Jump to content

Energy policy of Pakistan

From Wikipedia, the free encyclopedia
(Redirected fromEnergy in Pakistan)

Mangla Dam.
Development of carbon dioxide emissions

Theenergy policy of Pakistanis formulated and determined by the federal, provincial, and local institutional entities inPakistan,which address the issues of energy production, distribution, and consumption of energy, such as gas mileage and petroleum standards.[1]Energy policyrequires the proper legislation, international treaties,subsidiesand incentives to investment, guidelines forenergy conservation,taxationand other public policy techniques.

Several mandates and proposals have been called over the years to overlook the energy conservation, such asneon signswere banned and the official weekend was extended from one to two days in an attempt to conserve electricity (Gillani,2010)[2]and reducing the electricity load used byindustrial unitsby 25% during peak hours (Aziz,2007),[3]but no comprehensive long-term energy strategies were implemented. Since 1999, many legislative provisions were adopted forenergy conservationincluding the seeking energy from variousrenewable energy sources.There is also an intense criticism about the unequal distribution of energy, the irresponsible usage of energy sources, and the country's new plan which is aimed to raise country'sdependenceon imported oil for power generation to 50% by 2030.[4]After much public criticism, the long-term energy security policy was announced in 2013 through the introduction of equal cutting-edge energy transmission network, minimising financial losses across the energy system and aligning the ministries involved in the energy sector as well as improving the governance of energy sources.[5]

Studies and policy implementation recommended byAEDB,Water ministry(as policy enforcer), theNEPRAregulates the energy sources network as well as determining the financial prices of the usage of energy. Government-specific energy-efficiency incentive programs also play a significant role in the overall energy policy of Pakistan. As of 2013 Prime MinisterNawaz Sharifhas announced a determined and aggressive energy policy to meet the energy challenges and energy management.[5]

Energy authorities and institutions[edit]

History[edit]

In the 1960s, a large civilian energy input and infrastructure was built by thePakistan military,with the financial funds provided by various countries and international monetary sources.[6]In the 1960s, much of the energy was produced by thehydroelectric damsandthermalpower stations. In the 1970s, Pakistan's energy consumption expanded tonuclear powersources with the establishment and commissioning offirstnuclear power station in Karachi. In the 1980s, the dependence on nuclear sources further grew and themilitarycontinued engineering and building the nuclear power infrastructure.

In 1994, Prime MinisterBenazir BhuttoofPakistan Peoples Party(PPP) launched the country's first ever and largestenergy conservationprogram to produce 13,000MWand issues 70 Memorandum of Understandings (MOUs) and Letters of Intent (LOIs) to Independent Power Producers (IPPs).[7]This 1994 energy policy brought a decisive shift in Pakistan's diverse energy sources.[7]In 1994, out of the total installed capacity of 11000 MW, ~60% of energy was produced from thehydroelectricpower sources while nearly ~40% was produced from the thermal and nuclear sources.[7]According to the economic statistics provided by economist,Sartaj Aziz,this mix was reversed from 60:40 to 30:70 in favour of thermal capacity based on imported fuel.[7]Every year, this ratio went down further to 20:80 in winter months as hydropower generation was reduced due to lower water flows in the rivers.[7]

Controversially, the energy policy depended less on renewable energy sources and dependence on imported oil increased that created a permanent fault in country'senergy conservationsystem. By 1995, only 27 IPPs were able to generate ~6,335 MW of electricity.[7]By 1998, the ratio was stabilised by the policies enforced by Prime MinisterNawaz Sharif.In 2001, themilitary governmentled by PresidentPervez Musharrafand Prime MinisterShaukat Aziz,while contributing to the growth of domestic demand for electricity through large-scale provision of bank loans for the purchase of air-conditioners and home appliances (share of domestic energy consumption had jumped to 46% of the total by 2008), did not add any new capacity to the energy system.[7]In 2012 Pakistan's first wind power installation came online at theFFCEL Wind Energy Projectin Jhimpir.[8]

Policy overview[edit]

Energy policy: 2008–10[edit]

In 2005, Prime MinisterShaukat Azizannounced the long-termenergy securityprogram which was aimed to the development of the power infrastructure from all energy sources.[9]This policy relied onprivatisingthe energy sector by international mega energy corporations.[10]Controversially, this program was aimed to raise dependence on imported oil from theArab countriesfor power generation to be increased by 50.1% by 2013.[10]

In 2006, Prime MinisterAzizheld conversation with the officials of theSaudiMinistry of Petroleumand invitedAli Al-Naimito invest in country's energy sector.[11]In 2007, Prime MinisterAzizallocated₨.12.5 billion for power production-related projects which remained unused. In his last policy statement, Prime MinisterAzizfurther called for banning theNeon lights,Neon signs,and to close the market places by 9 pm; such policy enforcement was harshly resisted by the left-wing parties, such asPakistan Peoples Party,Communist Partyand thelabour unions.[12]

Energy Policy: 2010–13[edit]

After thegeneral electionsheld in 2008, the mismanagement and weak policies led to an intense repetitive cycle ofloadsheddingin the country. Responding to a massive demonstration against theloadsheddingand the growing power shortages in the country, Prime Minister,Yousaf Gilaniannounced the "energy policy" on 22 April 2010.[13]

The policy was announced after the Prime Minister,Gilanihad held a three-day national energy conference inIslamabadwith energy experts that discussed the causes of the power crisis inPakistanand possible steps to relieve it.[2]With immediate effect, the gaseousNeon lightsand thesignswere banned and the official weekend was extended from one to two days in an attempt to conserve electricity.[14]Under this policy, several attempts were made byGilani governmenttoprivatisethe energy sector.[15]Devised by the Finance MinisterAbdul Hafeez Shaikh,the programme failed to resolve electricity shortage, which private energy companies failed to maintain and upgrade despite being part of their contract.[15]After much criticism and public demonstration in 2012, thePPPgovernment decided tonationalisedthe energy sector and issued clear directives to regulate the energy corporations to produce the power generations.[16]

Energy Policy: 2013–18[edit]

Musadik Masood Malikwas appointed Federal Minister, Water and Power of the Pakistan Government in May, 2013.[17]Within two months, he was replaced byAbid Sher Aliwho served in the role until the ministry was abolished in September, 2017.[18]In its place aMinistry of Energywas created.Awais Leghariserved as the first energy minister of the country until the end of the government's tenure.[19]

The 2010 amendment to Pakistan's Constitution (para. 3), empowered each province to formulate the policy framework for the development of public and private sector power generation. This has led to the formation of dedicated provincial departments and empowered public sector companies specialized in renewables to foster and execute power projects through public, private and public–private partnership modes using indigenous power resources.[20]

This tenure's energy policy was aimed at aggressively building power generation capacity through early-harvest projects inCPEC.A total of 10,973 MW of power was added by the government during its tenure, mostly via private sector investments.[21]In terms of public sector projects conducted by provincial governments in view of the 2010 amendment, KPK government led with the addition of 1,670 MW to the national grid.[22]It was followed by Sindh and Punjab governments which contributed 935 MW and 580 MW respectively.[23][24]Balochistan government didn't inaugurate any public sector power project during its tenure.[25]

However, despite the massive addition of power to the national grid, glaring issues existed in the power sector. There was no viable overhaul done to the electricity transport infrastructure which lead to episodes of plant tripping and extended blackouts during the summer months.[26]Furthermore, there was still a wide demand and supply gap during high temperature months which led to periodic, planned load-shedding.[27]Finally, the issue ofcircular debtwas still attached to the power sector and reached a record high of Rs. 922 billion in March, 2018.[28]

Strengthen regional cooperation: 2019–present[edit]

At the same time as the construction of theChina-Pakistan Economic Corridor,Pakistan has strengthened energy cooperation with Russia and Central Asian countries and imported electricity from Iran.[29]In early 2024, Pakistan officially approved theIran–Pakistan gas pipeline.[30]

Conservation and consumption[edit]

Due to rising demand and a failing power infrastructure severe electricity shortages have occurred in Pakistan. This has led to widespreadrolling blackoutsthat have paralysed industry and led to protests and rioting.[13]Power outagescan last 6–8 hours a day in the cities and many more in the rural areas.[31]According to Mahnaz Parach of Network for Consumer Protection "Children can't do their homework. Housework doesn't get done, as washing machines and other appliances cannot work. When you go home from work, you have no idea whether there will be electricity at home. Your whole life is disturbed."[32]

Experts have warned of an impending energy crisis since 2006.[33]Speaking at a Seminar 'Fueling the Future: Meeting Pakistan's Energy Needs in the 21st Century' held in Washington, D.C. in June 2006 then energy adviser to the prime minister of Pakistan Mukhtar Ahmed stated that the country was taking steps to address the energy shortage.[34]Pakistan Electric Power Companyestimates that there is a shortage of 6 gigawatts or about 60% of its total generation.[35]One of the main reasons of the shortage is thought to be the failure of past governments to anticipate growth in need and the delay in implementation of projects to increase power production. In addition there is widespread power theft and lack of investment in the existing power grid.[36]

The United States has made improving Pakistan's power infrastructure one of its top priorities.[37]US special envoyRichard Holbrooke,while describing the power situation in Pakistan as "unacceptable," has stated that the US would go to its "absolute limits" to help Pakistan overcome the crisis.[38]

Power sources and electrical energy[edit]

Measures are aimed at cutting consumption by 500megawatts.The official weekend has been extended from one to two days.Neon signsand decorative lights have been banned. Power has been cut to government offices by 50% and air conditioners will only be allowed to be switched on after11 am.Street markets have been asked to close early.[13]Commercial centres except drug stores will be closed at8 pmand wedding celebrations will be limited to three hours. The government will pay off its$1.38 billiondebt to power producers allowing them to pay fuel suppliers.[39]Power supply to Pakistan's commercial capitalKarachiwill be decreased by 300 megawatts to allow fairer distribution of power to the remaining parts of the country.[40]Tube wellswill not be allowed to operate from7 pmto11 pm.[2]The measures will be reviewed on 30 July 2010.[41]

Consumption by computers[edit]

Since the early 1990s, the country has observed the highest growth rate in usage of computers that effect the supply of the electricity produced in the system.[42]In a survey published by theExpress Tribune,around ~30 million citizens (out of180 million), uses the internet on daily basis; the internet penetration in the country has reached 16% as of 2013.[43]

Variations by regions[edit]

In the days following the announcement, traders inLahorerejected the government's decision and kept the markets open after8 pmin defiance of the ban.[44]Shops were kept open in other cities also after8 pm.Kashif Shabbir, president of theRawalpindiChamber of Commerce warned the situation would get worse if authorities used force to implement the decision.[45]There was confusion over implementation of the two-day weekend, and many banks and educational institutions remained open.[46]Commenting on the defiant mood of the traders, an editorial inDawnurged everybody to find middle ground.[47]

Reacting to the decision to curtail power supply to Karachi, the "City of Lights", leaders of various political parties in theProvincial Assembly of Sindhcondemned the decision and some of them called it "a conspiracy to create a law and order situation." FormerNazim of Karachi,Naimatullah Khanwarned that curtailing the power supply of the city could lead to street battles between protesters and law enforcement.[48]

Some analysts have predicted that reduction in the banks' workweek to 5 days will result in revenue losses.[49]

The prevailing energy crisis in Pakistan is taking away 2 percent (or Rs 380 billion) of the economy, despite the government has spent Rs 1.1 trillion as subsidies on the sector in the last four-year which accounts for 2.5 percent of the total volume of economy.[50]

During June 2012, PresidentAsif Ali Zardarihad said that the government realised the enormity of the challenge of energy shortage and was determined to overcome it in the shortest possible time.[51]

International co-operation[edit]

Pakistan is already importing small quantity of electricity fromIranto supply power toGwadartown. Pakistan is also actively considering to import electricity fromIndiaandTajikistan.World Bankoffered to finance for conducting the feasibility study to import 1200 MW power from India.[52][53]

Pakistan is also exploring to importPNGvia pipe line throughWaghaborder from India. India would import the requiredLNGand re-gasified LNG (RLNG) would be pumped through its pipelines up to the border point.[54]Iran–Pakistan gas pipelineis pending for a long time to receive PNG from Iran for the needs of both Pakistan and India.[55]However, due to the sharp deterioration in India-Pakistan relations, the pipeline is currently changed to be used only by Iran and Pakistan. Pakistan is also planning theTurkmenistan–Afghanistan–Pakistan–India pipeline.

Pakistan started importing discountedRussian oilin June 2023 to prevent energy price hikes caused by theeconomic crisis.The 100,000 bpd of Russian oil imported accounts for two-thirds of Pakistan's daily consumption.[56]

See also[edit]

References[edit]

  1. ^Staff (1 August 2013)."CCI approves National Energy Policy".Pakistan Today.Retrieved30 August2013.
  2. ^abc"Steps taken to tackle energy crisis".Geo TV.22 April 2010. Archived fromthe originalon 28 April 2010.Retrieved23 April2010.
  3. ^Staff (12 May 2007)."Shaukat and Jatoi take up energy policy".AAJ News Archives.Archived fromthe originalon 30 June 2017.Retrieved30 August2013.
  4. ^Syed Mohibullah Shah (8 October 2011)."Energized yet powerless".The News International, 2008.Archived fromthe originalon 16 June 2013.Retrieved30 August2013.
  5. ^abBhatti, Sohail (22 July 2013)."Ambitious' national energy policy formulated".Dawn News, 2013.Retrieved30 August2013.
  6. ^"PAKISTAN ARMY".www.pakistanarmy.gov.pk.Retrieved9 April2022.
  7. ^abcdefgAziz, Sartaj (23 April 2013)."Who is responsible?".Pakistan Today, April 2013.Retrieved30 August2013.
  8. ^"50 MW wind power project connected to national grid".nation.com.pk.Retrieved23 April2018.
  9. ^Muralidhar Reddy (8 March 2005)."We will oppose domination of Indian Ocean: Shaukat Aziz".The Hindu.Archived fromthe originalon 4 March 2006.Retrieved18 November2013.
  10. ^abSyed Mohibullah Shah (8 October 2011)."Energised, yet powerless".The News International, 2011.Retrieved18 November2013.
  11. ^APP (7 November 2006)."Saudi investment invited in energy, mining sectors".The Dawn News, areastudies.Retrieved18 November2013.
  12. ^Staff."Traders agree to close markets at 9 pm".Labour Unity Org.Labour Unity Org. Archived fromthe originalon 20 October 2013.Retrieved18 November2013.
  13. ^abc"Pakistan's PM announces energy policy to tackle crisis".BBC. 22 April 2010.Retrieved22 April2010.
  14. ^Tavernise, Sabrina (26 April 2010)."Pakistanis Living on Brink, and Often in the Dark".The New York Times.Retrieved28 April2010.
  15. ^ab"Effects of Power Sector Reforms".Prime Minister's Inspection Commission. 2013. Archived fromthe originalon 14 July 2014.Retrieved3 July2014.
  16. ^Amin, Mohd. Ramiz."Nationalization and Privatization in Pakistan".Nationalization and Privatization in Pakistan. Archived fromthe originalon 11 June 2014.Retrieved3 July2014.
  17. ^"A caretaker minister makes his way into real cabinet".Thenews.com.pk.Retrieved13 February2014.
  18. ^"PML-N's Abid Sher Ali appointed as new state minister for power".The Express Tribune.22 July 2013.
  19. ^"Awais Leghari made Minister of Power Division".Business Recorder.6 October 2017.
  20. ^Asian Development Bank, Access to Clean Energy Investment Program: Summary Sector Assessment: Energy, p.2
  21. ^"PML-N govt added 10,973 MW electricity to system, NA told".Pakistan Today.Retrieved27 May2018.
  22. ^"PTI claims govt only added 1,670 MW to the power grid - The Express Tribune".The Express Tribune.24 March 2018.Retrieved27 May2018.
  23. ^"Sindh contributes 935 MW wind energy in national grid: CM".Pakistan Today.Retrieved27 May2018.
  24. ^"[Initiatives] Energy Department, Govt. of the Punjab, Pakistan".www.energy.punjab.gov.pk.Retrieved27 May2018.
  25. ^Baloch, Sanaullah (29 January 2018)."No energy for Balochistan".The News International.
  26. ^"Parts of Punjab, KP hit by massive power breakdown".Dawn.16 May 2018.Retrieved27 May2018.
  27. ^"Daily Power Position".4 June 2018. Archived fromthe originalon 5 June 2018.Retrieved5 June2018.
  28. ^Kiani, Khaleeq (2 March 2018)."Energy sector circular debt touches record Rs922bn".Dawn.Retrieved27 May2018.
  29. ^Guo, Fei-fei; Huang, Cheng-feng; Wu, Xiao-ling (1 November 2019)."Strategic analysis on the construction of new energy corridor China–Pakistan–Iran–Turkey".Energy Reports.5:828–841.doi:10.1016/j.egyr.2019.06.007.hdl:10419/243631.ISSN2352-4847.
  30. ^Islamuddin, Sajid."Pakistan approves work on long-awaited Iran-Pakistan gas pipeline project".Anadolu Ajansı.Retrieved23 February2024.
  31. ^"Pakistan turns off lights to end energy crisis".Khaleej Times.22 April 2010. Archived fromthe originalon 8 June 2011.Retrieved22 April2010.
  32. ^Shah, Saeed (21 April 2010)."Pakistan to impose wedding curfew as power shortages cause civil unrest".The Guardian.London.Retrieved23 April2010.
  33. ^"Major energy crisis feared".Dawn.29 July 2006. Archived fromthe originalon 9 April 2009.Retrieved24 April2010.
  34. ^"Pakistan needs to tackle energy crisis".Dawn.24 June 2006. Archived fromthe originalon 25 July 2008.Retrieved24 April2010.
  35. ^"Electricity shortfall reaches 6,000 MW".Dawn.18 April 2010.Retrieved23 April2010.
  36. ^"Crisis talks as power shortages hit Pakistan industry".Reuters. 22 April 2010.Retrieved22 April2010.
  37. ^"Pakistan announces measures to save energy".Forbes.22 April 2010. Archived fromthe originalon 3 May 2010.Retrieved22 April2010.
  38. ^"US to help Pakistan tide over energy crisis".Dawn.20 April 2010.Retrieved24 April2010.
  39. ^"Pakistan War on Power Deficit to Shut Offices, Ban Neon Signs".Bloomberg Businessweek.22 April 2010. Archived fromthe originalon 25 April 2010.Retrieved22 April2010.
  40. ^"Gilani vows to reduce load-shedding".Dawn.23 April 2010.Retrieved22 April2010.
  41. ^"Energy conservation strategy announced".The News International.23 April 2010.Retrieved23 April2010.
  42. ^"Computers and its Usage in Pakistan".Pakistan Telecommunications. 3 December 2008.Retrieved3 July2014.
  43. ^websedk (24 June 2013)."30m internet users in Pakistan, half on mobile: Report".Express Tribune.Retrieved3 July2014.
  44. ^"Traders defy order of markets' closure".Dawn.23 April 2010.Retrieved23 April2010.
  45. ^"Traders reject Malik's warning, refuse to close shops at 8 pm".Dawn.24 April 2010.Retrieved24 April2010.
  46. ^"Two holidays: confusion over implementation".The News International.24 April 2010.Retrieved24 April2010.[permanent dead link]
  47. ^"Traders' defiance".Dawn.25 April 2010.Retrieved25 April2010.
  48. ^"Karachi lights being turned off to overcome energy crisis".Dawn.Retrieved24 April2010.
  49. ^"Two-day weekend to hurt banks' earnings".The News International.25 April 2010.Retrieved25 April2010.[permanent dead link]
  50. ^Economic cost of energy crisis estimated at Rs380bn,The News, 1 June 2012
  51. ^Disengagement not an option: President ZardariArchived2 June 2012 at theWayback Machine,Geo News, 1 June 2012
  52. ^"Pakistan all set to import electricity from India"(PDF).2014. Archived fromthe original(PDF)on 30 June 2014.Retrieved17 August2014.
  53. ^"Adani mulls exporting electricity to Pakistan".2014.Retrieved17 August2014.
  54. ^"India, Pakistan may shake hands on electricity, hydrocarbons"(PDF).Archived fromthe original(PDF)on 30 June 2014.Retrieved17 August2014.
  55. ^"India-Pakistan-Iran pipeline remains the most viable option".2014.Retrieved17 August2014.
  56. ^Kugelman, Michael (14 June 2023)."Russian Oil Shipment Arrives in Pakistan".Foreign Policy.Retrieved15 June2023.

External links[edit]