HVDC Three Gorges – Changzhou
Appearance
(Redirected fromHVDC Three Gorges-Changzhou)
HVDC Three Gorges – Changzhou | |
---|---|
Location | |
Country | China |
Coordinates | 30°47′6″N111°31′48″E/ 30.78500°N 111.53000°E 31°30′37″N118°21′11″E/ 31.51028°N 118.35306°E 31°30′02″N118°22′11″E/ 31.50056°N 118.36972°E 31°36′42″N119°59′27″E/ 31.61167°N 119.99083°E |
General direction | north–south |
From | Three Gorges |
To | Changzhou |
Ownership information | |
Owner | China Power Grid Development Co. |
Construction information | |
Manufacturer of substations | ABB |
Commissioned | 2004 |
Technical information | |
Type of current | HVDC |
Total length | 940 km (580 mi) |
Power rating | 3,000 MW |
AC voltage | 500kV |
DC voltage | ±500kV |
No.of poles | 2 |
TheHVDC Three Gorges – Changzhouis an 940-kilometre (580 mi) long bipolarHVDCtransmission line inChinafor the transmission of electric power from theThree Gorgespower plant to the area ofChangzhou.
The transmission line went into service in 2004. It runs from the staticinverter station,Longquan,31 miles (50 km) away from the Three Gorgespower plantto the static inverter plant, Zhengping, near Changzhou. The HVDC Three Gorges-Changzhou is abipolar500kVpowerline with a maximumtransmission power ratingof 3,000megawatts.
A part of the line is theYangtze River Crossing Wuhuover Yangtze River using 229-metre (751 ft) tallpylons.
The electrode at Chujiahu is also used by HVDC Hubei - Shanghai for grounding.
Sites[edit]
Site | Coordinates |
---|---|
Longquan Static Inverter Plant | 30°47′6″N111°31′48″E/ 30.78500°N 111.53000°E |
Chujiahu Electrode | 30°36′26″N111°54′51″E/ 30.60722°N 111.91417°E |
Yangtze Powerline Crossing, Tower North | 31°30′37″N118°21′11″E/ 31.51028°N 118.35306°E |
Yangtze Powerline Crossing, Tower South | 31°30′02″N118°22′11″E/ 31.50056°N 118.36972°E |
Zhengping Electrode | 31°36′12″N119°45′59″E/ 31.60333°N 119.76639°E |
Zhengping Static Inverter Plant | 31°36′42″N119°59′27″E/ 31.61167°N 119.99083°E |