Intercity Express
Overview | |
---|---|
Locale | Germany,Netherlands, Belgium, Austria, Switzerland and France. Formerly Denmark. |
Dates of operation | 1985–present |
Predecessor | SeeHistory |
Technical | |
Track gauge | 1,435 mm(4 ft8+1⁄2in)standard gauge |
Other | |
Website | www |
Intercity Express(commonly known asICE(German pronunciation:[iːtseːˈʔeː] )) is ahigh-speed rail system in Germany.It also serves destinations in Austria, France, Belgium, Switzerland and the Netherlands as part of cross-border services. It is the flagship of the German state railway,Deutsche Bahn.ICE fares are fixed for station-to-station connections, on the grounds that the trains have a higher level of comfort. Travelling at speeds up to 300 km/h (190 mph) within Germany and 320 km/h (200 mph) when in France, they are aimed at business travellers and long-distance commuters and marketed by Deutsche Bahn as an alternative to flights.
TheICE 3also has been the development base for theSiemens Velarofamily of trainsets which has subsequently been exported toRENFEin Spain (AVE Class 103), which are certified to run at speeds up to 350 km/h (220 mph),[1]as well as versions ordered by China for theBeijing–Tianjin intercity railwaylink (CRH 3) and by Russia for the Moscow–Saint Petersburgand Moscow–Nizhny Novgorodroutes (Velaro RUS)[2]with further customers beingEurostaras well asTurkeyandEgypt.
History
[edit]TheDeutsche Bundesbahnstarted a series of trials in 1985 using theInterCityExperimental(also called ICE-V) test train. The IC Experimental was used as a showcase train and for high-speed trials, setting a newworld speed recordat 406.9 km/h (253 mph) on 1 May 1988.[3] The train was retired in 1996 and replaced with a new trial unit, called theICE S.
After extensive discussion between the Bundesbahn and the Ministry of Transport regarding onboard equipment, length and width of the train and the number of trainsets required, a first batch of 41 units was ordered in 1988. The order was extended to 60 units in 1990, withGerman reunificationin mind. However, not all trains could be delivered in time.
The ICE network was officially inaugurated on 29 May 1991 with several vehicles converging on the newly built stationKassel-Wilhelmshöhefrom different directions.[4]
In 2007, aline between Paris and Frankfurt/Stuttgartopened, jointly operated by ICE andSNCF'sTGV.[5][6][7][8]
Equipment
[edit]ICE livery
[edit]A notable characteristic of the ICE trains is their colour design, which has been registered by the DB as anaesthetic modeland hence is protected as intellectual property.[9]The trains are painted inPale Grey(RAL7035) with aTraffic Red(RAL 3020) stripe on the lower part of the vehicle. The continuous black band of windows and their oval door windows differentiate the ICEs from any otherDBtrain.
The ICE 1 and ICE 2 units originally had anOrient Red(RAL 3031) stripe, accompanied by aPastel Violetstripe below (RAL 4009, 26 cm wide). These stripes were repainted with the current Traffic Red between 1998 and 2000, when all ICE units were being checked and repainted in anticipation of theEXPO 2000.
The "ICE" lettering uses the colourAgate Grey(RAL 7038), the frame is painted inQuartz Grey(RAL 7039). The plastic platings in the interior all utilise thePale Grey(RAL 7035) colour tone.
Originally, the ICE 1 interior was designed in pastel tones with an emphasis on mint, following the DB colour scheme of the day. However, ICE 1 trains were refurbished in the mid-2000s and now follow the same design as the ICE 3, which makes heavy usage of indirect lighting and wooden furnishings.
The distinctive ICE design was developed by a team of designers aroundAlexander Neumeisterin the early 1980s and first used on theInterCityExperimental(ICE V). The team around Neumeister then designed the ICE 1, ICE 2, and ICE 3/T/TD. The interior of the trains was designed by Jens Peters working for BPR-Design inStuttgart.Among others, he was responsible for the heightened roof in the restaurant car and the special lighting. The same team also developed the design for the now discontinuedInterRegiotrains in the mid-1980s.
Overview
[edit]Type | Production | Numbers built | vmax[km/h] | In service | Status | Image |
---|---|---|---|---|---|---|
InterCityExperimental(also ICE/V) | 1983–1985 | 1 | 350 | 1985–2000 (measurement and test drives) | retired | |
ICE 1 | 1989–1993 | 60 | 280 | since 1990 | 58 in service | |
ICE 2 | 1995–1997 | 46 | 280 | since 1996 | 43 in service | |
ICE S(also ICE R) | 1996 | 1 | 280 / 330 | since 1997 | in service for measurement and test drives | |
ICE T | 1996–2005 | 71 | 230 | DB:since 1999 ÖBB:2006–2020 |
70 in service | |
DB Class 403(ICE 3) | 1997–2006 | 50 | 330 | since 2000 | 49 in service | |
DB Class 406(ICE 3M / ICE 3MF) | 1997–2006 | 17 | 330 | since 2000 | 16 in service (13 with DB, 3 withNS) | |
Metropolitan | 1998–1999 | 2 | 220 | "ICE" branded:2004–06/2005, 12/2005–2006, 2009–2021 | retired | |
ICE TD | 1998–2000 | 20 | 200 | 2001–2003, 2006–2017 | retired,1 remaining for tests asAdvanced Train Lab | |
Velaro D(DB Class 407, also called ICE 3 by DB) | 2009–2012 | 17 | 320 | since 2013 | all in service | |
ICE 4 | 2014–2023/24 | 137 | 250 / 265 | since 2017 | all in service | |
Velaro MS(DB Class 408 / ICE 3neo)[10] | 2020–2026 (planned) | 22(of 90 ordered) | 320 | since 2022 | 20 in service | |
ICE L | since 2019 | 1+(of 79 on order)[11] | 230 | from late 2024 (planned) | undergoing testing |
First generation
[edit]The first ICE trains were the trainsets ofICE 1(power cars: Class 401), which came into service in 1989. The first regularly scheduled ICE trains ran from 2 June 1991 fromHamburg-AltonaviaHamburg Hbf–Hannover Hbf–Kassel-Wilhelmshöhe–Fulda–Frankfurt Hbf–Mannheim HbfandStuttgart HbftowardMünchen Hbfat hourly intervals[12]on the newICE line 6.TheHanover-Würzburg lineand theMannheim-Stuttgart line,which had both opened the same year, were hence integrated into the ICE network from the very beginning.
Due to the lack of trainsets in 1991 and early 1992, theICE line 4(Bremen Hbf–Hannover Hbf–Kassel-Wilhelmshöhe–Fulda–Würzburg Hbf–Nürnberg Hbf–München Hbf) could not start operating until 1 June 1992. Prior to that date, ICE trainsets were used when available and were integrated in theIntercitynetwork and with IC tariffs.
In 1993, theICE line 6's terminus was moved from Hamburg to Berlin (later, in 1998, via theHanover-Berlin lineand the formerIC line 3fromHamburg-AltonaviaHannover Hbf–Kassel-Wilhelmshöhe–Fulda–Frankfurt Hbf–Mannheim Hbf–Karlsruhe Hbf–Freiburg HbftoBasel SBBwas upgraded to ICE standards as a replacement).
Second generation
[edit]From 1997, the successor, theICE 2trains pulled by Class 402 powerheads, was put into service. One of the goals of the ICE 2 was to improveload balancingby building smaller train units which could be coupled or detached as needed.
These trainsets were used on theICE line 10Berlin-Cologne/Bonn. However, since thedriving van trailersof the trains were still awaiting approval, the DB joined two portions (with one powerhead each) to form a long train, similar to the ICE 1. Only from 24 May 1998 were the ICE 2 units fully equipped with driving van trailers and could be portioned on their run fromHammvia eitherDortmund Hbf–Essen Hbf–Duisburg Hbf–Düsseldorf HbforHagen Hbf–Wuppertal Hbf–Solingen-Ohligs.
In late 1998, theHanover–Berlin high-speed railwaywas opened as the thirdhigh-speed linein Germany, cutting travel time on line 10 (between Berlin and theRuhr valley) by 2½ hours.
The ICE 1 and ICE 2 trains'loading gaugeexceeds that recommended by the international railway organisationUIC.Even though the trains were originally to be used only domestically, some units are licensed to run in Switzerland and Austria. Some ICE 1 units have been equipped with an additional smallerpantographto be able to run on the different Swissoverhead wiregeometry. All ICE 1 and ICE 2 trains are single-voltage15 kV AC,which restricts their radius of operation largely to the German-speaking countries of Europe. ICE 2 trains can run at a top speed of 280 km/h (174 mph).
Third generation
[edit]To overcome the restrictions imposed on the ICE 1 and ICE 2, their successor, the ICE 3, was built to a smallerloading gaugeto permit usability throughout the entire Europeanstandard gaugenetwork, with the sole exception being the UK's domestic railway network. Unlike their predecessors, the ICE 3 units are built not as trains with separate passenger and power cars, but aselectric multiple unitswith underfloor motors throughout. This also reduced the load per axle and enabled the ICE 3 to comply with the pertinentUICstandard.
Initially two different classes were developed: theClass 403(domestic ICE 3) and theClass 406(ICE 3M), the M standing forMehrsystem(multi-system). Later came Class 407 and Class 408. The trains were labelled and marketed as theVelaroby their manufacturer,Siemens.
Just like the ICE 2, the ICE 3 and the ICE 3M were developed as short trains (when compared to an ICE 1), and are able to travel in a system where individual units run on different lines, then being coupled to travel together. Since the ICE 3 trains are the only ones able to run on theKöln-Frankfurt high-speed linewith its 4.0% incline at the allowed maximum speed of 300 km/h, they are used predominantly on services that utilise this line.
In 2009 Deutsche Bahn ordered another 16 units – worth€495 million – for international traffic, especially to France.
TheErfurt–Leipzig/Halle high-speed railway,which opened in December 2015, is one of three lines in Germany (the others being theNuremberg-Ingolstadt high-speed rail lineandCologne–Frankfurt high-speed rail line) that are equipped for a line speed of 300 km/h (190 mph). Since only 3rd generation ICE trains can travel at this speed, theICE line 41,formerly running fromEssen HbfviaDuisburg Hbf–Frankfurt SüdbftoNürnberg Hbf,was extended over theNuremberg-Ingolstadt high-speed rail lineand today the service run isOberhausen Hbf–Duisburg Hbf–Frankfurt Hbf–Nürnberg Hbf–Ingolstadt Hbf–München Hbf.
The ICE 3 runs at speeds up to 320 km/h (200 mph) on theLGV EstrailwayStrasbourg–Parisin France.
A new generation ICE 3,Class 407,is part of the Siemens Velaro family with the model designation Velaro D. It currently runs on many services in Germany and through to other countries like France. Initially this train type was meant to execute the planned Deutsche Bahn services through theChannel Tunnelto London. As the trains had not received a certification for running in Belgium and due to the competition ofbudget airlinesthe London service was cancelled.[13][14]
In 2020 Deutsche Bahn placed an order with Siemens for 30 trains, and options for another 60, of the Velaro design and based on the previously procured ICE Class 407.[15]Referenced by Siemens as Velaro MS ( "multi-system" ), these trains are calledICE 3neoby Deutsche Bahn and classified as 408. The trains are designed for operation at 320 km/h and were deployed at the end of 2022 on routes that use the Cologne – Frankfurt high speed line which is designed for operation at 300 km/h. After a production time of only 12 months including trial runs the first train was presented to journalists in February of 2022. At that occasion the order was increased by 43 trainsets, with all 73 trains supposed to be in service by early 2029.[16]In May of 2023 Deutsche Bahn announced that it was calling the last 17 trains from the option, bringing the total order up to 90 trains.[11]
Fourth generation
[edit]Procurement of ICx trainsets started c. 2008 as replacements for locomotive hauledInterCityandEuroCitytrain services - the scope was later expanded to include replacements forICE 1andICE 2trainsets. In 2011Siemenswas awarded the contract for 130 seven car intercity train replacements, and 90 ten car ICE train replacements, plus further options - the contract for the ten car sets was modified in 2013 to expand the trainset length to twelve vehicles. The nameICxwas used for the trains during the initial stages of the procurement; in late 2015 the trains were rebrandedICE 4,at the unveiling of the first trainset, and given the class designation 412 by Deutsche Bahn.
Two pre-production trainsets were manufactured and used for testing prior to the introduction of the main series.
ICE T and ICE TD
[edit]Simultaneously with the ICE 3, Siemens developed trains withtiltingtechnology, using much of the ICE 3 technical design. The class 411 (seven cars) and 415 (five cars) ICE T EMUs and class 605 ICE TD DMUs (four cars) were built with a similar interior and exterior design. They were specially designed for older railway lines not suitable for high speeds, for example the twisting lines inThuringia.ICE-TD has diesel traction. ICE-T and ICE-TD can be operated jointly, but this is not done routinely.
ICE T
[edit]A total of 60 class 411 and 11 class 415 have been built so far (units built after 2004 belong to the modified second generation ICE-T2 batch). Both classes work reliably. Austria'sÖBBpurchased three units in 2007, operating them jointly with DB. Even though DB assigned the nameICE-Tto class 411/415, theToriginally did not stand fortilting,but forTriebwagen(railcar), as DB's marketing department at first deemed the top speed too low for assignment of the InterCityExpress brand and therefore planned to refer to this class asIC-T(InterCity-Triebwagen). The trainsets of the T series were manufactured in 1999. The tilting system has been provided byFiat Ferroviaria,now part ofAlstom.ICE T trains can run at speeds of up to 230 km/h (143 mph).
ICE TD
[edit]Deutsche Bahn ordered 20 units of ICE-T with diesel engines in 2001, called Class 605 ICE-TD. The ICE-TD was intended for certain routes without electric overhead cables such as Dresden-Munich and Munich-Zürich lines. However, the Class 605 trains (ICE-TD) experienced many technical issues and unanticipated escalation in operating cost due to the diesel fuel being fully taxed in Germany. They were taken off revenue service shortly after delivery. During the2006 FIFA World Cup,the ICE-TD trains were pressed temporarily into supplementary service for transporting fans between cities in Germany.
At the end of 2007, ICE-TD trains were put into revenue service for the lines between Hamburg and Copenhagen as well as Hamburg and Aarhus. A large part of the Danish railway network had not been electrified soDSB (Danish State Railways)used the diesel-powered trains. When DSB ordered the newIC4train sets, the company did not anticipate the long delay with the delivery and the technical issues with the train sets. To compensate for the shortage of available trains, DSB leased the ICE-TD while the delivery and technical issues with IC4 were being addressed. The operating cost was much lower due to the lower fuel tax in Denmark. After the issues with IC4 were resolved, the ICE-TD fleet was removed from revenue service and stored.
Deutsche Bahn retired the entire ICE TD fleet in 2018.[17]
Differences in train layouts
[edit]ICE (generally): | Pale grey livery with red stripe and convoluted rubber gaiters between carriages(distinctive from all other DB trains) Black window band with oval door windows except in ICE 4(distinctive fromIntercity/Metropolitancars) Wheels-on-rails technology(distinctive from theTransrapid) |
| |
ICE 1: | twopower headsand up to 14 intermediate cars;restaurant carwith high roof; nose with DB logo that interrupts red stripe (unique to the ICE 1); maximum speed is 280 km/h (174 mph).[citation needed] |
| |
ICE 2: | one power head and onedriving van traileraccessible to passengers; BordRestaurant/Bistro car has same height as other cars;contrary to ICE 1:nose is vertically divisible, parts of thecouplerprotruding to the outside; maximum speed is 280 km/h (174 mph).[18] |
| |
ICE 3: | no power heads, but anEMU:end cars with rounded windshield and passenger lounge, unpowered transformer car withpantograph;maximum speed of 320 km/h (199 mph)[citation needed];red stripe is interrupted at the end cars by ICE logo, then runs downwards and across the nose lid; window band becomes narrow and ends near the windshield. |
| |
ICE 4: | no power heads, unpowered transformer car withpantograph;maximum speed of 265 km/h (165 mph);[19]no oval door windows; red stripe running downwards and across the nose lid; window band becomes narrow and ends near the windshield. |
| |
ICE T/ICE TD: | similar to ICE 3, except:steeper front; pantograph; maximum speed of 230 km/h (143 mph); no ICE logo on end coaches (ICE T)/ aerodynamic cover on end cars; maximum speed of 200 km/h (124 mph);[20]ICE logo on the left side of the end coaches (ICE TD); red stripe stays straight; red stripe ends near the lamps; windows narrows to a point instead of a flat end as on the ICE 3 |
| |
ICE T2: | like ICE T series 1, except:painted sheet metal instead of glass between windows, front lamps withLEDs |
| |
ICE V: | violet, wide stripe runs deeper than on newer stock and does not continue over the nose lid;Deutsche Bundesbahnlogo and preliminary ICE logo; clad rubber gaiters; power heads larger than intermediate cars and with rounder front; front hedge ICE 2-like since 1995 |
| |
ICE S: | ICE logo with additional letter "S" in white; most have only one intermediate coach; high-voltage lines between carriages; maximum speed is 330 km/h (205 mph)[citation needed] |
Trainset numbers
[edit]While every car in an ICE train has its own unique registration number, the trains usually remain coupled as fixed trainsets for several years. For easier reference, each has been assigned atrainset numberthat is printed over each bogie of every car. These numbers usually correspond with the registration numbers of the powerheads or cab cars.
ICE 1: | Tz 01 to 20 | traction motorsusethyristorfrequency converters |
Tz 51 to 71 | traction motors useGTOfrequency converters | |
Tz 72 to 90 | GTO control, fitted for service into Switzerland | |
| ||
ICE 2: | Tz 201 to 244 | |
| ||
ICE 3: | Tz 301 to 337 | first series |
Tz 351 to 367 | second series | |
| ||
ICE 3M: | Tz 4601 to 4613 | 7 trainsets, numbers intermittent |
Tz 4651 to 4654 | owned byNederlandse Spoorwegen(NS) | |
ICE 3MF: | Tz 4680 to 4684 | refitted for service into France |
ICE 3MF: | Tz 4685 | refitted for service into France, and the United Kingdom via the Channel Tunnel |
| ||
ICE T: | Tz 1101 to 1132 | first series |
7 cars | Tz 1151 to 1178 | second series |
Tz 1180 to 1184 | refitted for service into Switzerland | |
Tz 1190 to 1192 | sold toÖBB | |
| ||
ICE T: | Tz 1501 to 1506 | |
5 cars | Tz 1520 to 1524 | originally fitted for service into Switzerland, cab cars switched with Tz 1180 to 1184 |
| ||
ICE TD: | Tz 5501 to 5520 |
Interior equipment
[edit]The ICE trains adhere to a high standard of technology: all cars are fully air-conditioned and nearly every seat features aheadphonejack which enables the passenger to listen to several on-board music and voice programmes as well as several radio stations. Some seats in the 1st class section (in some trains also in 2nd class) are equipped with video displays showing movies and pre-recorded infotainment programmes. Each train is equipped with special cars that feature in-train repeaters for improvedmobile phonereception as well as designated quiet zones where the use of mobile phones is discouraged. The newer ICE 3 trains also have larger digital displays in all coaches, displaying, among other things, Deutsche Bahn advertising, the predicted arrival time at the next destination and the current speed of the train.
The ICE 1 was originally equipped with a passenger information system based onBTX,however this system was eventually taped over and removed in the later refurbishment. The ICE 3 trains featuretouch screenterminals in some carriages, enabling travellers to print train timetables. The system is also located in the restaurant car of the ICE 2.
The ICE 1 fleet saw a major overhaul between 2005 and 2008, supposed to extend the lifetime of the trains by another 15 to 20 years. Seats and the interior design were adapted to the ICE 3 design, electric sockets were added to every seat, the audio and video entertainment systems were removed and electronic seat reservation indicators were added above the seats. The ICE 2 trains have been undergoing the same procedure since 2010.
ICE 2 trains feature electric sockets at selected seats, ICE 3 and ICE T trains have sockets at nearly every seat.
The ICE 3 and ICE T are similar in their interior design, but the other ICE types differ in their original design. The ICE 1, the ICE 2 and seven-car ICE T (Class 411) are equipped with a full restaurant car. The five-car ICE T (Class 415) and ICE 3 however, have been designed without a restaurant, they feature a bistro coach instead. Since 1 October 2006, smoking is prohibited in the bistro coaches, similar to the restaurant cars, which have always been non-smoking.
All trains feature a toilet for disabled passengers and wheelchair spaces. The ICE 1 and ICE 2 have a special conference compartment whilst the ICE 3 features a compartment suitable for small children. The ICE 3 and ICE T omit the usual train manager's compartment and have an open counter named "ServicePoint" instead.
An electronic display above each seat indicates the locations between which the seat has been reserved. Passengers without reservations are permitted to take seats with a blank display or seats with no reservation on the current section.
Maintenance
[edit]The maintenance schedule of the trains is divided into seven steps:
- Every 4,000 kilometres, an inspection taking about 1½ hours is undertaken. The waste collection tanks are emptied and fresh water tanks are refilled. Acute defects (e.g. malfunctioning doors) are rectified. Safety tests are also conducted. These include checking thepantographpressure, cleaning and checking for fissures in the rooftop insulators, inspecting transformers and checking the pantograph's current collector for wear. The wheels are also checked in this inspection.
- Every 20,000 kilometres, a 2½ hour inspection is conducted, calledNachschau.In this inspection, the brakes, theLinienzugbeeinflussungsystems and the anti-lock brakes are checked.
- After 80,000 kilometres, the train undergoes theInspektionsstufe 1.During the two modules, each lasting eight hours, the brakes receive a thorough check, as well as the air conditioning and the kitchen equipment. The batteries are checked, as well as the seats and the passenger information system.
- Once the train has reached 240,000 kilometres, theInspektionsstufe 2mandates a check of theelectric motors,thebearingsand thedriveshaftsof thebogiesand the couplers. This inspection is usually carried out in two modules taking eight hours each.
- About once a year (when reaching 480,000 km), theInspektionsstufe 3takes place, at three times eight hours each. In addition to the other checkup phases, it includes checks on thepneumaticssystems, and the transformer cooling. Maintenance work is performed inside the passenger compartment.
- The1st Revisionis carried out after 1.2 million km. It includes a thorough check of all components of the train and is carried out in two five-day segments.
- The seventh and final step is the2nd Revision,which happens when reaching 2.4 million kilometres. Thebogiesare exchanged for new ones and many components of the train are disassembled and checked. This step also takes two five-day segments.
Maintenance on the ICE trains is carried out in special ICE workshops located in Basel, Berlin, Cologne, Dortmund, Frankfurt, Hamburg, Leipzig[21]and Munich. The train is worked upon at up to four levels at a time and fault reports are sent to the workshops in advance by the on-board computer system to minimize maintenance time.
Lines in operation
[edit]Line | Section | Stations | Length | Top speed | Opened | Rolling stock | |
---|---|---|---|---|---|---|---|
km | mi | ||||||
Hanover–Würzburg high-speed railway | 327 | 203 | 280 km/h | 1991 | |||
Mannheim–Stuttgart high-speed railway | 99 | 62 | 280 km/h | 9 May 1991 | |||
Karlsruhe–Basel high-speed railway | 182 | 113 | 250 km/h | March 1993 | |||
Hanover–Berlin high-speed railway | 258 | 160 | 250 km/h | 15 September 1998 | |||
Cologne–Frankfurt high-speed rail line | Frankfurt·Frankfurt Airport·Siegburg/Bonn | 180 | 110 | 300 km/h | 30 May 1999 | ||
Cologne–Aachen high-speed railway | Cologne·Köln-Ehrenfeld·Horrem·Aachen Hbf | 70 | 43 | 250 km/h | May 2002 | ||
Nuremberg–Ingolstadt high-speed railway | Nürnberg·Allersberg·Kinding·Ingolstadt | 78 | 48 | 300 km/h | 2 September 2006 | ||
Erfurt–Leipzig/Halle high-speed railway | 123 | 77 | 300 km/h | 9 December 2015 | |||
Nuremberg–Erfurt high-speed railway | 107 | 66 | 300 km/h | 10 December 2017 | |||
Vogelfluglinie | Copenhagen–Ringsted Line | 60 | 200 km/h | 31 May 2019 | |||
Wendlingen–Ulm high-speed railway | Wendlingen·Merklingen·Ulm | 59.575 | 37.018 | 250 km/h | 9 December 2022 |
Lines under construction
[edit]- Stuttgart–Wendlingen high-speed railway(new line, 250 km/h, under construction)
- Vogelfluglinie(partially new line, partially being upgraded)
- Lübeck–Hamburg railway(German part, to be upgraded to reach 200 km/h)
- Lübeck–Puttgarden railway(German part, to be electrified[22]to reach 200 km/h up from the current 160 km/h,[23]under construction)
- Fehmarn Belt Fixed Link(tunnel part, will replace theRødby–Puttgarden ferry,200 km/h, under construction, completion expected in 2028)[24]
- Sydbanen(Danish part, new tracks to be laid by 2021, to be electrified to reach 200 km/h by 2024, under construction)[25]
Lines planned
[edit]- Frankfurt–Mannheim high-speed railway(new line, 300 km/h, in planning)
- Hanau-Gelnhausen high-speed railway(new line, 300 km/h, in planning)
- Dresden‒Prague high-speed line
- Hanover-Bielefeld high-speed railway (new line, 300 km/h, in planning)
- Nuremberg-Würzburg high-speed railway(new line, 300 km/h, in planning)
- Hanover-Hamburg high-speed railway/Hanover-Bremen high-speed railway(Y-shaped, partially new line, 160 and 300 km/h on new sections, 160 km/h on an existing section, in planning)
- Fulda–Eisenach high-speed railway250 km/h 2030 52 km
- Fulda–Frankfurt (parallel new) high-speed railway250 km/h 2035 80 km
- Ostermünchen–Brannenburg–Austrian border high-speed railway
Route planning and network layout
[edit]The ICE system is a polycentric network. Connections are offered in either 30-minute, hourly or bi-hourly intervals. Furthermore, additional services run during peak times, and some services call at lesser stations during off-peak times.
Unlike the FrenchTGVor the JapaneseShinkansensystems, the vehicles, tracks and operations were not designed as an integrated whole; rather, the ICE system has been integrated into Germany's pre-existing system of railway lines instead. One of the effects of this is that the ICE 3 trains can reach a speed of 300 km/h (186 mph) only on some stretches of line and cannot currently reach their maximum allowed speed of 330 km/h on German railway lines (though a speed of 320 km/h is reached by ICE 3 in France).
The line most heavily utilised by ICE trains is theMannheim–Frankfurt railwaybetweenFrankfurtandMannheimdue to the bundling of many ICE lines in that region. When considering all traffic (freight, local and long-distance passenger), the busiest line carrying ICE traffic is theMunich–Augsburg line,carrying about 300 trains per day.
North–south connections
[edit]The network's main backbone consists of six north–south lines:
- fromHamburg-AltonaviaHamburg,Hannover,Kassel,Fulda,Frankfurt,Mannheim,KarlsruheandFreiburgtoBasel(line20) or continuing from Mannheim toStuttgart(line22)
- from Hamburg-Altona and Hamburg and fromBrementoHannover(where portions are joined) and via Kassel, Fulda andWürzburgtoNurembergand viaIngolstadttoMunich(line25)
- from Hamburg-Altona via Hamburg,Berlin-Spandau,Berlin,Berlin Südkreuz,LeipzigorHalle,Erfurtto Nuremberg and via Augsburg or Ingolstadt to Munich (lines18,28and29) or continuing from Erfurt via Fulda, Frankfurt, Stuttgart,Ulmand Augsburg to Munich (line11)
- from Berlin viaBerlin-Spandau,Braunschweig,Kassel, Fulda, Frankfurt, Mannheim, Karlsruhe and Freiburg to Basel (line12) or via Fulda andFrankfurt SüdtoFrankfurt Airport(line13)
- fromAmsterdamorDortmundviaDuisburg,Düsseldorf,Cologneand Frankfurt Airport to Mannheim and either via Karlsruhe and Freiburg to Basel (line43) or via Stuttgart, Ulm and Augsburg to Munich (lines42and47)
- from Essen via Cologne, Frankfurt, Würzburg, Nuremberg and Ingolstadt to Munich (line41)
(Also applies to trains in the opposite directions, taken from 2024 network map)
East–west connections
[edit]Furthermore, the network has three main east–west thoroughfares:
- fromBerlin GesundbrunnenviaBerlin,Hannover,BielefeldtoHamm(where train portions are split) and continuing either viaDortmund,Essen,DuisburgandDüsseldorftoCologne/Bonn Airportor viaHagenandWuppertaltoCologne(10,19)
- fromDresdenviaLeipzig,Erfurt,Fulda,Frankfurt,Frankfurt AirportandMainztoWiesbaden(50)
- fromKarlsruheviaStuttgart,Ulm,andAugsburgtoMunich(60)
(Also applies to trains in the opposite directions, taken from 2023 network map)
German branch lines
[edit]Some train lines extend past the core network and branch off to serve the following connections:
- from Berlin toRostock(line 28, individual services)
- from Berlin toStralsund(line 28, individual services)
- from Hamburg toLübeck(line 25, individual services)
- from Hamburg toKiel(lines 20, 22, 28 and 31, individual services)
- from Bremen toOldenburg(lines 10, 22 and 25, individual services)
- from Leipzig via Hanover to Cologne (line 50, individual services)
- from Leipzig via Kassel to Düsseldorf (line 50, individual services)
- from Würzburg via Kassel to Essen (line 41, individual services)
- from Munich toGarmisch-Partenkirchen(lines 25, 28 and 41, individual services)
- from Nuremberg viaRegensburgtoPassau(line 91,every two hours)
(Also applies to trains in the opposite directions)
ICE Sprinter
[edit]The "ICE Sprinter" trains are trains with fewer stops between Germany's major cities running in the morning and evening hours. They are tailored for business travellers or long-distance commuters and are marketed by DB as an alternative to domestic flights. Some of the Sprinter services continue as normal ICE services after reaching their destination. The service is usually half an hour faster than a standard ICE between the same cities.
A reservation was mandatory on the ICE Sprinter until December 2015.
The first Sprinter service was established betweenMunichandFrankfurtin 1992.Frankfurt-Hamburgfollowed in 1993 andCologne-Hamburg in 1994. This service ran as aMetropolitanservice between December 1996 and December 2004. In 1998, a Berlin-Frankfurt service was introduced and a service between Cologne andStuttgartran between December 2005 and October 2006.
Until December 2006, a morning Sprinter service ran between Frankfurt and Munich (with an intermediate stop atMannheim), taking 3:25 hours for the journey. This has been since replaced by a normal ICE connection taking only 3:21 hours.
Starting with the December 2017 schedule change, a new Sprinter line linksBerlin main stationandMunich main stationin less than four hours.
As of July 2018[update],the individual ICE Sprinter lines are:
(Source: Deutsche Bahn AG[26])
Line segments abroad
[edit]Some ICE trains also run on services abroad – sometimes diverting from their original lines.
- fromFrankfurt HbftoAmsterdam Centraal(Netherlands) viaKöln Hbf,Duisburg HbfandArnhem Centraal(lines 120, 122, 128, 126, 220, 222/121, 123, 127, 129, 221)
- from Frankfurt Hbf toBruxelles-Midi/Brussel-Zuid(Belgium) via Köln Hbf,Aachen HbfandLiège-Guillemins(lines 10, 12, 14, 18, 16, 314, 316/11, 13, 15, 17, 19, 315, 317)
- from Frankfurt Hbf andStuttgart HbftoParis Est(France) viaKarlsruhe HbfandStrasbourg-Ville(lines 9568, 9572, 9574/9563, 9567, 9571, 9573)
- from Frankfurt Hbf to Paris Est viaSaarbrücken Hbf(lines 9550, 9556, 9558/9553, 9555)
- fromHamburg-Altona,Kiel HbfandOstseebad BinztoBasel SBBandZürich HB(Switzerland) via Frankfurt Hbf and Karlsruhe (lines 73, 75, 77, 79, 203, 205/72, 74, 76, 78, 272)
- from Frankfurt Hbf and Hamburg-Altona toChur(Switzerland) via Karlsruhe, Basel SBB and Zürich HB (lines 271, 1271/70)
- from Frankfurt Hbf,Berlin Hbfand Hamburg-Altona station toInterlaken(Switzerland) via Karlsruhe and Basel SBB (lines 275, 373/278, 376)
- from Frankfurt Hbf andDortmund HbftoWien Hbf(Austria) viaNürnberg Hbf,Passau HbfandLinz Hbf(lines 21, 23, 27, 29, 229/20, 22, 26, 28, 228)
- from Hamburg-Altona to Wien Hbf (Austria) via Berlin Hbf, Nürnberg Hbf, Passau Hbf and Linz Hbf (lines 93, 95/92, 94)
- from Dortmund Hbf toInnsbruck Hbf(Austria) viaKöln Hbf,Stuttgart Hbf,Lindau-ReutinandBregenz Hbf(line 119), return schedule terminates atMünster Hbf(line 118)
- fromMünster HbftoKlagenfurt Hbf(Austria) via Köln, Stuttgart,Munich HbfandSalzburg Hbf(line 115), return schedule terminates at Dortmund Hbf (line 114)
- from Berlin Hbf to Innsbruck Hbf (Austria) via Frankfurt, Stuttgart and Munich (line 1211/1218)
- from Amsterdam Centraal (Netherlands) to Basel SBB (Switzerland) via Frankfurt Hbf (line 105/104)
- from Munich to Zürich via Lindau-Reutin (operated by Swiss Federal Railways asEuroCity-Express)
(Also applies to the opposite directions)
Since December 2006,Stuttgart HbfandZürich HBhave been connected by a bi-hourly service. This service however has been replaced by a dailyIntercityservice since March 2010.[27]
TheÖBBin Austria also uses two ICE T trainsets (classified asÖBB Class 4011) betweenWien Hauptbahnhof,Innsbruck HauptbahnhofandBregenz(without stops in Germany), although they do not use tilting technology. Since December 2007 ÖBB and DB offer a bi-hourly connection betweenWien WestbfandFrankfurt Hbf.On 12 December 2021 a newRailjetschedule was introduced by ÖBB betweenFrankfurtandViennaon a different route viaStuttgart,Ulm,Biberach,Friedrichshafen,Lindau,Bregenz andInnsbruck.[28]Since 11 June 2023 a new ICE service is operated by Deutsche Bahn via the same route betweenDortmundand Innsbruck onICE 4trains replacing theIC118/119 service.[29]
Since June 2007 ICE 3M trains had been running betweenFrankfurt HbfandParis EstviaSaarbrückenandKaiserslautern.Together with theTGV-operated service between Paris Est andMünchen HbfviaStuttgart Hbf(TGV 9576/9577), this ICE line was part of the "LGV Est européenne",also called" Paris-Ostfrankreich-Süddeutschland "(orPOS) for short, a pan-European high-speed line between France and Germany. This service now co-exists with a direct TGV service (TGV 9551/9552).
From late 2007, ICE TD trains linkedBerlin HbfwithCopenhagenandAarhusviaHamburg Hbf.These services have been operated since December 2017 by DanishIC3sets asEuroCityservices.
AEuroCity-Expressservice was introduced between Munich and Zürich in December 2020 with the completion of the electrification of the line in Germany, replacing a EuroCity service. Six pairs of trains run every two hours and are operated bySwiss Federal RailwayswithAlstom ETR 610(Astoro) sets.
In addition, ICE Trains toLondonvia theChannel Tunnelare on the horizon.[5][6]Unique safety and security requirements for the tunnel (such as airport-style checks at stations) as well as hold-ups in the production of theVelaro-Dtrains to be used on the route[30]have delayed these plans.
Intra-Swiss ICE trains
[edit]To avoid empty runs or excess waits, several services exist that operate exclusively inside Switzerland:
- three services fromBasel SBBtoInterlaken Ost
- two services fromBasel SBBtoZürich HB
- three service fromInterlaken OsttoBasel SBB
- one service fromInterlaken OsttoBern
- two services fromZürich HBtoBasel SBB
- one service fromBerntoInterlaken Ost
These trains, despite being officially notated as ICEs, are more comparable to a SwissInterRegioorRegioExpresstrain, calling at small stations likeMöhlinorSissach.As common in Switzerland, these trains can be used without paying a supplement.
Travel times
[edit]DBIntercity Expresstravel times betweenmajor stations1, 2 | ||||||||||||||||
Amsterdam | Berlin | Brussels | Cologne | Dortmund | Düsseldorf | Frankfurt | Hamburg | Innsbruck | Munich | Paris | Stuttgart | Vienna | Zürich | |||
Amsterdam Centraal | — | — | 2h 37min | — | 2h 11min | 3h 55min | — | — | — | — | — | — | — | |||
Berlin Hbf4 | — | — | 4h 17min | 3h 25min | 4h 14min | 3h 52min3 | 1h 42min | — | 3h 58min3 | — | 5h 04min | 7h 43min | — | |||
Brussels Midi/Zuid | — | — | 1h 50min | — | — | 3h 05min | — | — | — | — | — | — | — | |||
Cologne/Köln Hbf4 | 2h 37min | 4h 17min | 1h 50min | 1h 10min | 21min | 1h 01min3 | 3h 38min3 | — | 4h 32min | — | 2h 13min | 8h 52min | — | |||
Dortmund Hbf | — | 3h 28min | — | 1h 17min | 49min | 2h 26min3 | 2h 49min | 11h 12min | 5h 35min | — | 3h 29min | 10h 07min | — | |||
Düsseldorf Hbf | 2h 11min | 4h 14min | — | 21min | 48min | 1h 26min | 3h 06min | — | 4h 41min | — | 2h 28min | — | — | |||
Frankfurt (Main) Hbf4 | 3h 55min | 3h 39min3 | 3h 05min | 1h 04min3 | 2h 35min | 1h 26min | 3h 20min3 | — | 3h 09min | 3h 38min3 | 1h 18min3 | 6h 24min | 3h 53min | |||
Hamburg Hbf4 | — | 1h 42min | — | 3h 35min3 | 2h 47min | 3h 06min | 3h 20min3 | — | 5h 31min | — | 4h 59min | — | 7h 35min | |||
Innsbruck Hbf | — | 7h 15min | — | 9h 48min | — | 10h 13min | 5h28min | — | 1h 49min | — | 4h 03min | — | — | |||
München Hbf | — | 3h 55min3 | — | 4h 32min | 5h 28min | 4h 44min | 3h 09min | 5h 31min | 1h 44min5 | 5h 34min | 2h 12min | 3h 56min | 3h 32min5 | |||
ParisGare de l'Est | — | — | — | — | — | — | 3h 47min3 | — | — | 5h 34min | 3h 09min | — | — | |||
Stuttgart Hbf | — | 5h 04min | — | 2h 13min | 3h 25min | 2h 28min | 1h 17min3 | 4h 59min | 6h 17min | 2h 12min | 3h 09min | — | — | |||
Vienna/Wien Hbf | — | 7h 40min | — | 8h 50min | 10h 06min | — | 6h 21min | — | — | — | — | — | — | |||
Zürich HB | — | 8h 39min | — | — | — | — | 3h 53min | 7h 35min | — | 3h 32min5 | — | — | — | |||
1German category 1 stationsand comparableinternational destinationsof 250.000 passengers per day or more |
Accidents
[edit]There have been several accidents involving ICE trains. The Eschede disaster was the only accident with fatalities inside the train, but other accidents have resulted in major damage to the trainsets involved.
Eschede disaster
[edit]The ICE accident nearEschedethat happened on 3 June 1998 was a severerailway accident.Trainset 51, travelling as ICE 884Wilhelm Conrad Röntgenfrom Munich to Hamburg, derailed at 200 km/h (124 mph), killing 101 people and injuring 88. It remains the world's worst high-speed rail disaster.
The cause of the accident was a wheel rim which broke and damaged the train six kilometres south of the accident site. The wheel rim penetrated the carriage floor and lifted the check rail of a set ofpointsclose to Eschede station. This guide rail also penetrated the floor of the car, becoming embedded in the vehicle and lifting the nearby wheels off the rails. One of the now-derailed wheels struck the points lever of the following set of points to change direction, and the rear cars of the trainset were diverted to a different track. They hit the pillars of a street overpass, which then collapsed onto the tracks. Only three cars and the front powerhead passed under the bridge, the rest of the 14-car train jack-knifed into the collapsed bridge.
Other accidents
[edit]On 27 September 2001, trainset 5509 fell off a work platform at theHofmaintenance facility and was written off.
On 22 November 2001, powerhead401 020caught fire. The train was stopped at the station inOffenbach am Mainnear Frankfurt a.M. No passengers were harmed, but the fire caused the powerhead to be written off.
On 6 January 2004, ICE TD trainset 1106 caught fire while it was parked atLeipzig.Two cars were written off, and the others are now used as spares.
On 1 April 2004, trainset 321 collided with atractorthat had fallen onto the track at a tunnel entrance nearIstein,and was derailed. No-one was injured. Trainset 321 was temporarily taken apart, its cars being switched with cars from other ICE 3 trainsets.
Powerhead401 553suffered major damage in a collision with a car on theMannheim–Frankfurt railwayin April 2006.
On 28 April 2006, trainset 73 collided head-on with twoBLS Re 465locomotives atThunin Switzerland. The driver of the Swiss locomotives was unfamiliar with the new layout of the station, which had been recently changed. He did not see a shunting signal ordering him to stop. The locomotives automatically engaged the emergency brakes when he passed the signal, but came to a stop on the same track as the approaching ICE. The ICE was travelling at a speed of 74 km/h. The emergency brake slowed the train to 56 km/h at the point of collision. 30 passengers and the driver of the ICE suffered minor injuries, the driver of the Swiss locomotives having jumped to safety. Both trains suffered major damage. The powerhead401 573had to be rebuilt using components from three damaged powerheads (401 573,401 020and401 551).
On 1 March 2008, trainset 1192, travelling as ICE 23, collided with a tree which had fallen onto the track nearBrühlafter being blown down byCyclone Emma.The driver suffered severe injuries. The trainset is back in service, its driving-car having been replaced with that from trainset 1106.
On 26 April 2008, trainset 11, travelling as ICE 885, collided with a herd of sheep on theHanover-Würzburg high-speed rail linenearFulda.Both powerheads and ten of the 12 cars derailed. The train came to a stop 1300 metres into theLandrückentunnel.19 of the 130 passengers suffered mostly minor injuries, four of them needing hospital treatment.[31]
A cracked axle was blamed for a low-speed derailment of a third-generation ICE in Cologne in July 2008. The accident, in which no-one was hurt, caused DB to recall its newest ICEs as a safety measure.[32]In October 2008, the company recalled its ICE-T trains after a further crack was found.[33]
On 17 April 2010, ICE 105 Amsterdam - Basel lost a door while travelling at high speed nearMontabaur.The door slammed into the side of ICE 612 on the adjacent track. Six people travelling on ICE 612 were injured.[34]
On 17 August 2010, the ICE from Frankfurt to Paris hit a truck that had slid from an embankment on to the rail nearLambrecht.The first two carriages derailed and ten people were injured, one seriously.[35]
On 11 January 2011, trainset 4654 partly derailed during a side-on collision with a freight train nearZevenaarin the Netherlands.[36]There were no injuries.
On 2 May 2017, a trainset was derailed atDortmund Hauptbahnhof.Two people were injured.[37]
On 12 October 2018, two cars of a trainset caught fire while it was traveling from Cologne to Munich on theCologne-Frankfurt line.Five people suffered minor injuries during the evacuation.[38]
Fare structure
[edit]Germany
[edit]ICE trains are the highest category (Class A) trains in the fare system of the Deutsche Bahn. Their fares are not calculated on a fixed per-kilometre table as with other trains, but instead have fixed prices for station-to-station connections, depending on a multitude of factors including the railway line category and the general demand on the line. Even on lines where the ICE is not faster than an ordinaryICorECtrain (for example Hamburg to Dortmund), an additional surcharge will be levied on the ground that the ICE trains have a higher comfort level than IC/EC trains.
Austria
[edit]On the intra-Austrian lines (Vienna-Innsbruck-Bregenz, Vienna-Salzburg(-Munich), Vienna-Passau(-Hamburg) and Innsbruck-Kufstein(-Berlin)) no additional fees are charged.[39]
Switzerland
[edit]Likewise, the trains running to and fromZürich,InterlakenandChur,as well as those on the intra-Swiss ICE trains (see above) can be used without any surcharge.
Netherlands
[edit]On ICE trains betweenAmsterdamand Cologne, passengers travelling nationally within the Netherlands (betweenAmsterdam CentraalandArnhem Centraal) can use the nationalOV-chipkaartscheme but have to purchase a supplement.[40]Passengers travelling into/from Germany have to buy an international ticket.
France
[edit]On ICE trains betweenParis Estand Frankfurt or Stuttgart, only the fare system fromSNCF Voyageursis used for national trips toForbachandStrasbourg.Reservation is compulsory for trips to/from and within France.
Scale models
[edit]Various ICE train scale models in several scales have been produced byMärklin,Fleischmann[41][non-primary source needed],Roco[42][non-primary source needed],Trix,Mehano,PIKO.[43][non-primary source needed]and Lima[44][non-primary source needed].
Possible future service to London
[edit]In January 2010, the European railway network was opened to a liberalisation intended to allow greater competition.[45]BothAir France-KLMandDeutsche Bahnhave indicated their desire to take advantage of the new laws to run new services via theChannel Tunneland theHigh Speed 1route that terminates at London St Pancras International.[46][47][48][49][50]
A test run of an ICE train through the Channel Tunnel took place on 19 October 2010.[51][52]Passenger-carrying ICE trains, however, will have to meet safety requirements in order to transit the Channel Tunnel. Although the requirement for splittable trains was lifted, concerns remain over the shorter length of ICE trainsets,[note 1][52]fire safety,[note 2][51]and the ICE'sdistributed powerarrangements. There have been suggestions that French interests have advocated stringent enforcement to delay a competitor on the route.[53]Eurostar also recently choseSiemens Velaro-based rolling stock; there were concerns thatAlstom(builders of the passenger trains that already use the Tunnel) and the French Government would take the matter to court.[52]In October 2010, the French transport minister suggested that theEuropean Railway Agency(based in France) should arbitrate.[54]After safety rule changes which might permit the use of Siemens Velaro rolling stock, the French government dismissed their delegate to theChannel Tunnel Safety Authority,and brought in a replacement.[55][56]
In March 2011, a European Rail Agency report authorized trains with distributed traction for use in the Channel Tunnel. This means that the ICE class 407 trains which DB intends to use for its London services will be able to run through the tunnel. In February 2014, however, Deutsche Bahn announced further difficulties with launching the route, and reports make it seem unlikely that service will start anytime this decade.[57]
In June 2018, Deutsche Bahn announced that it was shelving plans to revive a potential London-Frankfurt ICE connection. The service would take around 5 hours and could rival airlines and become the first competitor for Eurostar.[58]
Ridership
[edit]Year | million riders | ±% p.a. |
---|---|---|
1991 | 5.1 | — |
1992 | 10.2 | +100.00% |
1993 | 14.6 | +43.14% |
1994 | 21.3 | +45.89% |
1995 | 27.2 | +27.70% |
2000 | 41.6 | +8.87% |
2005 | 66.8 | +9.94% |
2010 | 77.8 | +3.10% |
2015 | 80 | +0.56% |
2018 | 94 | +5.52% |
2019 | 99.2 | +5.53% |
Source:[59][60] |
From its inception in July 1991 to 2006, ICE has transported roughly 550 million passengers, including 67 million in 2005.[61]The cumulative sum of passengers is roughly 1.25 billion in 2015.[60]
Legacy
[edit]On 5 October 2006, theDeutsche Post AGreleased a series of stamps, among them a stamp picturing an ICE 3, at 55+25 euro cents.[citation needed]
In 2006,Legomodelled one of itstrain setsafter the ICE.[62]A Railworks add on is available for Train Simulator 2018 accurately reflecting the original 1991 version of the ICE on German tracks (Siegen to Hagen).[63]There is also an addon utilising the Munich - Augsburg line using ICE 3 trainsets.[64]The ICE 3 can also be used in Career scenarios on the Mannheim-Karlsruhe route (including the extension to Frankfurt), and Cologne-Düsseldorf. The ICE T, ICE 2, and ICE TD are also available for purchase as separate vehicles.
See also
[edit]- List of Intercity-Express lines
- List of Intercity-Express railway stations
- Train categories in Europe
- Acela
- AVE
- YHT
Notes
[edit]- ^ICE is too short to ensure sufficient proximity to tunnel emergency exits, but DB claims that a Tunnel safety exercise on 18 October 2010 had been "highly successful".
- ^The current Velaro ICE3MF sets would not meet the specialized fire safety requirements for the carriage of passengers through the Channel Tunnel, but the futureSiemens VelaroICE-3D sets (due to enter service in later 2010) include the necessary additional fire-proofing.
References
[edit]- ^"International breakthrough for Siemens high-speed train technology"(Press release). Siemens. 3 April 2001. Archived fromthe originalon 16 October 2006.Retrieved12 February2007.
- ^Новый международный успех высокоскоростных поездов "Сименс"(Press release) (in Russian). Siemens. 19 March 2006. Archived fromthe originalon 27 September 2007.Retrieved12 February2007.
- ^Peter Jehle; René Naumann; Rainer Schach (2006).Transrapid und Rad-Schiene-Hochgeschwindigkeitsbahn: Ein gesamtheitlicher Systemvergleich(in German). Springer. p. 20.ISBN3-540-28334-X.
- ^"Die neuen Wohlfahrtsmarken"(in German). Caritasverband Stuttgart e. V. Archived fromthe originalon 4 February 2007.Retrieved12 February2007.
- ^abDeutsche Bahn.Planned highspeed service from London to Amsterdam and FrankfurtArchived10 August 2011 at theWayback Machine
- ^ab"Germany's Frankfurt-London high-speed rail link put on ice".Reuters. 18 February 2014.Retrieved22 July2015.
- ^"Premiernfahrt nach Paris"(in German). Deutsche Bahn. Archived fromthe originalon 10 July 2007.Retrieved6 December2007.
- ^Die Bahn am Ball(in German). Deutsche Bahn. 2006. p. 96.
- ^Wolfgang Maaßen."Frei von Rechten Dritter..."(in German). Bund Freischaffender Foto-Designer e. V. Archived fromthe originalon 26 May 2012.Retrieved13 February2007.
- ^André Werske(11 Jan. 2021):ICE 3neo – Velaro D Hochgeschwindigkeitszug in Deutschland,retrieved 11 Oct. 2021
- ^ab"Deutsche Bahn orders 73 ICE trainsets".Railway Gazette.17 May 2023.Retrieved31 July2023.
- ^Loppow, Bernd (31 May 1991)."Im Zug der Zeit"[In the train of the times].Die Zeit(in German). Hamburg.Retrieved6 April2013.
- ^Stane, Jon (17 June 2018)."Plans for UK-Germany high speed rail services shelved due to 'significantly changed economic environment'".The Independent.Retrieved1 February2022.
- ^DB confirms London services not likely for many years, if ever. In: Today's railways Europe. Nr. 272, 2018, ISSN 1354-2753, p. 9.
- ^"Deutsche Bahn orders 320 km/h Velaro derivatives".Railway Gazette.15 July 2020.Retrieved1 February2022..
- ^"DB orders more ICE3neo sets as first unit is unveiled".Railway Gazette.1 February 2022.Retrieved1 February2022.
- ^"Deutsche Bahn schickt Diesel-ICE endgültig in Rente".MDR Sachsen(in German). 29 September 2017.
- ^hochgeschwindigkeitszuege.com - ICE 2 der Baureihe 402(German) retrieved 28 June 2015
- ^"Der ICE 4: das Rückgrat der DB-Fernverkehrsflotte".deutschebahn.com(in German).Retrieved8 January2023.
- ^hochgeschwindigkeitszuege.com - ICE-TDretrieved 28 June 2015
- ^"Neues ICE-Instandhaltungswerk in Leipzig in Betrieb"(in German). mdr.Retrieved10 December2009.[permanent dead link]
- ^Denis Bowers (15 June 2018)."Danish parliament approves DKr 11bn rolling stock purchase".International Railway Journal.Retrieved26 June2020.
- ^Gernot Knödler (18 June 2020)."Klatsche für Fehmarnbelt-Querung".Die Tageszeitung(in German).Retrieved26 June2020.
- ^David Burroughs (7 February 2020)."Fehmarnbelt Fixed Link rail consultancy contract awarded".International Railway Journal.Retrieved26 June2020.
- ^"Faser i arbejdet"(in Danish).Banedanmark.22 May 2017.Retrieved26 June2020.
- ^"ICE Sprinter, long-distance services".Deutsche Bahn AG.Archived fromthe originalon 10 February 2007.Retrieved2 June2018.
- ^Messner, Wolfgang; Petersen, Michael (4 October 2012)."Gäubahn erfüllt Hoffnungen nicht".stuttgarter-zeitung.de.Retrieved8 June2016.
- ^"Ein 'Railjet' auf der Schwäbischen Eisenbahn: Biberach und Oberschwaben erhalten neue Fernverkehrsverbindung nach Frankfurt und Wien".7 October 2021.Retrieved11 October2021.
- ^"ICE hält ab Juni in Friedrichshafen und Lindau".www.schwaebische.de.21 April 2023.Retrieved3 May2023.
- ^Webb, Alex (8 December 2011)."Deutsche Bahn London Route Delayed to 2015 as Trains Held Up".Bloomberg.New York.
- ^Wecowi.orgArchived1 June 2008 at theWayback Machine,ICE-Unfall bei Fulda (map)
- ^Schmid, Barbara; Dohmen, Frank (11 July 2008)."Prosecutors Open Investigation into Derailed Train".Der Spiegel.Hamburg.
- ^"Deutsche Bahn to Recall Part of High-Speed Train Fleet".Deutsche Welle.24 October 2008.
- ^"ICE verliert Tür bei voller Fahrt".Der Spiegel.17 April 2010.Retrieved31 July2013.
- ^"Lambrecht – Charedi Man Amongst Rescued in Germany's High Speed Train Crash".Vos Iz Neias?.New York. 17 August 2010.Retrieved18 August2010.
- ^"2 trains collide in the Netherlands".Chicago Sun-Times.Associated Press. 11 January 2011. Archived fromthe originalon 29 June 2013.Retrieved14 November2012.
- ^"High speed train derails in Dortmund, disrupting travel for days".Stockholm: The Local Europe Ab. 2 May 2017.Retrieved3 May2017.
- ^"Fire on German high-speed train forces evacuation".dw.com.Deutsche Welle. 12 October 2018.Retrieved27 July2022.
- ^"ÖBB Intercity-Express".ÖBB.Retrieved12 December2021.
- ^"ICE supplement | Individual tickets".ns.nl.Retrieved12 December2021.
- ^(in German)Fleischmann.deArchived10 August 2009 at theWayback Machine,Fleischmann H0 range
- ^(in German)Roco.ccArchived6 July 2011 at theWayback Machine,Roco ICE 1
- ^Piko.de,Piko ICE 3
- ^HornbyInternational.com[permanent dead link],Lima ICE T
- ^"EU agrees to liberalise rail by 2010".Euractiv.Archived fromthe originalon 11 December 2008.Retrieved11 May2009.
- ^Savage, Michael (11 September 2008)."Air France to launch 'quicker' train to Paris as Eurostar monopoly ends".redorbit.com.London: The Independent.Retrieved11 May2009.
- ^"£5.2 billion state aid plan to make Eurostar profitable"(PDF).Railway Herald.Scunthorpe. 1 June 2009. p. 3.Retrieved28 January2012.[permanent dead link]
- ^Murray, Dick (19 December 2007)."German rival for Eurostar".London Evening Standard.Archived fromthe originalon 5 June 2011.Retrieved7 February2010.
- ^"Deutsche Bahn gets access to Channel Tunnel".Deutsche Welle.16 December 2009.Retrieved22 December2009.
- ^"Deutsche Bahn gets green light for Eurotunnel use".Asia One.Singapore. AFP. 16 December 2009. Archived fromthe originalon 22 December 2009.Retrieved22 December2009.
- ^ab"Deutsche Bahn to run ICE3 to Britain this year".Railway Gazette International.London. 29 July 2010. Archived fromthe originalon 1 December 2020.Retrieved21 August2010.
- ^abc"Chunnel trains safety dispute 'is moving to courts'".RailNews.Stevenage. 20 October 2010.Retrieved20 October2010.
- ^Wright, Robert (20 October 2010)."Alstom heads for court over Eurostar trains".Financial Times.London. Archived fromthe originalon 10 December 2022.Retrieved20 October2010.
- ^"Bussereau wants Channel Tunnel dispute to go to arbitration".International Railway Journal.London. 30 October 2010. Archived fromthe originalon 1 November 2010.Retrieved30 October2010.
- ^"Eurostar train procurement row heads for court".International Railway Journal.30 October 2010. Archived fromthe originalon 29 October 2010.Retrieved30 October2010.
- ^"French Tunnel Adviser Loses Job After Dispute Over German Trains, FT Says".Bloomberg.New York. 21 October 2010.Retrieved30 October2010.
- ^Fender, Keith (19 February 2014)."DB puts London - Frankfurt plans on ice".The Independent.Retrieved6 January2020.
- ^Stone, Jon (16 June 2018)."Plans for UK-Germany high speed rail services shelved due to 'significantly changed economic environment'".Independent.co.uk.
- ^"KTX vs tân càn tuyến triệt để bỉ giác".Whhh.fc2web.com. Archived fromthe originalon 9 October 2019.Retrieved12 October2015.
- ^ab"Press Pictures".siemens.com.
- ^"15 Jahre Hochgeschwindigkeit - Auslastung".Archived fromthe originalon 18 May 2011.Retrieved14 September2010.
- ^"LEGO Store – Passenger Train".LEGO. Archived fromthe originalon 26 May 2007.Retrieved12 February2007.
- ^"RailWorks 3 Intercity-Express Add-On".Railwords. Archived fromthe originalon 14 June 2012.Retrieved7 June2012.
- ^"Train Simulator: Munich-Augsburg Route Add-On on Steam".store.steampowered.com.
External links
[edit]Media related toICE(category) at Wikimedia Commons
- Official website
- Network mapsArchived12 June 2016 at theWayback Machineon the official website ofDeutsche Bahn
- The ICE Pageson Railfaneurope.net
- High-speed trains
- Intercity Express
- Electric multiple units of Germany
- Deutsche Bahn
- High-speed trains of Germany
- High-speed rail in Germany
- Rail transport in Europe
- Siemens products
- Siemens multiple units
- Train-related introductions in 1985
- Railteam
- High-speed trains of Austria
- High-speed rail in Belgium
- High-speed rail in Denmark
- High-speed rail in France
- High-speed rail in Switzerland
- High-speed rail in the United Kingdom
- Rail transport brands
- Passenger trains running at least at 250 km/h in commercial operations