Gaganyaan-1

From Wikipedia, the free encyclopedia
Gaganyaan-1
NamesG1
Mission typeIndian Human Spaceflight Programmetechnology demonstration
OperatorISRO
Spacecraft properties
SpacecraftGaganyaan
ManufacturerHindustan Aeronautics Limited
Start of mission
Launch dateJuly 2024
RocketHLVM3
Launch siteSatish Dhawan Space Centre
ContractorISRO
Orbital parameters
Reference systemGeocentric orbit
RegimeLow Earth orbit

Gaganyaan-1(fromSanskrit:gagana,"celestial" andyāna,"craft, vehicle" ) will be the first uncrewed test flight of theGaganyaanprogramme, with launch planned for July 2024.[1]

Background[edit]

The launch was originally scheduled for December 2020,[2]then in December 2021,[3]but it was delayed due to theCOVID-19 pandemic.[2]The flight plan was finally ready by April 2022[4]and the launch is expected to take place in July 2024,[1]after theTV-D1,TV-D2, TV-D3 and TV-D4.[5]It was proposed in April 2022 that the crew module should be depressurized,[6]something kept in the final planning.[7]

The first orbiter module adaptor assembly (OMA) was supplied by Kineco Kaman Composites on 23 December 2023. The OMA is a conical structure with a diameter of 4 meters, composed ofcarbon-fiber-reinforced polymers.It is combined with the equipment bay shroud and crew escape module.[8]With the successful qualification of the rocket's engines in February 2024,[9]the mission was scheduled to July 2024.[1]

Mission objectives[edit]

TheGaganyaanspacecraft will be launched by aHuman-rated LVM 3fromSatish Dhawan Space Centreand inserted into a 170 x 408 km orbit.[10]The circularisation maneuver will be performed at the third orbit. The landing should follow the same pattern as theTV-D1.[4][11]

After this mission,ISROwill perform four more abort tests before launching Gaganyaan 2,[5]carrying thehumanoid robotVyommitra,[12]which was later decided that it will also fly on G-1.[13]

References[edit]

  1. ^abcDesk, Janam Web (2024-02-28)."Why were the names of Gaganyaan passengers revealed a year before its launch?".janamtv.com.Retrieved2024-02-28.
  2. ^abJones, Andrew (2021-02-23)."India revises Gaganyaan human spaceflight plan, delays Chandrayaan-3".SpaceNews.Retrieved2024-01-06.
  3. ^"First uncrewed mission of Gaganyaan in December: It's race against time for ISRO now".The Hindu.2021-06-28.ISSN0971-751X.Retrieved2024-01-06.
  4. ^abKumar, Chethan (2022-04-28)."First Gaganyaan uncrewed module to be injected in 170x408km orbit; indicates human spaceflight profile".The Times of India.ISSN0971-8257.Retrieved2024-01-06.
  5. ^ab"Chennai: Indian Space Research Organisation to carry out series of tests before launch of Gaganyaan".The Times of India.2022-07-01.ISSN0971-8257.Retrieved2024-01-06.
  6. ^Kumar, Chethan (2022-04-29)."Gaganyaan: First uncrewed mission to have unpressurised crew module".The Times of India.ISSN0971-8257.Retrieved2024-01-06.
  7. ^Marar, Anjali; Dutt, Anonna (2024-02-27)."PM Modi announces 4 astronauts for Gaganyaan: Current status of the mission".The Indian Express.Retrieved2024-02-29.
  8. ^"Pilerne-based Kineco Kaman delivers key component for Isro's human space mission".The Times of India.2023-12-23.ISSN0971-8257.Retrieved2024-02-13.
  9. ^Kumar, Chetan (2024-02-21)."Gaganyaan: Cryo engine qualification for human-rated LVM-3 completed".The Times of India.ISSN0971-8257.Retrieved2024-02-21.
  10. ^Kumar, Chethan (2023-07-15)."Chandrayaan-3 a shot in the arm for Gaganyaan-1".The Times of India.ISSN0971-8257.Retrieved2024-01-06.
  11. ^"Mission Gaganyaan: Better safe than starry".The Economic Times.2022-05-18.ISSN0013-0389.Retrieved2024-01-06.
  12. ^"First trial for Gaganyaan to be done by end of 2023, or beginning of 2024: Jitendra Singh".The Times of India.2022-09-13.ISSN0971-8257.Retrieved2024-01-06.
  13. ^Kuthunur, Sharmila (2024-02-27)."India completes critical test for Gaganyaan flight crewed by humanoid robot later this year".space.com.Retrieved2024-02-28.

Bibliography[edit]