Jump to content

Kim Chuan Depot

From Wikipedia, the free encyclopedia

Kim Chuan Depot
Location
Location11 Kim Chuan Road, Singapore 537065
Coordinates1°20′27.97″N103°53′14.15″E/ 1.3411028°N 103.8872639°E/1.3411028; 103.8872639
Characteristics
OwnerLand Transport Authority
OperatorSMRT Trains Ltd(SMRT Corporation)
TypeUnderground
RoadsKim Chuan Road, Upper Paya Lebar Road
Rolling stockAlstom Metropolis C830
Alstom Metropolis C830C
Alstom Metropolis C851E(Future)
Routes servedCCLCircle line
History
Opened4 March 2009;15 years ago(2009-03-04)

Kim Chuan Depotis atrain depotfor theMass Rapid Transitsystem inSingapore.The depot is constructed fully underground and provides maintenance, stabling and operational facilities for theCircle line.It is located inHougang,along Upper Paya Lebar Road, and is accessible via Kim Chuan Road.

It used to be the first depot in Singapore to serve two independently operated MRT lines, until the adjacentTai Seng Facility Building,became operational with the revenue operation of theDowntown lineStage 3 on 21 October 2017.[1]

History

[edit]

To facilitate the construction of the depot, part of the Kim Chuan Village was acquired in September 2000 for the construction of the depot and the road viaduct. The Kim Chuan Road was permanently closed from Hougang Avenue 3 to Kim Chuan Drive on 27 June 2002. On 25 October 2002, part of the Hougang Avenue 3 was realigned and on 25 November 2002, part of the Kim Chuan Road was closed.

The project costS$297 million to construct and 2.1 million cubic metres of soil had to be excavated for its construction. Touted as the world's biggest underground depot, it officially opened on 4 March 2009, employing 300 staff members.[2]

The depot was used for the temporary storage and light maintenance of rolling stock for theDowntown line,before the completion of theTai Seng Facility Building.It also provided a route in which Downtown line trains can be towed from the depot to its operational line via the Circle line tracks. Once the main depot,Gali Batu Depotwas completed with stage 2 of the Downtown line, Kim Chuan Depot simply provides a route for newly delivered Downtown line trains to be transferred in to theTai Seng Facility Building.

Design

[edit]

The depot has a capacity to stable 70 trains and covers an area of more than 100,000 square metres (1,076,391 sq ft), reaching a depth of up to 24 metres (78 ft 9 in) at some points. Specifically, the main depot floor is 800 metres (2,624 ft 8 in) in length, 160 metres (524 ft 11 in) in width, and 23 metres (75 ft 6 in) in height.[3]The facility contains the main operation control centre for theCircle line,maintenance facility, stabling areas, and ancillary facilities such as the train wash and workshops. It also houses an automatic storage and retrieval system, a warehouse that stores spare parts for the rolling stocks and other equipments. The depot is connected to the adjacentTai Seng Facility Buildingon the east side of the facility and is operated in tandem with the Tai Seng Maintenance Facility.[4]

The depot is accessible via an administration building along Kim Chuan Road, containing offices, a warehouse, a canteen and a 66 kilovolt substation is located above the depot. The remaining 3 hectares (7.4 acres) of land left empty will be used for light industrial use with buildings on it up to 9 storeys high.

The depot is located betweenTai Seng stationandBartley stationon the Circle line and has 4 reception tracks: 2 tracks clockwise-bound towards Tai Seng station and 2 tracks anticlockwise-bound towards Bartley station.

Extension

[edit]
Construction site of the extension.

On 29 October 2015,LTAannounced the extension of Kim Chuan depot in tandem with the Circle line stage 6 extension. The extension called for the depot to be expanded underground to almost double its land area and stabling capacity from 70 to 133 trains. The integrated depot will also house 550 buses on the plot of land above the underground train depot.[5][6]

The Contract 821A for the construction of Kim Chuan Depot extension and its associated facilities was awarded to Woh Hup (Private) Limited at a sum of S$1.21 billion in September 2017. Construction began in 2018, with completion in 2025.[7][8]

The extension will be located along the northern perimeter of theBartley Road Eastviaduct, north of the existing depot which is along the southern perimeter of theBartley Road Eastviaduct.

References

[edit]
  1. ^"Factsheet: Downtown Line 3 to Open on 21 October 2017 | Press Room | Land Transport Authority".www.lta.gov.sg.Retrieved13 August2017.
  2. ^Shereena Sajeed (4 March 2009)."World's largest underground depot opens in Singapore".Channel News Asia. Archived fromthe originalon 19 October 2012.Retrieved5 March2009.
  3. ^"Kim Chuan Depot".Land Transport Guru.Retrieved8 February2017.
  4. ^"T.Y. Lin International Group | News | T.Y. Lin International's Singapore Office Awarded Design and Engineering Consultancy Services Contract for Circle Line (Stage 6) Depot".T.Y. Lin International Group.Retrieved13 August2017.
  5. ^"LTA | News Room | News Releases | Joint Release by the Land Transport Authority (LTA) & SLA - Circle Line 6 – Becoming A Full Circle".5 March 2020. Archived fromthe originalon 5 March 2020.Retrieved5 March2020.
  6. ^"Biggest underground train depot set to become even bigger, Transport News & Top Stories - The Straits Times".5 March 2020. Archived fromthe originalon 5 March 2020.Retrieved5 March2020.
  7. ^"LTA | News Room | News Releases | LTA Awards First Three Civil Contracts for Circle Line 6".5 March 2020. Archived fromthe originalon 5 March 2020.Retrieved5 March2020.
  8. ^"First Circle Line 6 contracts worth S$1.75b awarded by LTA - CNA".5 March 2020. Archived fromthe originalon 5 March 2020.Retrieved5 March2020.