Chengdu East railway station
![]() | |
General information | |
Other names | Chengdu East |
Location | Chenghua District,Chengdu,Sichuan China |
Coordinates | 30°37′52″N104°08′20″E/ 30.6311°N 104.1390°E |
Operated by | |
Line(s) | |
Platforms | 26 (12 island platforms, 2 side platforms) |
Connections | |
Other information | |
Station code |
|
Classification | Top Class station |
![](https://upload.wikimedia.org/wikipedia/commons/thumb/0/0c/Interior_of_Chengdu_East_train_station_Hall_20161122.jpg/300px-Interior_of_Chengdu_East_train_station_Hall_20161122.jpg)
![](https://upload.wikimedia.org/wikipedia/commons/thumb/0/07/CRH380A%E4%BA%8E%E6%88%90%E9%83%BD%E4%B8%9C%E7%AB%99.jpg/300px-CRH380A%E4%BA%8E%E6%88%90%E9%83%BD%E4%B8%9C%E7%AB%99.jpg)
Chengdu EastorChengdudong railway station(simplified Chinese:Thành đô đông trạm;traditional Chinese:Thành đô đông trạm;pinyin:Chéngdū-dōng Zhàn) is arailway stationinChenghua District,Chengdu,the capital ofSichuanprovince, serving theChengdu–Chongqing intercity railway,theChengdu–Guiyang high-speed railway,theDazhou–Chengdu railwayandXi'an–Chengdu high-speed railway.It is connected toChengdu MetroLine 2and Line7.
History[edit]
Construction began on December 29, 2008.[1]
Station structure[edit]
Layout[edit]
Chengdu East Railway Station is divided into two spaces, the station building and outdoor squares, with a total area of about 68 hectares, the station building itself has an area of 108,000 square meters. The main building of the station is divided into five main levels, including an elevated Waiting Hall level (with mezzanine eating areas and shopping), Platform Level (Ground Level), Arrivals Level and two levels ofChengdu Metrolines. Total investment for its construction was set at about 3.83 billion yuan in 2011 when it was put into use. The station exterior design features a fusion of Jinsha and Sanxingdui bronze shape artistic elements of the ancientShuculture. Beneath the outdoor squares, substantial car parking and a bus terminal is housed. Passengers enter the station across the outdoor Square or direct access to the station building from two north-south elevated roads. Ticket offices exist in the top Waiting Hall area and beneath in the Arrivals Hall.
Track layout[edit]
The station has 14 platforms and 26 tracks, all of which are covered. The departures Waiting Hall sits above the platforms, with arrivals descending down to the Arrivals Hall level below the platforms.
Connections[edit]
Chengdu East Railway Station is a terminus of theChengdu–Chongqing Railway,Chengdu–Kunming RailwayandDazhou–Chengdu Railway.
Chengdu Metro[edit]
![]() | ||||||||||||||||
General information | ||||||||||||||||
Location | Chenghua District,Chengdu,Sichuan China | |||||||||||||||
Operated by | Chengdu Metro Limited | |||||||||||||||
Line(s) | Line 2 Line 7 | |||||||||||||||
Platforms | 4 (2island platforms) | |||||||||||||||
History | ||||||||||||||||
Opened | 16 September 2012 | |||||||||||||||
Services | ||||||||||||||||
|
East Chengdu Railway Station(Chinese:Thành đô đông khách trạm) is atransfer stationonLine 2andLine 7of theChengdu Metro.It serves the Chengdu East railway station.[2][3]
Gallery[edit]
-
Concourse
-
Line 2 platform
-
Line 7 platform
See also[edit]
References[edit]
- ^Thành miên nhạc thiết lộ khách vận chuyên tuyến, thiết lộ thành đô đông khách trạm kim thiên khai công: Nhân dân võngArchived2011-02-09 at theWayback Machine(in Chinese)
- ^"Vận hành tuyến lộ đồ".Chengdu Metro. Archived fromthe originalon 22 August 2010.Retrieved11 August2020.
- ^"Operated lines".Chengdu Metro. Archived fromthe originalon 9 January 2021.Retrieved11 August2020.
External links[edit]
Media related toChengdudong Railway Stationat Wikimedia Commons