Jump to content

KL Monorail

From Wikipedia, the free encyclopedia

KL Monorail Line
A 4 car monorail train approachingBukit Nanas Monorail station(at far left)
Overview
Native nameLaluan Monorel KL
StatusOperational
OwnerPrasarana Malaysia
Line number8(light green)
LocaleKuala Lumpur
Termini
Stations11
Websitemyrapid.com.my
Service
TypeStraddle-beam single-rail trackmonorail
SystemRapid KL (brand)Rapid KL
ServicesKL Sentral Monorail-Titiwangsa
Operator(s)Rapid Rail
Depot(s)Brickfields
Rolling stockScomi SUTRA(4-car)
Daily ridership50,661 (2023)
71,623 (Q4 2014; Highest)[1]
Ridership18 million (mid 2023)
25.437 million (2013; Highest)[2][1]
History
Opened31 August 2003;20 years ago(2003-08-31)
Technical
Line length8.6 km (5.3 mi)
CharacterElevated
Electrification750 V DCthird rail
Operating speed60 km/h (37 mph)
Route map

MR11
Titiwangsa
MR10
Chow Kit
MR9
Medan Tuanku
KJ12
Dang Wangi
MR8
Bukit Nanas
MR7
Raja Chulan
KG18A
Pavilion Kuala Lumpur-
Bukit Bintang
MR6
Bukit Bintang
MR5
Imbi
MR4
BBCC-Hang Tuah
AG9
SP9
MR3
Maharajalela
MR2
Tun Sambanthan
Monorail depot
KG15
Muzium Negara
MR1
KL SentralKTM ETS

Interchange stations

integratedpaid area
single fare trip
non-integratedpaid area
multiple fare trips
interchange within same building
or cross-platform interchange

TheKL Monorail Lineis the only operationalmonorailsystem inMalaysia.Operated as part of theRapid KLsystem byRapid Rail,a subsidiary ofPrasarana Malaysia,it is one of the components of theKlang Valley Integrated Transit System.The line is numbered 8 and coloured light green on official transit maps.

Due to improperinfrastructure planningand the inadequate size of therolling stock(to transport a large number of passengers in or out of thedowntownKuala Lumpur area duringrush hour), the KL Monorail is commonly cited as the most unsatisfactory rail line of the Klang Valley Integrated Transit System.[3][4]

History[edit]

This urban monorail line was opened on 31 August 2003, with 11 stations running 8.6 km (5.3 mi) on two parallel elevated tracks. It connects theKL Sentraltransport hub in the south andTitiwangsain the north with the "Golden Triangle", a commercial, shopping, and entertainment area consisting of theBukit Bintangarea, and surrounded byJalan Imbi,Jalan Bukit Bintang,Jalan Sultan Ismail,andJalan Raja Chulan.[5]

The monorail scheme was announced byKuala Lumpur City Hallin January 1990 after the Malaysian Government gave the go-ahead to the scheme at a cabinet meeting in June 1989. Its cost was then estimated at RM 143 million. The 14 km (8.7 mi), 22-station system is designed to carry more than 34,000 passengers a day on a 20-minute loop through Kuala Lumpur's bustling commercial core. The plan is to build it in two phases: in the first, 16 stations will be serviced over 7.7 km (4.8 mi); and in the later stage, another 6.5 km (4.0 mi) loop will be added. The first phase was expected to be completed within two years.[6]

According to plans dating back to the 1990s, the planned line was to have two branches (similar to theAmpang and Sri Petaling Lines), with one branch going viaMaharajalelastation and then on to the city centre, and the other branch going toMid Valley,Abdullah Hukum,Jalan Klang Lamaand ending at Kampung Pasir, which will probably include integration withKTM Komuter'sPort Klang LineatPetalingorPantai Dalamstations.KL SentralandTun Sambanthanwere planned to be the common stations.[7][8]Ultimately only the downtown branch was built, due to the1997 Asian financial crisis.

While another plan from Kuala Lumpur People-Mover Rapid Transit (PRT), under the "Kuala Lumpur Linear City" development plan, depicts that the project will include building 16 kilometres of twin track monorail guideway beams, 20 elevated stations, two depots and 14 monorail trains. There will be two phases to the project's construction. Between Jalan Tun Razak and Brickfields, Section 1 will span approximately 8 kilometres, while Section 2 would connect Tun Sambanthan and KL Sentral Station via a 12-stop shuttle service. Section 2, which is unfinished and spans 8 km, begins in Brickfields and travels via Kampung Abdullah Hukum, Lembah Pantai, Pantai Dalam, Taman Desa, OUG, and finally ends at Kampung Pasir. KL PRT Sdn Bhd would oversee the project management while carrying out the PRT transport system's construction, upkeep, and operation during the course of a 30-year concession. The PRT system planned to accommodate up to 18,000 passengers per hour per direction (pphpd) with 168 seats in each train and 630 passengers per train at a headway of up to two minutes between trains. The first section of the project, which runs between P. Ramlee Station and Hang Tuah Station, was supposed to be finished in time for trial runs during the Commonwealth Games in September 1998. Construction on the project started in December 1996 and Sections 1 and 2 were scheduled to be finished in early 1999 and 2000 respectively.[9]

Work was scheduled to begin in June 1990, but was postponed to May 1991 after the city's mayor complained that tenders submitted for preparatory work were too high. There has been no activity on the project since and few details are available on how the project is expected to proceed. The main contractor is a local company, BNK, which had little success in its search for backers to finance its share of the venture. Part of its problem in securing money stems from the project's escalating cost estimates, and part from its lack of a track record in handling such huge projects.[6]

Construction was re-initiated byHitachi, Ltd.,but the1997 Asian financial crisisled to cessation of work in December 1997. When work was resumed in July 1998,MTrans Holdingstook over, locally manufacturing its own rolling stock and completing the project to save cost;[10]the line was completed at a cost of MYR 1.18 billion.

As the line was opened in 2003, it was agreed that the parent company and owner of the KL Monorail Line, KL Monorail System Sdn Bhd (KLMS) under its parent company KL Infrastructure Group (KL Infra), would hold a 40-year concession to operate the monorail.[11]The line and number of stations remains unchanged since 2003. Based on 1999 transit map, Originally KL monorail line have 19 stations, start from Titiwangsa, Chow Kit, Wawasan, P. Ramlee, Raja Chulan, Bukit Bintang, Imbi, Hang Tuah, Merdeka, Sultan Sulaiman (cancelled), Tun Sambanthan, subsequently unbuild line from Syed Putra, Taman Seputeh, Abdullah Hukum, Lembah Pantai, Pantai Dalam, Taman Desa, OUG and Kampung Pasir.[12]

Since the start of operations, the KL Infrastructure Group suffered losses due largely todepreciationandinterestrepayment costs.[13]For the financial year to 30 April 2004, KL Infra posted a net loss of MYR 46.24 million on a MYR 15.08 million revenue.[14]KL Infra had also taken up a MYR 300 million Malaysian government loan and a MYR 260 million infrastructure loan from the Bank Pembangunan Malaysia Berhad (BPMB) (The development bank of Malaysia) (Malay:Bank Pembangunan Malaysia,BPM).[citation needed]In addition, KL Infra had proposed to buy MTrans' three subsidiary companies to improve its business, but failed afterScomibought up some of the targeted companies.[13]

Government takeover[edit]

In April 2007, talks were under way between KL Infra and the government and the Bank Pembangunan Malaysia Berhad to sell the KL Monorail Line to thePrasarana Malaysia,which then had already owned both theKelana Jaya Lineand theAmpang Line,as well as 10% of KL Infra shares. KL Infra was cited as intending to exit Malaysia's monorail business. The takeover is part of the government's master plan to improve the urban public transport sector.[13][15]

SPN gave its agreement in principle to the takeover on 22 December 2006 and a follow-up meeting was held on 6 February 2007 with the government on the takeover of its operational assets and assumption of loan liabilities.[citation needed]A due diligence audit was conducted from 5 March 2007 to 27 April 2007 by consultants appointed by the government. Following agreement to the takeover, BPM granted KL Monorail an extension until 29 April 2007 for an interest repayment amounting to MYR 4,244,801.91, which was originally due on 29 December 2006.[16]

However, the takeover seemed to have suffered a setback at least from the perspective of KL Infra when on 26 March 2007, it was notified by BPM that it was not going to entertain any further extensions for interest repayment. Subsequently on 27 April 2007, the bank notified that it would not be granting anymoratoriumon interest repayments. On 29 April 2007, KL Monorail was not able to make the repayment of the interest instalment which had become due.[16]

On 3 May 2007, KL Monorail was issued a default notice by BPM which sought repayment of the entire principal sum of MYR 609,616,423.73 and capitalised interest of MYR 296,428,910.88 totalling MYR 906,045,334.61. The company was granted seven days from that day to repay the entire sum, which it failed to do.[citation needed]On 14 May 2007, Mohd Anwar Bin Yahya and Cho Choo Meng were appointed receivers and managers by Amanah Raya, the Security Trustee for BPM. Nevertheless, the takeover process is still deemed ongoing, KL Infra stating that it will continue to engage the government and BPM to address the proposed takeover of KL Monorail by Prasarana based on earlier discussions and an approval in principle.[17]

One of the effects of the appointment of receivers and managers is the possibility that KL Infra will not be receiving any compensation for KL Monorail should the takeover by SPN go through.[18]

The trading of KL Infra was suspended from 15 May 2007.[19]On the same day, KL Infra's board announced to Bursa Malaysia that it had formed the opinion that it was not solvent and would not be able to pay all its debts in full within a period not exceeding twelve months.[20]On 28 November 2007,Prasarana Malaysiasigned a sale-and-purchase agreement with KL Monorail Systems, effectively making Prasarana the operator of KL Monorail, and resulting in Prasarana taking over the MYR 882 million BPM loan.[citation needed]

List of stations[edit]

KL Monorail dynamic route map display

The line consists of a singledual-way linethat links areas of inner Kuala Lumpur not served by rail transport, namelyBrickfields,Bukit Bintang,andChow Kit,with existingLRT,MRT,ERLandKTM Komuterstations atKL Sentral,Muzium Negara,Hang Tuah,Bukit Bintang,Bukit Nanas,Medan TuankuandTitiwangsa.The twoterminiare on asingle trackwith aSpanish solutionlayout.

The stations are designed as elevated structures with ticketing facilities on either the ground level (as seen in the KL Sentral station) or the first-floor level. The platforms are on the top floor, separated from the monorail lines by fencing. They were originally covered by large canvas roofs, which were replaced in 2014 by aluminium zinc roofs.[21]Certain stations are situated above roadways, or are slightly longer than others. Each station used to be designated with a sponsor, with route maps associating each station with a particular product brand.

Thedepotis betweenKL SentralandTun Sambanthan.

Station Code Station Name Image Platform type Interchange/Notes
MR1 KL Sentral Terminus (Spanish solution) Southern terminus.

Accessed viaNU Sentralshopping mall if coming from KL Sentral (main terminal building).

Connecting station(requires exiting the station'spaid area) to:

MR2 Tun Sambanthan Side Exit toMethodist College Kuala Lumpur(MCKL) andBrickfields.
MR3 Maharajalela
Exit toMerdeka 118.
MR4 BBCC–Hang Tuah Interchange stationtoAG9SP9LRT Ampang and Sri Petaling Lines.

Exit to LaLaport andBukit Bintang City Centre(BBCC) via the transit hub.

MR5 Imbi Exit toBerjaya Times Squarevia an elevated walkway.
MR6 Bukit Bintang Connecting station,without-paid area integration, toKG18AMRT Kajang Line.

Pedestrian access toKJ10KLCCon theLRT Kelana Jaya Linevia an elevated walkway fromPavilion Kuala Lumpur.

Exit toLot 10andSungei Wang Plazavia elevated walkways.

MR7 Raja Chulan Pedestrian access toKJ10KLCCon theLRT Kelana Jaya Linevia an elevated walkway fromPavilion Kuala Lumpur.
MR8 Bukit Nanas

Connecting station,without paid-area integration, toKJ12Dang Wangion theLRT Kelana Jaya Line.

MR9 Medan Tuanku Pedestrian access toAG5SP5Sultan Ismailon theLRT Ampang and Sri Petaling Linesvia 580 meter elevated walkway.

Exit toQuill City Mallvia an elevated walkway.

MR10 Chow Kit Exit toChow Kitdistrict andHospital Kuala Lumpur.
MR11 Titiwangsa Terminus (Spanish solution) Northern terminus.

Interchange stationtoAG3SP3PY17LRT Ampang Line,LRT Sri Petaling LineandMRT Putrajaya Line.

Proposed interchange withCC08MRT Circle Line.

Map
Location of KL Monorail

Expansion[edit]

To some extent, the line has been designed to accommodate future expansion.[citation needed]While some stations are significantly longer than the current two-car sets, providing room for longer train sets, extension works for other stations have been necessary. An expansion project known as the KL Monorail Fleet Expansion project is being carried out by Prasarana to ensure a more efficient and user-friendly monorail services in the future. The installation of thePlatform Automatic Gate System (PAGS)is one such work under the project.[citation needed]This gate system is necessary to improve passenger safety as before this, there are no barriers between the passenger platforms and the tracks and this may pose dangers to the users. The project also includes the installation of a new signalling system, construction of a new depot to accommodate larger train sets, and other station upgrades and universal access facilities.

An example of station upgrades is atBukit Bintangstation. Touted as one of the busiest stations of the line due to its proximity toBukit Bintang,[citation needed]the hub of shopping and entertainment in Kuala Lumpur, it used to have only one exit, but the upgrading project now provided the station with added an alternative entrance and exit walkway and a direct entry to the Lot 10 and Sungei Wang Plaza shopping complexes. The monorail station is also equipped with new ticket vending machines and ticketing gates.[citation needed]Other than that, escalators and lifts as well as a new Customer Service Office are also provided. Another example is at the second busiest monorail station,Kuala Lumpur Sentralstation, where the Nu Sentral Mall overhead bridge becomes the new entrance to the station.[citation needed]Previously, monorail users needed to exit KL Sentral and cross the busy main thoroughfare inBrickfieldsto reach the station. The completion of the overhead bridge now enables customers to travel between KL Sentral and the monorail station safely and conveniently.[22][23][24]

The main goal of the fleet expansion project is, however, the introduction of new, state-of-the-art four-car trains. Two four-car trains have been introduced to the public while the rest will be delivered in stages until the fourth quarter of 2015. The new four-car trains can accommodate up to 430 passengers per trip and could significantly reduce the waiting time for passengers.[25]They are also more comfortable and spacious than the prevoious two-car trains. After all sets of four-car trains have been delivered and commissioned, the two-car sets, which have been in operation since 2003, would be retired. Besides having a larger capacity, the new trains are also fitted with better safety features including open-door windows, on-boardclosed-circuit televisioncameras and "run-flat" features, which allow the trains to continue moving in the event of a puncture.[26][25]

Rolling stock[edit]

Former 2-carALWEGrolling stock
4-carScomi SUTRArolling stock
The interior of KL Monorail Scomi SUTRA car

The first trains used on the KL Monorail line were 10 sets permanently coupled two-car trains of a similar design to theSeattle Center Monorail'sALWEGtrains.[10]Each monorail train can accommodate 158 passengers during regular operations. The monorail carriages themselves were constructed byScomi Rail,a Malaysian monorail manufacturer,[10]at the Scomi Rail plant inRawang,which also featured its own tracks for monorail train tests.[27]In June 2017, the monorail was operated solely using 6 sets two-car trains. The remaining two-car trains had been fully decommissioned by end of 2022.

KL Monorail subsequently began upgrading its rolling stock to brand-new, four-car trains.[28]These were also manufactured by Scomi, this time to the company's in-house-developedSUTRAdesign, which was also ordered by theMumbai Monorailline in India. Each of these trains can accommodate 430 passengers per trip, compared with 213 passengers for the two-car trains.[28]The new trains are equipped with four closed-circuit television cameras and space for wheelchairs and strollers.[28]

The first two sets four-car trains entered service in December 2014, with the remaining units scheduled to be arriving in stages. While they were initially all scheduled to be in operation by the end of 2015,[28]only five have been delivered so far. They were taken out of service in May 2017 due to safety reasons.[29]Three of the four-car trains have been reinstated in August 2019, with two more expected to re-enter service in November of the same year. In 2019 KL monorail service is operated using five sets 4-car trains and four sets 2-car trains.[30]Once delivery of the remaining 7 sets of four-car trains is complete, the original ALWEG two-car trains will be decommissioned.[28]

Ridership[edit]

The monthly ridership increased from 341,850 passengers in September 2003 to 1.18 million passengers in August 2004. In January 2007, the monorail attained its 50 millionth passenger since its opening. On 29 July 2009, the monorail reportedly reached the 100 million passenger mark.

KL Monorail Ridership[31][32]
Year Month/Quarter Ridership Annual Ridership Note
2024 Q1 4,890,264 9,663,039
Q2 4,772,775
Q3
Q4
2023 Q1 4,099,687 18,107,573
Q2 4,271,287
Q3 4,628,078
Q4 5,108,521
2022 Q1 2,431,760 11,496,524
Q2 2,434,132
Q3 3,125,274
Q4 3,505,358
2021 Q1 1,167,491 4,226,329
Q2 968,990
Q3 591,448
Q4 1,498,400
2020 Q1 2,928,823 7,143,534
Q2 774,603
Q3 2,021,544
Q4 1,418,564
2019 12,573,738
2018 12,594,377
2017 16,841,630
2016 24,200,299
2015 25,067,866
2014 24,303,465
2013 25,437,621
2012 24,435,931
2011 24,200,299
2010 22,108,308
2009 21,021,390
2008 21,765,233
2007 20,142,772
2006 17,370,337
2005 14,482,575
2004 10,956,675
2003 2,917,065 September—December 2003

Accident and incidents[edit]

David Chelliah accident[edit]

Prior to the opening, on 16 August 2002 an accident occurred during a test run involving a 13.4 kg (30 lb) safety wheel falling off a train and hitting the head of a pedestrian walking under the monorail viaduct at Jalan Sultan Ismail. The victim, David Chelliah, a journalist, suffered injuries that required hospitalisation.

On 7 March 2003, Chelliah filed a MYR 5 million negligence suit against the companies involved in the design, installation and operation of the trains, as well as the Director-General of Railways.[33][34]On 8 April 2003, the High Court ruled that the Monorail company was liable for the incident, but not the Director-General of Railways. Although the monorail company reported that any such accident was "unlikely" as six bolts would have to be removed for it to occur and furthermore, a check of all 23 other safety wheels on the train involved did not turn up any other issues, the high court judgement ruled that the monorail company "failed to provide a reasonable explanation as to how the safety wheel had come off the train and instead relied on the possibility that there had been tampering by unknown persons".[35][36]

As a result of this accident, the launch of the monorail was postponed.

Burst tyre incident[edit]

On 22 January 2005, a pneumatic load tyre suddenly burst and caused two women passengers to be injured. The train, carrying about 30 passengers, was about to move from Chow Kit station to Titiwangsa station when the incident occurred at about 8.50pm. The burst tyre caused a rubber sidewall panel to flip open which then hit the side of a passenger seat and injured a woman's legs and another woman's hands. Train services were suspended for about 30 minutes following the incident.[37]

Breakdown[edit]

On 11 August 2012, a train stalled near Tun Sambanthan in Brickfields. The breakdown caused 183 passengers to be trapped for about two hours. The air conditioning system in the carriage stopped functioning when the power supply was cut. As a result, some passengers had to break the windows to allow air in while awaiting rescue. Fire and Rescue Department personnel later used a skylift to rescue passengers trapped in the carriage.[38]Investigation revealed that the issue was due to a power supply disruption at the circuit breaker, causing the auxiliary power system to fail.[39]

Six days later, another breakdown occurred. A train stalled between Imbi and Bukit Bintang for about 30 minutes, trapping around 200 passengers. This time however, there was power in the train and the air-conditioning system was functional. Train services resumed after half an hour.[39]

Titiwangsa station fire[edit]

On 30 March 2015, a monorail service was temporarily delayed when a tyre of a two-car train coach caught fire at the Titiwangsa Station. The scene was recovered hours later.[40]

Maharajalela station fire[edit]

On 24 December 2020, around 7.30am, when a KL Monorail train bound for KL Sentral was approaching the Maharajalela station, one of its tires burst and caught fire. There's no injuries/casualties in the accident, but the Scomi's 4-car train set 24 has been seriously damaged.

Tyre fire[edit]

On 19 December 2023, a coach guide tyre caught fire and fell from the coach onto the road underneath. The incident happened near Titiwangsa Station. The train was halted and passengers evacuated while the fire brigade dealt with the fire. There were no casualties.[41]

Tree collapsed nearby monorail tracks[edit]

On 7 May 2024, a 50-year old tree near Concorde Hotel Kuala Lumpur collapsed on Jalan Sultan Ismail, hitting 17 vehicles and the nearby monorail tracks, causing one death and 1 injured.[42]The monorail service was disrupted, with temporary suspension of stations between KL Sentral and Medan Tuanku stations for cleaning and repair of the tracks. Normal services resumed at 5.00 pm the next day.

Proposed extension[edit]

References[edit]

  1. ^abMing, Ong Kian (5 October 2017)."Public transport ridership falling, despite the billions spent".Malaysiakini.Retrieved17 March2023.
  2. ^"Statistik Tahunan Pengangkutan"(PDF).Retrieved17 March2023.
  3. ^"8 painful things only KL monorail users will understand".The Rakyat Post.7 November 2019.Retrieved19 April2023.
  4. ^"KL Monorail may have other roles to play".The Malaysian Reserve.9 July 2019.Retrieved19 April2023.
  5. ^"RapidKL Monorail".Official Portal Visit Kuala Lumpur.Tourism Unit, Kuala Lumpur City Hall.Retrieved21 September2019.[dead link]
  6. ^abDoug, Tsuruoka (26 September 1991). "Off the Rails: Kuala Lumpur's Monorail Project Becomes Bogged Down".Far Eastern Economic Review.
  7. ^"KLTransit".Retrieved6 March2017.
  8. ^"Transit System Map (1998)".Retrieved16 January2018.
  9. ^https://www.researchgate.net/publication/315836442_AN_LRT-BUS_STRATEGY_FOR_GREATER_KUALA_LUMPUR_WHAT_FUTURE_INTEGRATION_1
  10. ^abc"Monorails of Asia - Kuala Lumpur, Malaysia".The Monorail Society.Retrieved2 September2014.
  11. ^"KL Infrastructure Group".10 April 2005. Archived fromthe originalon 10 April 2005.Retrieved14 July2023.
  12. ^Azliana Ahmad (1999).Peranan Sistem Transit Aliran Ringan (STAR) dalam mengatasi masalah pengangkutan awam di bandar Kuala Lumpur(in Malay). Universiti Malaya: Jabatan Antropologi dan Sosiologi, Fakulti Sastera dan Sains Sosial, Universiti Malaya, 1998/99. pp. Lampiran 2.
  13. ^abc"KLIG in talks to exit monorail business".New Straits Times(Business Times).Kuala Lumpur. 25 April 2007.Retrieved25 April2007.[dead link]
  14. ^Abu Bakar, Dalila (24 September 2004)."MTrans upbeat on mass transit project in W. Asia".New Straits Times(Business Times).Kuala Lumpur. Archived fromthe originalon 13 February 2007.Retrieved2 September2014.
  15. ^"Syarikat Prasarana Negara in talks to take over KL monorail".The Edge.Kuala Lumpur. 24 April 2007. Archived fromthe originalon 27 April 2007.Retrieved25 April2007.
  16. ^ab"Bursa Malaysia General Announcement: Default in Payment Pursuant to Practice Note No. 1/2001 of the Listing Requirements of Bursa Malaysia Securities Berhad".30 April 2007. Archived fromthe originalon 7 February 2012.
  17. ^"Bursa Malaysia General Announcement: Appointment of Receivers and Managers for KL Monorail System Sdn Bhd (KLMS)".14 May 2007. Archived fromthe originalon 4 March 2016.
  18. ^Lim Ai Leen (21 May 2007)."Corporate: Puzzle over bank's move on KL Monorail".The Edge.Kuala Lumpur. Archived fromthe originalon 28 September 2007.Retrieved23 May2007.
  19. ^"Bursa Malaysia General Announcement: KL Infra - Suspension of trading".15 May 2007. Archived fromthe originalon 3 March 2016.
  20. ^"Bursa Malaysia Announcement: Default in Payment Pursuant to Practice Note No. 1/2001 of the Listing Requirements of Bursa Malaysia Securities Berhad".15 May 2007. Archived fromthe originalon 3 March 2016.
  21. ^Prasarana:First Pair Of New 4-Car Monorail In Operations In Third Quarter 2014Archived28 May 2014 at theWayback Machine[sic]; Malaysia Industry-Government group for High Technology; 9 April 2014. URL last accessed 3 December 2014.
  22. ^"First Look: Nu Sentral Mall at KL Sentral, Brickfields Review".Venusbuzz.com.1 April 2014. Archived fromthe originalon 21 February 2015.Retrieved15 March2015.
  23. ^"New Wing Of Bukit Bintang Monorail Station Opens Today"(Press release). MyRapid. Archived fromthe originalon 9 January 2015.Retrieved15 March2015.
  24. ^"Kosmo! Online - Terkini".Kosmo.com.my.20 September 2014. Archived fromthe originalon 21 February 2015.Retrieved15 March2015.
  25. ^ab"Passengers Give Thumbs Up For New Four-Car Train"(Press release). MyRapid. 2 April 2015. Archived fromthe originalon 2 April 2015.Retrieved16 July2023.
  26. ^Nair, Vijenthi (16 August 2014)."New four-car monorail trains operating from next month".The Star.Kuala Lumpur.Retrieved15 March2015.
  27. ^"Kuala Lumpur Monorail - a Photo Essay (page 1/13)".The Monorail Society. Archived fromthe originalon 8 March 2007.Retrieved25 April2007.
  28. ^abcde"Four-car trains make debut".New Straits Times.Kuala Lumpur. 22 December 2014.Retrieved22 December2014.
  29. ^Mahpar, M. Hafidz (8 June 2017)."Monorail trains built for Prasarana are 'fit for operation' - Scomi".The Star.Kuala Lumpur.Retrieved27 June2017.
  30. ^Loheswar, R. (20 August 2019)."KL monorail rolls out four-carriage trains on 16th anniversary".Malay Mail.Kuala Lumpur.
  31. ^"Prasarana's Ridership".14 January 2023. Archived from the original on 14 January 2023.Retrieved14 January2023.{{cite web}}:CS1 maint: bot: original URL status unknown (link)
  32. ^"Statistic of Rail Transport".Ministry of Transport (Malaysia).Archivedfrom the original on 9 January 2022.Retrieved12 February2022.
  33. ^"Long-drawn monorail case to be decided on 8 April".Archived fromthe originalon 5 April 2009.Retrieved30 July2009.
  34. ^"David Chelliah vs Monorail Malaysia Technology Sdn Bhd".Archived fromthe originalon 5 May 2006.Retrieved30 July2009.
  35. ^"Bernama journalist to be awarded damages".The Star.Kuala Lumpur. 9 March 2009. Archived fromthe originalon 10 May 2017.Retrieved2 September2014.
  36. ^Raj, Reena."Chelliah finally wins it".Malaysian Bar Council. Archived fromthe originalon 20 December 2012.Retrieved2 September2014.
  37. ^"Burst tyre cause of monorail explosion"(PDF).Archived fromthe original(PDF)on 7 December 2008.Retrieved30 July2009.
  38. ^http://www.thesundaily.my/news/461509[dead link]
  39. ^abLiyana Mokhtar, Ily."KL monorail stalls again".New Straits Times.Kuala Lumpur. Archived fromthe originalon 21 August 2012.Retrieved2 September2014.
  40. ^"Fire reported at Titiwangsa monorail".Archived fromthe originalon 8 December 2015.
  41. ^Zack, Justin (19 December 2023)."Monorail guide tyre catches fire near Titiwangsa station".The Star.Kuala Lumpur.Retrieved19 December2023.
  42. ^"One dead, another injured as tree falls in KL city centre".The Star.Kuala Lumpur. 7 May 2024.Retrieved7 May2024.

External links[edit]

Route maps[edit]