Jump to content

Bombardier Innovia APM 100 C801A

From Wikipedia, the free encyclopedia
Bombardier Innovia APM 100 C801A
A Bombardier Innovia APM 100 C801A train on the Bukit Panjang LRT line
Interior of Empty C801A train.
In service19 November 2014;9 years ago(2014-11-19)– Present
ManufacturerBombardier Transportation(nowAlstom)
Built atWest Mifflin,Pittsburgh,PA,USA
Family nameInnovia
Constructed2014 – 2015
Entered service19 November 2014;9 years ago(2014-11-19)
Number built13 vehicles
Number in service12 vehicles (1 of which is being upgraded)
FormationSingle vehicles (M) that can be coupled to form 2-car trains
Fleet numbers120 – 132
Capacity22 seated; 83 standing
OperatorsSMRT Trains Ltd(SMRT Corporation)
DepotsTen Mile Junction
Lines servedBPLRTBukit Panjang LRT line
Specifications
Car body constructionAluminum
Car length12.8 m (41 ft11+78in)
Width2.8 m (9 ft2+14in)
Height3.4 m (11 ft1+78in)
Doors2 × 2 per car
Maximum speed55 km/h (34 mph) (design)
48 km/h (30 mph) (service)
Weight15 t (15 long tons; 17 short tons)
Traction systemBombardierthyristordrive
Traction motorsBombardier 1460-P4 75 kW (101 hp) DC motor
Acceleration1.0 m/s2(3.3 ft/s2)
Deceleration1.2 m/s2(3.9 ft/s2) (service)
1.3 m/s2(4.3 ft/s2) (emergency)
Electric system(s)600 V 50 Hz 3-phase ACthird rail
Current collector(s)Collector shoe
UIC classificationAA
Safety system(s)ATCunderATOGoA 4 (UTO), with subsystems ofATP,ATS andCBI
Coupling systemBSI
Multiple workingWithin type during regular service
WithC801during maintenance only[3]
Headlight typeCircularLED
Track gauge2,642-millimetre (8 ft 8 in) central guideway withrubber tyres

TheBombardier Innovia APM 100 C801A(APM 100) is the second generation of an automated people mover (APM) train built byBombardier Transportation(nowAlstom) for theBukit Panjang LRT line.These trains are mainly for airport connections and light rail in towns and it is operated by Automatic Train Control (ATC), making it fully automatic and driverless. The use of rubber tyres and ceramic tracks are extremely quiet compared to conventional rail.

This additional batch of trains will increase the capacity of theBukit Panjang LRT lineby 50% by 2014.[4]As of 4 September 2015[citation needed],all train cars are officially on revenue service.

Overview

[edit]

To prevent overcrowding on theBukit Panjang LRT line,13 new trains were purchased, thus increasing the fleet capacity by 50%. The first car was delivered on 15 June 2014 bearing the number 120. It started service on 19 November 2014 and by 4 September 2015, all 13 train cars were on service. However, in March 2019, 2 train cars were sent back to New Jersey, USA for retrofitting works of new signalling equipment. These cars returned to Singapore in April 2021.[5][unreliable source?]The remaining 11 train cars will have theirs done locally once the retrofit is completed for the 2 train cars. On 29 July 2023, the 2 retrofitted train cars have re-entered passenger service.[citation needed]

Design

[edit]

Exterior

[edit]

The C801A trains are cosmetically similar to theC801trains in terms of exterior shape, excluding the ends.

  • C801A trains have circular, bright white LED headlights compared to the C801 trains, which have rectangular, incandescent headlights.
  • Windscreens and windows have a grey tint, unlike the C801 whose windows have a green tint.
  • The trains also have a more streamlined design and are also the first batch of trains to bear SMRT's "Pixel" livery.
  • The trains feature an orange indicator light which illuminates when the doors are open.
  • The trains have automatic windscreen wipers which will activate during wet weather conditions.

Interior

[edit]

The C801A trains are very similar to theC801trains in terms of interior design.

  • C801A trains have red (priority seats) and lime green seats. The arrangement of the seats is the same while C801 is fully turquoise in colour.
  • Ergonomic seats profile, with two priority seats on each end of the cars (indicated in red).
  • Additional handgrips have been installed to encourage people to move towards the centre of the car.
  • The trains also feature a newer Train Travel Information System (TTIS) and a chime that plays before every announcements.
  • As the carriages are closed-end, the train must be stationary and the doors must be open for passengers to move between carriages during 2-car operations.
  • At each end, passengers may be seated and view the scenery when the train is moving.
  • Passengers have the ability to sit on either ends of the car, accommodating more seating space.

Train formation

[edit]

The configuration of a C801A in revenue service is just the one car. With both the motors and the third rail current collectors, the train cars can be coupled up to 2 cars during service.

The car numbers of the trains range from 120 to 132. Individual cars are assigned a three-digit serial number by the rail operatorSMRT Trains.A trainset consists of one motor car, e.g. set 120 is car 120. The first digit is always a 1, while the last two digits identify the car number.

Additional features

[edit]

Notes

[edit]

References

[edit]
  1. ^"Mass transit signalling".Bombardier Transportation.Archivedfrom the original on 16 June 2020.Retrieved16 June2020.
  2. ^"Bombardier Projects in Mass-transit signalling"(PDF).Archived(PDF)from the original on 16 June 2020.Retrieved16 June2020.
  3. ^"Bukit Panjang LRT gets a new train-car!".YouTube.Land Transport Authority.23 June 2014.Archivedfrom the original on 7 August 2021.Retrieved7 August2021.
  4. ^"Bukit Panjang LRT | Projects | Public Transport | Land Transport Authority".www.lta.gov.sg.Archivedfrom the original on 30 December 2015.Retrieved9 January2016.
  5. ^Hunter, Tomato (3 April 2021)."Retrofitted Bukit Panjang Light Rail Vehicle arrives in Singapore".SGTrains.Archivedfrom the original on 3 April 2021.Retrieved3 April2021.