Jump to content

M11 motorway

Route map:
From Wikipedia, the free encyclopedia

M11 shield
M11
MapM11 highlighted in blue

Shown with UK motorway network
Motorway M11 Cambridge.JPG
The M11 north ofCambridge
Route information
Maintained byNational Highways
Length55.0 mi (88.5 km)
Existed1975–present
HistoryOpened: 1975
Completed: 1980
Major junctions
Southwest endSouth Woodford
Major intersections
M25 motorway
Northeast endGirton
Location
CountryUnited Kingdom
CountiesGreater London,Essex,Cambridgeshire
Primary
destinations
London
Harlow
Stansted Airport
Cambridge
Road network
M9M18

TheM11is a 55 miles (89 km)motorwaythat runs north from theNorth Circular Road(A406) inSouth Woodfordto theA14,northwest ofCambridge,England. Originally proposed as a trunk road as early as 1915, various plans were considered throughout the 1960s, with final construction being undertaken between 1975 and 1980. The motorway was opened in stages, with the first stage between junctions 7 and 8 opening in June 1975, and the completed motorway becoming fully operational in February 1980. Running fromWoodfordtoGirton,the motorway provides direct access toHarlow,Cambridgeand since 2002, greatly improved access toLondon Stansted Airport.

Route[edit]

The M11 starts in South Woodford in northeast London, just north of Redbridge Roundabout, crosses theNorth Circular(A406) at junction 4, it then headsNNE,passing east ofLoughtonandTheydon Boisas well asEpping Forest,meeting theM25 motorwayat junction 6, and then veering approximately north, passing to the east ofHarlow.The M11 gives access toBishop's Stortfordand the motorway's onlyservice stationvia junction 8. This is followed immediately by the recently constructed junction 8A, which provides a free-flow link to the improvedA120that links toStansted Airport.The M11 then traverses part ofCambridgeshire,meeting a spur for theA11at junction 9, Stump Cross, and then finally ends at junction 14, the Girton Interchange, with the road continuing through the junction and becoming theA14,which continues the route on toHuntingdonand the north.

The motorway starts with two lanes southbound and three northbound; then, north ofWoodford Bridge,both directions have three lanes, a layout that continues up to junction 8A, except for a brief two-lane section at junction 6, beneath the M25. From junction 8 the motorway has two lanes in both directions all the way to junction 14 where the motorway terminates. The motorway is illuminated at the southern terminus near junction 4, at junction 6 (the M25 interchange), and also at the approach to junction 8/8A (Stansted Airport/Bishop's Stortford), and then at the northern terminus at junction 14, for the A14. All four of these sections use modernhigh-pressure sodium(SON) lighting. The older, yellow, low-pressure sodium (SOX) lighting originally used at junctions 4 and 6 was replaced in 2005. The M11 junctions 1, 2 and 3 do not exist; see the History section below for explanation.

History[edit]

Planning[edit]

Plans for an 'Eastern Avenue' in London had been proposed as early as 1915, and the Eastern Avenue Extension was causing local concern in Leyton and Hackney during the late 1950s and early 1960s.[1]It was opposed by a number of groups, including the Hackney Society[2]and local residents as represented by their member of parliament in 1962.[3]

By 1966, theMinistry of Transportwas planning a longer road and for it to be partly motorway. The first version had a mid-south section, to follow aRiver Learoute, starting atAngelsouthwest ofDalston,heading northeast then north, taking land by the river inWalthamstow,ChingfordandWaltham Cross,and meeting the built road alignment of today north ofHarlow.The road from South Woodford toIslingtonwould have been designated as the M12. The route was in planning stages with several options, with differences between the plans preferred by the Greater London Council and the Ministry of Transport[4]– a different version called for this 'Eastern Avenue' to run more east–west alongside theRegent's Canaland the north side ofVictoria Park,Hackney Wick,where it would have connected to theNorth CrossandEast Cross Routesat the northeast corner of aninner ringwayidentified by theLondon Ringways[n 1]plan.[4]

There were three proposed routes from the inner toouter ringway(North Circular) at the base of the current M11 and it is unclear which one was favoured.[4]

Under one scheme, south ofSouth Woodforda connection would have been made with the western end of a proposed "M12"towardsColchester.These proposals also made the case for anM15 motorwayfor the Ringway 2, a major upgrade of theNorth Circular Roadto typical motorway standard. When the southern end of the current M11 ended here, space was provided between the two carriageways to enable an offshoot of 'the M12' to merge from the southwest: junctions 1, 2 and 3 were reserved for this additional inner London section. Part of the unbuilt route of a southern section of the M11 is seen from a sliproad from the North Circular to the M11 which travels over a bridge over bare land.

It was announced in March 1975 that from junction 8 (Bishops Stortford/Stansted exit) to the northern terminus, (thus including the Cambridge western bypass) would not be "constructed to M1 standard".[5]This was another way of stating that, following a change in government policy, this section would comprise two rather than three lanes in each direction.[5]

Additions[edit]

TheM11 Link Road,or more formally 'A12 Hackney to M11 link road' (in fact leading to the North Circular) was constructed during the 1990s fromHackney WickbyVictoria Parkto the Redbridge Roundabout—the interchange with the North Circular—and was opened in 1999[n 2].[6]The route of this road, which followed a similar route to one of the initial proposals[4]resulted in the protractedM11 link road protestbetween 1993 and 1995, one of a spate of majorUK road protestsunder theMajor ministry.

A new junction 7a was opened on 10 June 2022. The stated aims for this development are:[7][8]

  • Create a new east–west link, which will move traffic smoothly out of Harlow on to the M11
  • Reduce congestion on the north–south links through Harlow and towards junction 7
  • Create new public transport and sustainable travel opportunities
  • Provide new opportunities for housing and business developments.

Abortive/suspended proposals[edit]

Junction 5[edit]

An official plan to add north-facing connections at junction 5 inDebden,Loughtonwas abandoned in 1998.[9]

Junctions 6 to 8[edit]

M11 Junction 6 to 8 widening
A map showing the 2009 proposal for widening of the M11 and surrounding road proposals
LocationEssex
ProposerHighways Agency
Statussuspended
Typeroad
Cost estimate£698 million (2007)
GeometryKML

The Highways Agency tabled proposals to upgrade the M11, between junction 6 and 8, from three lanes plus hard shoulder to four each way with an estimated cost of £698 million given in 2007.[10] A number of public consultations were made throughout 2007[11]and although efforts were made to limit environmental damage the scheme would cause disruption and loss of habitat to three designated ecological areas and aSite of Special Scientific Interest (SSSI)at Gernon Bushes.[12]Maps of the proposal and previously discounted options were published by the Highways Agency. Plans were abandoned in March 2009 when theSecretary of State for Transportannounced that no changes would be made to this section of motorway before 2021.[13]

Construction[edit]

The motorway was opened in stages. The stretch between junctions 7 and 8 opened in 1975, and that between junctions 4 and 7 in 1977.[n 3]The stretch from junctions 8 to 9 opened in 1979; that between junctions 9 and 14 in 1980; and the full length becoming fully operational in February 1980.[15][16]

Budgets were tight during the 1970s when the road was built, so theroad surfacewas of unsurfacedconcretebetween junction 14 and a point approximately 2 miles (3.2 km) to the south of junction 7. South of this stretch, where the road runs on soft ground close to theRiver Roding,concrete was considered unsuitable owing to the looseness of thesubsoiland the consequent risk of random cracking, so the surface here was oftarmacfrom the start.

Services[edit]

The motorway's first, and only, service station, Birchanger Green Services at junction 8, opened in 1996. The services also serve theA120,a major high-speed dual-carriageway road, running from junction 8A to the eastern fringe ofBraintree,it continues on toColchesteras a busy single-carriageway road.[17]

There had been plans for a service station on the motorway as long ago as 1969, namedChigwell,between that village andLoughton,which led to the construction of spur roads and a restricted lorry park; during theLondon Olympics 2012these were used as a works unit.[18]The plans for a service station at this site were officially dropped in 1980.[19]

Operation[edit]

From the late 1990s onward, the concrete surface that had greatly degraded was progressively replaced with standard layers of tarmac, anddrainageimprovements were implemented at the same time. This work was completed in June 2008.

Junction 8A for the A120 road and Stansted Airport opened in December 2002.

Proposed developments[edit]

By way of complementary plans forproposed expansionofStansted Airport,theHighways Agencycollaborated withBAAon improvements to transport access to the airport[12]including two proposals for the M11, one of which has been deemed unnecessary, junctions 6–8, see above and the other of which, including spur road and junction additions may be approved by the government if Stansted expansion takes place.[20]

M11 and A120 interchange – Stansted generation 2 airport access[edit]

Stansted generation 2 airport access
A map showing the proposed road development at the entry to Stansted Airport.
LocationEssex
ProposerHighways Agency
Statussuspended
TypeRoad
Cost estimate£131 million

A joint scheme involving works on junctions on the M11 andA120.This scheme was part of an aborted plan to add a second runway to Stansted Airport. It proposed changes to junction 8 of the M11 with the creation of junction 8B, linked to and situated just north of junction 8/8A and the creation of a new junction on the A120, to provide additional rapid access to the expanded airport.[21]The scheme was given an estimated cost of £131million in May 2008.[22]

A number of public consultations and exhibitions were held throughout 2007. Findings from these showed that although the public had several concerns regarding environmental impact 57% of attendees agreed the scheme would be necessary if the Stansted Airport expansion proceeded.[21]Following the public consultation, the preferred route was published on 5 March 2008 and the draft orders on 27 March 2008. A pre-public inquiry meeting took place on 10 November 2008,[23]with a public inquiry due in April 2009.[24]However, this was delayed until further notice following BAA's appeal against theMarch 2009 rulingof the Competition Commission and the proposal lapsed when the application for a second runway was withdrawn by BAA in 2010.[25][26]

Incidents[edit]

Plane crash[edit]

On 2 June 2002, a brake failure on anAero L-39 Albatrosslanding at theImperial War Museum Duxfordcaused the plane to run off the end of the runway and down an embankment onto the southbound carriageway of the motorway. The trainee pilot was killed when heejectedat ground level, but the instructor survived the accident and no vehicles on the motorway were involved.[27]The main runway at Duxford had been shortened in 1977 from 6,000 feet (1,800 m) to 4,800 feet (1,500 m) when the motorway was built. More recently, even though Duxford already met all licensing requirements, the declared length was reduced to 4,010 feet (1,220 m) to increase safety further than existing measures.[28][29]

Snow storm[edit]

In January 2003, thousands of motorists became stranded on "White Friday" for up to 20hours between junctions 7 and 9 during a snowstorm.[30]

Junctions[edit]

Data fromdriver location signsare used to provide distance and carriageway identifier information.[31]

M11 motorway junctions
mile km Southbound exits (B carriageway) Junction Northbound exits (A carriageway) Coordinates
7.5 12.1 North CircularA406 (West)(A10, A1),West End
The City,Docklands,Blackwall Tunnel(A12, A13),A406 South
J4 Start of motorway 51°35′52″N0°02′38″E/ 51.5978°N 0.0438°E/51.5978; 0.0438(M11, Junction 4 - start of motorway)
EnteringGreater London EnteringEssex
11.4 18.4 No access J5 Debden,LoughtonA1168 51°38′25″N0°05′03″E/ 51.6404°N 0.0842°E/51.6404; 0.0842(M11, Junction 5)
14.7 23.6 Watford,Oxford,Heathrow Airport,M1,M40,M4M25(W)
Gatwick Airport,Dartford Crossing,M23,M20M25(E)
J6 Watford, Oxford, Heathrow Airport, M1, M40, M4 M25(W)

Gatwick Airport, Dartford Crossing, M23, M20 M25(E)

51°40′46″N0°07′30″E/ 51.6794°N 0.1250°E/51.6794; 0.1250(M11, Junction 6)
19.1 30.7 Chelmsford,HarlowA414 J7 Harlow A414 51°44′36″N0°08′16″E/ 51.7432°N 0.1377°E/51.7432; 0.1377(M11, Junction 7)
22.6 36.3 HarlowA1025 J7A HarlowA1025 51°47′19″N0°10′13″E/ 51.7886°N 0.1704°E/51.7886; 0.1704(M11, Junction 7a)
28.9 46.5 Bishop's Stortford,Services,Colchester,StanstedA120 J8
Services
Bishop's Stortford, Services A120(W) 51°52′18″N0°11′57″E/ 51.8717°N 0.1992°E/51.8717; 0.1992(M11, Junction 8)
29.2 47.0 No access J8A Stansted, Colchester A120(E) 51°52′08″N0°11′50″E/ 51.8689°N 0.1972°E/51.8689; 0.1972(M11, Junction 8a)
EnteringEssex EnteringCambridgeshire
43.3 69.7 No access J9 Newmarket,Norwich,IpswichM11 (A11). 52°03′31″N0°11′21″E/ 52.0587°N 0.1891°E/52.0587; 0.1891(M11, Junction 9)
29.2 47.0 No access J9A Saffron Walden, Cambridge South, Haverhill A1301, B184, B1383. Spur continues as A11. 52°04′33″N0°11′35″E/ 52.0759°N 0.1931°E/52.0759; 0.1931(M11, Junction 9a)
45.9 73.9 Saffron Walden,Duxford,Haverhill, SuffolkA505 J10 Royston,Duxford A505 52°05′55″N0°08′17″E/ 52.0986°N 0.1381°E/52.0986; 0.1381(M11, Junction 10)
50.8 81.7 RoystonA10
CambridgeA1309
J11 HarstonA10
CambridgeA1309
52°09′37″N0°06′12″E/ 52.1602°N 0.1034°E/52.1602; 0.1034(M11, Junction 11)
53.4 85.9 Cambridge,SandyA603 J12 Cambridge, Sandy A603 52°11′22″N0°04′27″E/ 52.1894°N 0.0743°E/52.1894; 0.0743(M11, Junction 12)
55.1 88.6 No access J13 Cambridge,BedfordA1303 52°12′42″N0°04′39″E/ 52.2118°N 0.0776°E/52.2118; 0.0776(M11, Junction 13)
56.2 90.4 St NeotsA428 J14 Newmarket A14

Ely (A10)

52°13′50″N0°04′15″E/ 52.2306°N 0.0707°E/52.2306; 0.0707(M11, J14)
Start of motorway,Non-motorway traffic:Cambridge,NewmarketA14 Road continues north asA14towards The Midlands, which then becomes theM6 motorwaytowards The North West, and finally, theA74(M)inScotland,and ends inGlasgow. 52°14′25″N0°03′29″E/ 52.2404°N 0.0581°E/52.2404; 0.0581(M11, Start of motorway)

In popular culture[edit]

Life in the Fast Lane: The No M11 Story(1995) is a documentary film that recounts the story of the No M11 Campaign.

See also[edit]

Notes and references[edit]

Notes
  1. ^An expressway inner circular, referred to as theLondon Motorway Box
  2. ^as the A12 which then continues to the east toChelmsfordandColchester
  3. ^Constructed to the south of the not-yet built M25 interchange byW. & C. French Engineering,and to its north by Dowsett Engineering Construction Ltd ofHarrogate[14]
References
  1. ^"Leyton – Introduction".British History.Retrieved28 December2009.
  2. ^"History".Hackney Society.Retrieved28 December2009.
  3. ^"Eastern Avenue Extension".Parliamentary Debates (Hansard).8 May 1962.Retrieved28 December2009.
  4. ^abcd"Histories – Ringways – Northern Radials – M11".CBRD. Archived fromthe originalon 10 August 2009.Retrieved28 December2009.
  5. ^ab"Motorweek: Three lanes to two".Motor.22 March 1975. p. 25.
  6. ^"nce".Retrieved28 December2009.
  7. ^"M11 Junction 7a".Essex County Council.Retrieved10 June2022.
  8. ^"New M11 junction hopes to reduce Harlow congestion".BBC Newswebsite.Retrieved12 June2022.
  9. ^"Taking Road Safety to the Extreme".15 August 1998.Retrieved2 February2008.[permanent dead link]
  10. ^ "M11 Junctions 6 to 8 Improvements Original Proposal".Highways Agency.Archived fromthe originalon 1 December 2008.Retrieved7 November2008.
  11. ^ "M11 Junctions 6 to 8 Improvements".Highways Agency.Archived fromthe originalon 15 October 2008.Retrieved7 November2008.
  12. ^ab "M11 Junctions 6 to 8 Improvements Spring 2007 Consultation"(PDF).Highways Agency.Archived fromthe original(PDF)on 5 June 2011.Retrieved7 November2008.
  13. ^"Road and rail capacity (East of England)".Department for Transport. Archived fromthe originalon 11 May 2009.
  14. ^"The Motorway Archive".Archived fromthe originalon 26 December 2008.Retrieved7 September2009.
  15. ^"M11".CBRD.Retrieved7 November2008.
  16. ^"M11 chronology map".CBRD. Archived fromthe originalon 9 June 2009.Retrieved29 June2009.
  17. ^Good Stuff IT Services."Birchanger Green Services M11 | Information and Facilities | Motorway Services".Motorwayservices.info. Archived fromthe originalon 21 January 2012.Retrieved31 December2011.
  18. ^"Chigwell services - Roader's Digest: The SABRE Wiki".sabre-roads.org.uk.Retrieved22 March2018.
  19. ^"Unbuilt Services".Motorway Services Online.Retrieved31 December2011.
  20. ^"plane talk February/March 2007"(PDF).BAA.Archived fromthe original(PDF)on 28 September 2011.Retrieved7 November2008.
  21. ^ab "Stansted Generation 2 Airport Access from M11 and A120"(PDF).Highways Agency.Archived fromthe original(PDF)on 1 December 2007.Retrieved7 November2008.
  22. ^ "Appraisal Summary Table: Airport Access Roads"(PDF).Highways Agency.Archived fromthe original(PDF)on 5 June 2011.Retrieved7 November2008.
  23. ^"Stansted G2 Inquiry Pre-Inqury Meeting".Planning Inspectorate.Retrieved7 November2008.
  24. ^"Stansted G2 Inquiry".Planning Inspectorate.Retrieved7 November2008.
  25. ^"Stansted G2 Public Inquiry"(PDF).Planning Inspectorate.Archived fromthe original(PDF)on 4 September 2009.Retrieved29 June2009.
  26. ^ "M11 and A120 Stansted Generation 2 Airport Access".Highways Agency.Archived fromthe originalon 16 October 2008.Retrieved7 November2008.
  27. ^"Motorway reopened after jet crash".BBC News.3 June 2002.Retrieved31 December2011.
  28. ^"Duxford Airfield".Duxford.iwm.org.uk. Archived fromthe originalon 26 October 2011.Retrieved31 December2011.
  29. ^"Accident Report"(PDF).Archived fromthe original(PDF)on 11 February 2012.Retrieved31 December2011.
  30. ^ BBCThousands trapped in snow storm,31 January 2003
  31. ^Driver Location Signs (map) Highway Authority 2009

External links[edit]

Geographic data related toM11 motorwayatOpenStreetMap

KML is from Wikidata