Jump to content

MF 01

From Wikipedia, the free encyclopedia
MF 01
MF 01 trainset
Interior of an MF 01 trainset
In service2008–present
ManufacturerAlstom,Bombardier,Technicatome,CSEE Transport
Family nameMetropolis
ReplacedMF 67
Constructed2007–2017
Entered service11 June 2008(2008-06-11)
Number built865 cars (173 trainsets)
Formation5 cars per trainset
Capacity557 per train
OperatorsRATP
Lines servedParis MétroParis Métro Line 2Paris Métro Line 5Paris Métro Line 9
Specifications
Car body constructionSteel
Train length75 m (246 ft 1 in)
Car length15 m (49 ft 3 in)
Width2.40 m (7 ft 10 in)
Height3.47 m (11 ft 5 in)
Doors2 × 3 pairs per car
Maximum speed70 km/h (43 mph)
Weight125.7 t (277,000 lb)
Traction systemAlstom OniXIGBTVVVF;Alstom AGATE control system
Traction motors12 × 103 kW (138 hp) 3-phase ACinduction motor
Power output1,236 kW (1,658 hp)
Transmission1:7.28 ratio
Acceleration0.95 m/s (3.1 ft/s)
Deceleration
  • Emergency: 1.3 m/s2(4.3 ft/s2)
  • Service: 1.1 m/s2(3.6 ft/s2)
Electric system(s)750 V DCthird rail
Current collector(s)Contact shoe
UIC classification2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
Braking system(s)Electrodynamic,regenerative,disc
Track gauge1,435 mm(4 ft8+12in)standard gauge

TheMF 01(French:MétroFer appel d'offres de 2001;English:Steel-wheeled metro ordered in 2001;also calledMF 2000from its year of itsinvitation to tender) is a model of steel-wheeledelectrical multiple unitsused onParis'sMetrosystem. The cars first arrived in December 2007 and delivery was completed in 2015.RATPordered 160trainsor 800 cars in 2001, to replace the agingMF 67.It is used onLine 2,Line 5,andLine 9.

The MF 01 was first introduced to the press on 17 June 2005 but it would not be until January 2006 that the first trains would undergo testing on the system. Commercial service on Line 2 began on 11 June 2008, with all of Line 2 being equipped with the new rolling stock by March 2011. Testing quickly commenced on Line 5, where two trains were initially deployed. Commercial service on Line 5 began on 15 June 2011, with nearly 25 trains in service as of April 2012.

On 9 February 2011, theSTIFvoted to purchase MF 2000 stock for Line 9 at a cost of €330 million. Deliveries took place in 2013, after all of the stock was delivered to Line 5, and will continue through 2016. The features of the Line 9 trains will be virtually identical to the trains on Lines 2 and 5, including the air conditioning systems. However, the trains feature a new joint RATP/STIF exterior livery that is based on the MI 09 commuter rail rolling stock on theRER A,marking the first time that the co-branded RATP/STIF livery is seen on the Metro. The first train (#096) for Line 9 was delivered in June 2013 and began revenue service along Line 5 in July 2013. The train was then prepared for revenue service on Line 9 in early October 2013, going into revenue service on 21 October 2013.

Conception

[edit]

With many of the MF 67 trains approaching 35 years old on Lines 2, 5, and 9, the RATP determined that a new class of steel-wheel rolling stock was needed. Due to changes in European legislation regarding competition, the RATP was required to change the way it awarded bids. This resulted in the RATP launching an open bid where numerous firms could take part.

The winningconsortiumof four train manufacturers, namelyAlstom,Bombardier,TechnicatomeandCSEEwas chosen to manufacture the MF 2000 stock at a cost of800 million. It was the first time in history that the RATP has assigned four manufacturers to manufacture different components of the train cars. This process delayed the delivery by a year due to poor collaboration between the four companies, but theRATPhas seen a drop in costs.

Description

[edit]

The exterior design of the MF 01 was the result of a design competition, and the winning design is similar to theMP 89.The interior also looks similar to MP 89's interior, carrying on features likeinterconnecting gangwaysbetween cars, but with new security features added. The MF 01 is the first rolling stock type on the Paris Metro to feature a refrigerated ventilation system inside the driver's cabs and passenger interiors, specially designed for the Metro's restrictedloading gauge,which consumes less electricity than traditionalair-conditioning.Additionally, the MF 2000 consumes 30% less energy than its older counterparts due to innovations in traction and braking systems.

Currently, pre-production train #001 contains theDilidammultimedia system. Although all of the MF 01 trains are configured in a way so that the system can easily be installed, high cost has delayed implementation to all trainsets. The same train, in August 2014, became the first set to be repainted in the hybrid RATP/STIF livery and permanently reassigned to Line 9, having originally ran on Line 2.

Deliveries to Line 9

[edit]

Unlike the previous deliveries of the MF 01 stock trains to Lines 2 and 5; deliveries to Line 9 will consist of placing trains into revenue service along Line 5 for a short time before being moved over to Line 9 for revenue service. The ongoing reconstruction of the Boulogne workshops along Line 9 prevents any mass cascading of rolling stock to occur, since the Auteuil workshops, which Line 10 temporarily shares with Line 9, are not equipped to handle maintenance operations for the MF 01 rolling stock, and thus heavy maintenance work must be done at the Bobigny workshops along Line 5.

Formations

[edit]

In date of 25 December 2021:

  • 173 MF 01 trainsets were in service and were formed as shown below, with three motored ( "M" ) cars and two non-powered trailer ( "T" ) cars.
  • One trainset was scrapped in 2017 (001: accident).

As of 1 March 2022, 45 trainsets were allocated to Charonne Depot (Paris) for use on Line 2, 52 trainsets were allocated to Bobigny Depot (Paris) for use on Line 5, and 74 trainsets were allocated to Boulogne Depot for use on Line 9.

Porte Dauphine
Nation
Bobigny
Place d'Italie
Pont de Sèvres
Montreuil
Car No. 1 2 3 4 5
Type T M M M T
Designation 01 S1 xxx(number trainset) 01 N1 xxx(number trainset) 01 N3 xxxnumber trainset) 01 N2 xxx(number trainset) 01 S2 xxx(number trainset)
Equipment CP, SIV VVVF VVVF VVVF CP, SIV
  • VVVF: Inverters OniX IGBT–VVVF
  • CP: Air compressor
  • SIV: Static inverter
[edit]

References

[edit]

This article incorporates information from the corresponding article on theFrench Wikipedia.