–Gandhinagar Capital WR 16 522 km (324 mi) 6h 25m 130 km/h (81 mph) 81 km/h (50 mph) 30 September 2022
New Delhi–Amb Andaura NR 16 412 km (256 mi) 5h 15m 130 km/h (81 mph) 79 km/h (49 mph) 13 October 2022
Chennai Central–Mysuru SR 16 496 km (308 mi) 6h 30m 130 km/h (81 mph) 76 km/h (47 mph) 11 November 2022
Bilaspur–Nagpur SECR 8 412 km (256 mi) 5h 30m 130 km/h (81 mph) 75 km/h (47 mph) 11 December 2022
Howrah–New Jalpaiguri ER 16 566 km (352 mi) 7h 30m 130 km/h (81 mph) 75 km/h (47 mph) 30 December 2022
Visakhapatnam–Secunderabad ECoR 20 698 km (434 mi) 8h 35m 130 km/h (81 mph) 81 km/h (50 mph) 15 January 2023
Mumbai CSMT–Solapur CR 16 454 km (282 mi) 6h 35m 130 km/h (81 mph) 69 km/h (43 mph) 10 February 2023
Mumbai CSMT–Sainagar Shirdi CR 16 343 km (213 mi) 5h 10m 130 km/h (81 mph) 66 km/h (41 mph)
Rani Kamalapati (Habibganj)–Hazrat Nizamuddin WCR 16 702 km (436 mi) 7h 36m 160 km/h (99 mph) 92 km/h (57 mph) 1 April 2023
Secunderabad–Tirupati SCR 16 662 km (411 mi) 8h 19m 130 km/h (81 mph) 80 km/h (50 mph) 8 April 2023
Chennai Central–Coimbatore SR 8 495 km (308 mi) 6h 00m 130 km/h (81 mph) 82 km/h (51 mph)
Ajmer–Chandigarh NWR 20 678 km (421 mi) 8h 25m 130 km/h (81 mph) 81 km/h (50 mph) 12 April 2023
Kasaragod–Thiruvananthapuram SR 20 586 km (364 mi) 8h 10m 110 km/h (68 mph) 72 km/h (45 mph) 25 April 2023
Howrah–Puri SER 16 500 km (310 mi) 6h 25m 130 km/h (81 mph) 78 km/h (48 mph) 18 May 2023
Dehradun–Anand Vihar Terminal NR 8 302 km (188 mi) 4h 45m 110 km/h (68 mph) 64 km/h (40 mph) 25 May 2023
New Jalpaiguri–Guwahati NFR 8 407 km (253 mi) 5h 30m 110 km/h (68 mph) 74 km/h (46 mph) 29 May 2023
Mumbai CSMT–Madgaon CR 8 580 km (360 mi) 7h 45m 120 km/h (75 mph) 75 km/h (47 mph) 27 June 2023
Patna–Ranchi ECR 8 380 km (240 mi) 6h 00m 130 km/h (81 mph) 63 km/h (39 mph)
KSR Bengaluru–Dharwad SWR 8 490 km (300 mi) 6h 25m 110 km/h (68 mph) 76 km/h (47 mph)
Rani Kamalapati (Habibganj)–Rewa WCR 8 568 km (353 mi) 8h 00m 110 km/h (68 mph) 71 km/h (44 mph)
Indore–Nagpur WR 8 636 km (395 mi) 8h 20m 110 km/h (68 mph) 76 km/h (47 mph)
Jodhpur–Sabarmati (Ahmedabad) NWR 8 449 km (279 mi) 6h 00m 130 km/h (81 mph) 75 km/h (47 mph) 7 July 2023
Gorakhpur–Prayagraj NER 8 497 km (309 mi) 7h 30m 110 km/h (68 mph) 66 km/h (41 mph)
Udaipur–Jaipur NWR 8 435 km (270 mi) 6h 20m 130 km/h (81 mph) 69 km/h (43 mph) 24 September 2023[50]
Chennai Central–Vijayawada SR 8 514 km (319 mi) 6h 40m 130 km/h (81 mph) 77 km/h (48 mph)
Chennai Egmore–Tirunelveli SR 16 650 km (400 mi) 7h 50m 110 km/h (68 mph) 83 km/h (52 mph)
Kacheguda–Yesvantpur SCR 8 612 km (380 mi) 8h 15m 110 km/h (68 mph) 74 km/h (46 mph)
Patna–Howrah ECR 16 532 km (331 mi) 6h 35m 130 km/h (81 mph) 81 km/h (50 mph)
Ranchi–Howrah SER 8 458 km (285 mi) 7h 10m 130 km/h (81 mph) 64 km/h (40 mph)
Puri–Rourkela ECoR 8 506 km (314 mi) 7h 45m 130 km/h (81 mph) 65 km/h (40 mph)
Mangaluru Central–Thiruvananthapuram SR 8 620 km (390 mi) 8h 40m 110 km/h (68 mph) 72 km/h (45 mph)
Ahmedabad–Okha WR 8 499 km (310 mi) 6h 30m 110 km/h (68 mph) 77 km/h (48 mph)
Varanasi–New Delhi NR 20 759 km (472 mi) 8h 05m 130 km/h (81 mph) 94 km/h (58 mph) 18 December 2023[51]
Anand Vihar Terminal–Ayodhya Cantt. NR 16 628 km (390 mi) 8h 20m 130 km/h (81 mph) 75 km/h (47 mph) 30 December 2023[52]
SMVD Katra–New Delhi NR 20 655 km (407 mi) 8h 10m 130 km/h (81 mph) 80 km/h (50 mph)
Amritsar–Delhi Junction NR 8 447 km (278 mi) 5h 30m 130 km/h (81 mph) 81 km/h (50 mph)
Coimbatore–Bengaluru Cantt. SR 8 374 km (232 mi) 6h 25m 110 km/h (68 mph) 58 km/h (36 mph)
Mangaluru Central–Madgaon SR 8 319 km (198 mi) 5h 30m 120 km/h (75 mph) 58 km/h (36 mph)
Jalna–Mumbai CSMT SCR 8 435 km (270 mi) 6h 50m 110 km/h (68 mph) 64 km/h (40 mph)
Kalaburagi–SMVT Bengaluru CR 8 548 km (341 mi) 8h 45m 130 km/h (81 mph) 63 km/h (39 mph) 12 March 2024[53][54]
New Jalpaiguri–Patna NFR 8 473 km (294 mi) 6h 55m 130 km/h (81 mph) 68 km/h (42 mph)
Lucknow–Dehradun NER 8 545 km (339 mi) 8h 20m 110 km/h (68 mph) 65 km/h (40 mph)
Ahmedabad–Mumbai Central WR 16 493 km (306 mi) 5h 25m 130 km/h (81 mph) 91 km/h (57 mph)
Mysuru–Chennai Central SWR 8 497 km (309 mi) 6h 25m 130 km/h (81 mph) 77 km/h (48 mph)
Hazrat Nizamuddin–Khajuraho NR 8 660 km (410 mi) 8h 20m 160 km/h (99 mph) 79 km/h (49 mph)
Secunderabad–Visakhapatnam SCR 16 698 km (434 mi) 8h 45m 130 km/h (81 mph) 80 km/h (50 mph)
Ranchi–Varanasi SER 8 539 km (335 mi) 7h 50m 110 km/h (68 mph) 69 km/h (43 mph)
Bhubaneswar–Visakhapatnam ECoR 8 444 km (276 mi) 5h 45m 130 km/h (81 mph) 77 km/h (48 mph)
Patna–Gomti Nagar (Lucknow) ECR 8 545 km (339 mi) 8h 25m 130 km/h (81 mph) 65 km/h (40 mph)
Chennai Egmore–Nagercoil SR 16 724 km (450 mi) 8h 50m 110 km/h (68 mph) 82 km/h (51 mph) 31 August 2024[55]
Madurai–Bengaluru Cantt. SR 8 573 km (356 mi) 7h 45m 110 km/h (68 mph) 74 km/h (46 mph)
Meerut–Lucknow Charbagh NR 8 459 km (285 mi) 7h 10m 110 km/h (68 mph) 64 km/h (40 mph)
Udaipur–Agra Cantt. NWR 8 610 km (380 mi) 8h 45m 130 km/h (81 mph) 70 km/h (43 mph) 2 September 2024[56]
Tatanagar–Patna SER 8 451 km (280 mi) 7h 15m 130 km/h (81 mph) 62 km/h (39 mph) 15 September 2024[57]
Tatanagar–Brahmapur SER 8 587 km (365 mi) 9h 05m 130 km/h (81 mph) 65 km/h (40 mph)
Howrah–Rourkela SER 8 412 km (256 mi) 5h 50m 130 km/h (81 mph) 71 km/h (44 mph)
Howrah–Gaya ER 16 459 km (285 mi) 5h 40m 130 km/h (81 mph) 81 km/h (50 mph)
Howrah–Bhagalpur ER 8 386 km (240 mi) 6h 20m 130 km/h (81 mph) 61 km/h (38 mph)
Varanasi–Deoghar NR 8 456 km (283 mi) 7h 20m 130 km/h (81 mph) 62 km/h (39 mph)
SSS Hubballi–Pune SWR 8 559 km (347 mi) 8h 30m 110 km/h (68 mph) 66 km/h (41 mph) 16 September 2024
SCSMT Kolhapur–Pune CR 8 326 km (203 mi) 5h 15m 110 km/h (68 mph) 62 km/h (39 mph)
Agra Cantt.–Banaras NCR 8 573 km (356 mi) 7h 00m 130 km/h (81 mph) 82 km/h (51 mph)
Nagpur–Secunderabad CR 8 575 km (357 mi) 7h 15m 130 km/h (81 mph) 79 km/h (49 mph)
Durg–Visakhapatnam SECR 8 567 km (352 mi) 8h 00m 130 km/h (81 mph) 71 km/h (44 mph)

See also

edit

Notes

edit
  1. ^Maximum permissible speed over different sections as approved by theCommissioner of Railway Safety

References

edit
  1. ^"Vande Bharat Express averages 83 kmph, falls short of its top speed of 130 kmph".Livemint.18 April 2023.Retrieved7 March2024.
  2. ^"Built to hit 180 kmph, WHY do Vande Bharat Express trains run at 83 kmph average speed? RTI reply reveals".The Financial Express.19 April 2023.Archivedfrom the original on 19 April 2024.Retrieved7 March2024.
  3. ^"Railways golden girl: 50 years of the Rajdhani story".The Hindustan Times.9 March 2019.Archivedfrom the original on 6 January 2024.Retrieved1 December2023.
  4. ^Railway Budget of 1969–70(PDF).Indian Railways(Report).Archived(PDF)from the original on 15 April 2015.Retrieved1 December2023.
  5. ^"Kolkata loses last connect to first Rajdhani".The Times of India.22 May 2016.Archivedfrom the original on 6 January 2024.Retrieved1 December2023.
  6. ^WAP-1 locomotive(PDF).South East Central Railway(Report). 9 October 1989.Archived(PDF)from the original on 15 March 2024.Retrieved1 December2023.
  7. ^"'Shatabdi is the heart of Indian railways'".The Times of India.30 May 2014.Archivedfrom the original on 11 January 2024.Retrieved1 December2023.
  8. ^"Trains faster than Rajdhani, Shatabdi on the cards".The Economic Times.23 January 2018.Archivedfrom the original on 5 November 2022.Retrieved5 November2022.
  9. ^"Indian Railways Passenger Coaches: Safety Features and Technologies Adopted"(PDF).International Journal of Engineering Technology Science and Research.April 2017.Archived(PDF)from the original on 28 February 2018.Retrieved27 February2018.
  10. ^Debroy, Bibek (9 February 2018)."A 70-Year-Old Vs a 30-Year-Old: LHB Coaches Perform Better than ICF Ones".Business Standard.Archivedfrom the original on 29 April 2023.Retrieved6 June2023.
  11. ^Indian Railways: Vision 2020(PDF).Indian Railways(Report). 18 December 2009.Archived(PDF)from the original on 3 March 2016.Retrieved29 November2014.
  12. ^"India getting ready for bullet trains".Central Chronicle.18 December 2009. Archived fromthe originalon 17 July 2011.Retrieved1 December2023.
  13. ^"Rail Budget 2014: High-speed trains proposed to connect major cities".The Economic Times.8 July 2014.ISSN0013-0389.Retrieved19 May2023.
  14. ^"200 km in 90 mins: Delhi-Agra high speed train sets new speed record".The Economic Times.3 July 2014. Archived fromthe originalon 11 July 2014.Retrieved10 July2014.
  15. ^"Indian Railways to invite bids for manufacturing modern coaches".The Statesman.2 May 2017.Retrieved19 May2023.
  16. ^Dhoot, Vikas (24 July 2015)."Train from Spain: Government considering Talgo proposal to run trial runs of faster trains between Mumbai, Delhi".The Economic Times.Archivedfrom the original on 25 July 2015.Retrieved24 July2015.
  17. ^Ranjan, Rakesh (2 January 2018)."Talgo high-speed trains stop in their tracks after government waves red flag".India Today.Archivedfrom the original on 22 August 2021.Retrieved22 August2021.
  18. ^"RDSO design light aluminum coaches of Train-18 which can cruise at 200 KMPH".The Times of India.23 June 2022.
  19. ^ab"Vande Bharat clocks 183 km but glass filled to the brim with water stays stable".The Economic Times.6 September 2022.Retrieved31 October2023.
  20. ^"Train 18 named Vande Bharat Express: Piyush Goyal".The Economic Times.27 January 2019.ISSN0013-0389.Retrieved20 May2023.
  21. ^"Vande Bharat Express flagged off: How to book, fares and more".The Hindustan Times.15 February 2019.Archivedfrom the original on 4 September 2024.Retrieved20 May2023.
  22. ^"Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi".Business Today.7 February 2019.Archivedfrom the original on 7 February 2019.Retrieved17 February2019.
  23. ^"Train 18, India's first engine-less train, set to hit tracks on October 29".The Indian Express.24 October 2018.Archivedfrom the original on 6 November 2018.Retrieved1 December2023.
  24. ^"Vande Bharat Express: Reach Katra in 8 hours from Delhi - Amit Shah flags off Vande Bharat Express".The Economic Times.3 October 2019.Archivedfrom the original on 4 September 2024.Retrieved20 May2023.
  25. ^"Fresh Tender System For Vande Bharat Express After 'Favouritism Charges'".NDTV.Press Trust of India.16 July 2019.Archivedfrom the original on 21 May 2023.Retrieved30 June2023.
  26. ^"40 new Vande Bharat Express trains by 2022".The Hindustan Times.4 September 2019.Archivedfrom the original on 4 September 2024.Retrieved20 May2023.
  27. ^"Vande Bharat Express 2.0: PM flags off a new train between Gandhinagar and Mumbai, here's all to know".Business Today.30 September 2022.Archivedfrom the original on 5 December 2022.Retrieved5 December2022.
  28. ^"Vande Bharat Express: राजधानी-शताब्दी की जगह लेगी".{{cite web}}:CS1 maint: url-status (link)
  29. ^ab"'Vande Bharat may soon replace Rajdhani and Shatabdi' — In conversation with BG Mallya, GM at ICF, Chennai ".The Financial Express.9 March 2023.Archivedfrom the original on 6 June 2023.Retrieved1 December2023.
  30. ^"Indian Railways to introduce Vande Bharat Express trains on these routes".Livemint.16 December 2023.Archivedfrom the original on 4 March 2024.Retrieved5 March2024.
  31. ^"First Vande Bharat sleeper train to run in three months in Karnataka: Vaishnaw".The New Indian Express.2 September 2024.Archivedfrom the original on 3 September 2024.Retrieved2 September2024.
  32. ^"Vande Bharat sleeper coaches to be dispatched from Bengaluru's BEML soon".The Financial Express.29 August 2024.Archivedfrom the original on 2 September 2024.Retrieved2 September2024.
  33. ^"'Best in the world': Railway minister Ashwini Vaishnav unveils Vande Bharat sleeper coach in Bengaluru ".The Hindustan Times.1 September 2024.Archivedfrom the original on 1 September 2024.Retrieved2 September2024.
  34. ^RDSO Specification(PDF).Research Design and Standards Organisation(Report).Archived(PDF)from the original on 15 March 2023.Retrieved21 March2023.
  35. ^"Indian Railways enters new league! Swanky 160 kmph engine-less Make in India train is too good; 15 features".The Financial Express.27 March 2018.Archivedfrom the original on 4 March 2023.Retrieved20 May2023.
  36. ^VBE Maintenance Manual Volume II(PDF).Indian Railways(Report).Archived(PDF)from the original on 4 September 2024.Retrieved1 December2023.
  37. ^"New, upgraded Vande Bharat trains to cost about Rs 115 crore: Officials".The Financial Express.28 May 2022.Archivedfrom the original on 7 February 2023.Retrieved20 May2023.
  38. ^"Vande Bharat train gets safety nod, likely to be flagged off on September 30".The Hindustan Times.10 September 2022.Archivedfrom the original on 5 December 2022.Retrieved5 December2022.
  39. ^Gupta, Moushumi Das (23 October 2022)."Hi-tech machines, 9,000+ workforce — inside Integral Coach Factory making Vande Bharat trains".The Print.Archivedfrom the original on 23 October 2022.Retrieved24 October2022.
  40. ^"Vande Bharat Express: A Make in India Success Story"(PDF).Government of India(Press release). 16 January 2023.Archived(PDF)from the original on 11 November 2023.Retrieved13 November2023.
  41. ^"Vande Bharat Express trains running at average speed of 83 kph against permissible limit of 130 kph, reveals RTI reply filed in MP".Free Press Journal.17 April 2023.Archivedfrom the original on 4 September 2024.Retrieved1 December2023.
  42. ^"Passengers from south T.N. to get a new travel experience on Vande Bharat Expres".The Hindu.23 September 2023.Archivedfrom the original on 11 October 2023.Retrieved1 December2023.
  43. ^"New Vande Bharat Express features".The Times of India.9 August 2022.Archivedfrom the original on 7 January 2024.Retrieved1 December2023.
  44. ^"Indian Railways to roll out 'Make in India' 160 kmph self-propelled 'world-class' train sets at half the cost of import!".The Financial Express.20 February 2017.Archivedfrom the original on 20 May 2023.Retrieved20 May2023.
  45. ^"Salient Features of Vande Bharat Express Trains".Government of India(Press release). 2 August 2023.Archivedfrom the original on 7 December 2023.Retrieved24 November2023.
  46. ^"Mumbai-Goa Vande Bharat express flagged off".The Times of India.27 June 2023.Archivedfrom the original on 7 January 2024.Retrieved1 December2023.
  47. ^"PM Narendra Modi to flag off 6 new Vande Bharat trains today; 20-coach Varanasi-Delhi train included".Zee Business.16 September 2024.Retrieved16 September2024.
  48. ^Gupta, Shobit; Anand, Nisha."Vande Bharat Express trains now operational on over 30 routes in India: See full list".The Hindustan Times.Archivedfrom the original on 6 April 2024.Retrieved16 August2024.
  49. ^"Vande Bharat Express Trains".Indiarailinfo.Retrieved17 September2024.
  50. ^Jain, Smriti (24 September 2023)."PM Modi flags off 9 new Vande Bharat Express trains for 11 states; check routes, timetable, stoppages full details".The Times of India.Archivedfrom the original on 4 December 2023.Retrieved1 December2023.
  51. ^Athrady, Ajith (18 December 2023)."PM Modi flags off second Vande Bharat train between Varanasi and Delhi".Deccan Herald.Archivedfrom the original on 4 September 2024.Retrieved31 December2023.
  52. ^"PM Modi flags off 2 new Amrit Bharat, 6 Vande Bharat Express trains during Ayodhya visit; check routes & other details".The Times of India.30 December 2023.ISSN0971-8257.Retrieved31 December2023.
  53. ^"PM Modi flags off 10 new Vande Bharat Express trains today, four existing routes extended – Check full routes, new destinations and more".The Financial Express.12 March 2024.Archivedfrom the original on 4 September 2024.Retrieved12 March2024.
  54. ^Mukhopadhyay, Sounak (12 March 2024)."Watch: PM Modi flags off 10 new Vande Bharat trains".Livemint.Archivedfrom the original on 12 March 2024.Retrieved12 March2024.
  55. ^"PM Modi Flags Off Three New Vande Bharat Express Trains".News18.31 August 2024.Archivedfrom the original on 31 August 2024.Retrieved31 August2024.
  56. ^"Agra Gets Its Third Vande Bharat Train: Check Ticket Price, Stoppages And Other Details Here".India.2 September 2024.Archivedfrom the original on 2 September 2024.Retrieved2 September2024.
  57. ^Athrady, Ajith."PM Modi flags off six Vande Bharat Express trains in poll-bound Jharkhand".Deccan Herald.Retrieved15 September2024.
edit

Media related toVande Bharat Express trainsat Wikimedia Commons