Nuclear power in India
![]() | This article needs to beupdated.(September 2023) |
Nuclear poweris the seventh-largest source ofelectricity in Indiaafter coal, solar, wind,hydro,gas and biomass.[citation needed]As of November 2024[update],Indiahas 24nuclear reactorsin operation in 8nuclear power plants,with a total installed capacity of 8,180 MW.[1][2] Nuclear power produced a total of 48TWhin 2023, contributing around 3% of total power generation in India.[3]11 more reactors are under construction with a combined generation capacity of 8,700 MW.
In October 2010, India drew up a plan to reach a nuclear power capacity of 63 GW in 2032.[4]However, following the 2011Fukushima nuclear disaster,there have been numerous anti-nuclear protests at proposed nuclear power plant sites.[5] There have been mass protests against theJaitapur Nuclear Power Projectin Maharashtra and theKudankulam Nuclear Power Plantin Tamil Nadu, and a proposedlarge nuclear power plant near Haripurwas refused permission by theGovernment of West Bengal.[5] APublic Interest Litigation(PIL) has also been filed against the government's civil nuclear programme at the Supreme Court.[5][6]
India has been making advances in the field ofthorium-based fuels, working to design and develop a prototype for an atomic reactor using thorium and low-enriched uranium,a key part ofIndia's three stage nuclear power programme.[7]
History
[edit]Year | Generation (TWh) |
---|---|
2005 | |
2006 | |
2007 | |
2008 | |
2009 | |
2010 | |
2011 | |
2012 | |
2013 | |
2014 | |
2015 | |
2016 | |
2017 | |
2018 | |
2019 | |
2020 | |
2021 | |
2022 | |
2023 |
Early nuclear physics research
[edit]As early as 1901, theGeological Survey of India(GSI) had recognised India as potentially having significant deposits of radioactive ores, includingpitchblende,uraniumandthorianite.In the ensuing 50 years, however, little to no effort was made to exploit those resources.[11]During the 1920s and 1930s, Indian scientists maintained close links to their counterparts in Europe and the United States, and were well aware of the latest developments in physics. Several Indian physicists, notablyDaulat Singh Kothari,Meghnad Saha,Homi J. BhabhaandR. S. Krishnan,conducted pioneering research innuclear physicsin Europe during the 1930s.
By 1939, Meghnad Saha, the Palit Professor of Physics at theUniversity of Calcutta,had recognised the significance of the discovery ofnuclear fission,and had begun to conduct various experiments in his laboratory related to nuclear physics. In 1940, he incorporated nuclear physics into the university's post-graduate curriculum.[12]In the same year, theSir Dorabji Tata Trustsanctioned funds for installing acyclotronat the University of Calcutta, but various difficulties likely related to the war delayed the project.[13]In 1944,Homi J. Bhabha,a distinguished nuclear physicist who had established a research school at theIndian Institute of Science, Bangalore,wrote a letter to his distant cousinJ. R. D. Tata,the chairman of theTata Group.He requested funds to establish a research institute of fundamental physics, "with special reference to cosmic rays and nuclear physics." TheTata Institute of Fundamental Research(TIFR) was inaugurated inMumbaithe following year.[14]
Establishment of atomic energy in India
[edit]Following theatomic bombing of Hiroshimain August 1945, R.S. Krishnan, a nuclear physicist who had studied underNorman FeatherandJohn Cockcroft,and who recognised the massive energy-generating potential of uranium, observed, "If the tremendous energy released from atomic explosions is made available to drive machinery, etc., it will bring about an industrial revolution of a far-reaching character." He further noted, however, the difficulties in harnessing nuclear power for peaceful usage, "...a great deal more research work is needed before atomic power can be put to industrial use."[15]
In March 1946, the Board of Scientific and Industrial Research (BSIR), under theCouncil of Scientific and Industrial Research(CSIR), set up an Atomic Research Committee under Bhabha's leadership to explore India's atomic energy resources and to suggest ways to develop and harness them, along with establishing contacts with similar organisations in other nations.[16]At the same time, theUniversity of Travancore's research council met to discussTravancore's future industrial development. Among other matters, the council made recommendations for developing the state's resources ofmonazite,a valuablethoriumore, andilmenite,with regard to their applications in atomic energy. The council suggested the project could be undertaken by an all-India programme.[16]This was followed by the deputation of Bhabha and SirShanti Swarup Bhatnagar,the Director of the CSIR, to Travancore in April 1947 and the establishment of a working relationship with the kingdom'sdewan,SirC. P. Ramaswami Iyer.[17]
Early in 1947, plans were made to establish a Uranium Unit under the Geological Survey of India, to focus on identifying and developing resources of uranium-bearing minerals.[18]In June 1947, two months beforeIndian independence,Chakravarti Rajagopalachari,then Minister for Industry, Supply, Education and Finance in theInterim Government of India,established an advisory board for research in atomic energy. Chaired by Bhabha and placed under the CSIR, the advisory board included Saha, Bhatnagar and several other distinguished scientists, notably SirK. S. Krishnan,the co-discoverer of theRaman effect,geologistDarashaw Nosherwan WadiaandNazir Ahmed,a student ofErnest Rutherford.A Joint Committee comprising the above scientists and three representatives of the Travancore government was set up to determine how best to utilise Travancore's resources of monazite.[19]Following the independence and partition of India, Travancore briefly declared itself independent before acceding to the newDominion of Indiain 1949 after a period of intense negotiations, while Ahmad departed forPakistan,where he would eventually head that nation's atomic energy agency.
On 23 March 1948, Prime MinisterJawaharlal Nehruintroduced the Atomic Energy Bill in the Indian Parliament,[20]and it was subsequently passed as the Indian Atomic Energy Act. Modelled on the British Atomic Energy Act 1946, the Act granted sweeping powers to the central government over nuclear science and research, including surveying for atomic minerals, the development of such mineral resources on an industrial scale, conducting research regarding the scientific and technical problems connected with developing atomic energy for peaceful purposes, the training and education of the necessary personnel and the fostering of fundamental research in the nuclear sciences in Indian laboratories, institutes and universities.[14]Around the same time, theGovernment of West Bengalsanctioned the construction of a nuclear physics institute under the University of Calcutta; the cornerstone was laid in May 1948,[21]and the institute was inaugurated on 11 January 1950 byIrène Joliot-Curie.[12]
With effect from 1 June 1948, the advisory board for Research in Atomic Energy, together with its parent organisation the CSIR, was folded into the newDepartment of Scientific Researchand placed directly under the Prime Minister. On 3 August 1948, theAtomic Energy Commission of India(AEC) was established and made separate from the Department of Scientific Research, with Bhabha as its first chairman.[22]In January 1949, the AEC met to formulate a uniform under- and post-graduate university syllabus for theoretical and fundamental physics and chemistry, to guarantee sufficient numbers of nuclear scientists and to ensure they would receive consistent levels of training and education.[23]In the same year, the Tata Institute of Fundamental Research was designated by the CSIR as the hub for all major nuclear science research projects. In 1950, the government announced it would purchase all available stocks of uranium and beryllium minerals and ores, and declared large rewards for any significant discoveries of the same.[24][25]On 3 January 1954, the Atomic Energy Establishment, Trombay (AEET) was established by the Atomic Energy Commission to consolidate all nuclear reactor research and technology-related developments; on 3 August, the Atomic Energy Commission and all its subordinate agencies, including the Tata Institute of Fundamental Research and the nuclear research institute at Calcutta University, were transferred to the newDepartment of Atomic Energyand placed under the direct charge of the Prime Minister's Office.[14]In May 1956, construction on a uranium metal plant and a fuel element fabrication facility for the research reactors began at Trombay; the uranium plant came into operation in January 1959, followed by the fuel element facility in February 1960.[26][27]The AEET (renamed theBhabha Atomic Research Centrein 1967, after Bhabha's death) was formally inaugurated by Nehru in January 1957.[26]With the expanding scope of Indian nuclear research, the 1948 Atomic Energy Act was amended in 1961, and was passed as the new Atomic Energy Act, coming into force in September 1962.[28][29][26]
Early research reactors
[edit]![](https://upload.wikimedia.org/wikipedia/commons/thumb/f/f4/Stamp_of_India_-_1965_-_Colnect_371668_-_1_-_Atomic_Reactor_Trombay.jpeg/220px-Stamp_of_India_-_1965_-_Colnect_371668_-_1_-_Atomic_Reactor_Trombay.jpeg)
At a meeting of the Atomic Energy Commission on 15 March 1955, the decision was made to construct a small nuclear reactor at Trombay. The reactor would be used for training personnel for the operation of future reactors and for research, including experiments in nuclear physics, studying the effects of irradiation and the production of isotopes for medical, agricultural and industrial research.[30]In October 1955, an agreement was signed by theUnited Kingdom Atomic Energy Authorityand the Indian Department of Atomic Energy, under which Britain would supply uranium fuel elements for aswimming pool reactorto be designed by India.[30]The agreement further ensured the "close cooperation and mutual assistance between the Department and the Authority in the promotion and development of the peaceful uses of atomic energy," and provided for future design and collaboration in the construction of ahigh flux reactorat a later date.[31]NamedApsara,the reactor was housed in a 100 x 50 x 70 concrete building. India's and Asia's first nuclear reactor,Apsarareached criticality at 3:45 p.m on 4 August 1956 and was inaugurated by Prime Minister Nehru on 20 January 1957.[30][32][33]
In April 1955, the Canadian government under Prime MinisterLouis St. Laurentoffered to assist in building anNRX-type reactor for India under theColombo Plan,of which both India and Canada were then members. Prime Minister St. Laurent expressed hopes the reactor would serve India well in the development of peaceful atomic research and development. On behalf of the Indian government, Nehru formally accepted the offer that September, stating the reactor would be made available to any accredited foreign scientists, including those from other Colombo Plan member states.[34][35][36]On 28 April 1956, Nehru and the Canadian High Commissioner to IndiaEscott Reidsigned an agreement for a "Canada-India Colombo Plan Atomic Reactor Project." Under the terms of the agreement, Canada would provide a 40 MWCIRUS reactorfor solely research purposes, including the initial manufacture and engineering of the reactor, and would also provide technical expertise, including training Indian personnel in its operation. India would supply the reactor site and foundation, and would also pay all "internal" costs, including the construction of the reactor complex, the costs of local labour and any shipping and insurance fees.[37]Under Article II of the agreement, India would make the reactor facilities available to other Colombo Plan nations. Article III stipulated that the "reactor and any products resulting from its use will be employed for peaceful purposes only;"[37]at the time, however, there were no effective safeguards to ensure this clause.[35][36]A further agreement was made with the United States government to supply 21 tons ofheavy waterfor the reactor.[38]Construction of the reactor began later in 1956, with Indian technical personnel sent to Chalk River for training.[39]CIRUS was completed in early 1960 and after achieving criticality in July 1960, was inaugurated by Nehru in January 1961.[40]Construction of a third research reactor, ZERLINA (Zero Energy Reactor for Lattice Investigations and New Assemblies) began at Trombay in 1958; ZERLINA was also commissioned in 1961.[41]
Beginnings of commercial nuclear power
[edit]![](https://upload.wikimedia.org/wikipedia/commons/thumb/7/73/Narora_Atomic_Power_Plant.jpg/220px-Narora_Atomic_Power_Plant.jpg)
In September 1955, the question of building a commercial nuclear power station was raised in Parliament.[42]Shortly after theworld's first commercial nuclear power plantcame online atObninskin theSoviet Union,the Soviets invited a number of Indian experts to visit it; the United States concurrently offered training in atomic energy to Indian technical and scientific personnel.[43]In August 1957, members of the Gujarat Chamber of Commerce inAhmedabad(then inBombay State) requested an atomic power station for their city, by which time the Indian government was actively considering the construction of at least "one or more large Atomic Power Stations to generate electricity."[44]By November 1958, the Atomic Energy Commission had recommended construction of two nuclear power stations, each consisting of two units and able to generate 500 MW of power, for a total generating capacity of 1000 MW; the government decided that a minimum of 250 MW of electricity generated from nuclear reactors would be incorporated into the Third Five Year Plan (1961–1966).[45]
In February 1960, it was decided the first power plant would be erected in Western India, with locations in Rajasthan, near Delhi and near Madras noted for future commercial reactors.[46]In September, the Punjab government requested a nuclear power station for their state.[47]On 11 October 1960, the Indian government issued a tender for India's first nuclear power station nearTarapur, Maharashtraand consisting of two reactors, each generating around 150 MW of electricity and to be commissioned in 1965.[48]In August 1961, the Indian and Canadian governments agreed to conduct a joint study on building a Canada-India nuclear power plant inRajasthan;the reactor would be based on theCANDU reactoratDouglas Pointand would generate 200 MW.[40]By this time, seven responses to India's global tender for the Tarapur power station had been received: three from the United States, two from the UK and one each from France and Canada.[49]
The agreement for India's first nuclear power plant at Rajasthan, RAPP-1, was signed in 1963, followed by RAPP-2 in 1966. These reactors contained rigid safeguards to ensure they would not be used for a military programme. RAPP-1 began operation in 1972. Due to technical problems the reactor had to be downrated from 200 MW to 100 MW.[citation needed]The technical and design information were given free of charge byAtomic Energy of Canada Limitedto India.[citation needed]The United States and Canadaterminated their assistanceafter the detonation of India's first nuclear explosion in 1974.
India fast Breeder Reactor Plans
[edit]India's fast breeder reactor (FBR) program is a crucial part of the nation's strategy to expand its nuclear energy capabilities and ensure energy security. The centerpiece of this program is the Prototype Fast Breeder Reactor (PFBR) located at Kalpakkam, Tamil Nadu. Developed by the Indira Gandhi Centre for Atomic Research (IGCAR), the PFBR is a 500 MW sodium-cooled fast reactor designed to generate more fissile material than it consumes. It aims to produce plutonium-239 from uranium-238 using mixed oxide (MOX) fuel, which is a blend of plutonium-239 and uranium-238.[citation needed]
This technology is pivotal for India's long-term nuclear energy plans, as it allows the country to utilize its vast reserves of thorium and uranium more efficiently. By producing more fissile material than it consumes, the PFBR can significantly extend the life of nuclear fuel resources. Additionally, the success of the FBR program will contribute to India's energy security and sustainability goals, reducing reliance on imported fuels and supporting the country's growing energy needs.[citation needed]
Recent developments
[edit]After successful commissioning of Kudankulam units 1 & 2, an agreement was made with Russia in June 2017 for the units 5 & 6 (2 x 1000 MW) with an estimated cost of INR 250 million (3.85 million US$) per MW.[50][51]Earlier, India had also entered in to an agreement with Russia in October 2016 for the units 3 & 4 (2 x 1000 MW) with an estimated cost of INR 200 million (3.08 million US$) per MW.[50]
Nuclear fuel reserves
[edit]India's domesticuraniumreserves are small and the country is dependent on uranium imports to fuel its nuclear power industry. Since early 1990s,Russiahas been a major supplier of nuclear fuel to India.[52]Due to dwindling domestic uranium reserves,[53]electricity generationfrom nuclear power in India declined by 12.83% from 2006 to 2008.[54]Following awaiverfrom theNuclear Suppliers Group(NSG) in September 2008 which allowed it to commence international nuclear trade,[55]India has signed bilateral deals on civilian nuclear energy technology cooperation with several other countries, includingFrance,[56]theUnited States,[57]theUnited Kingdom,[58]Canada,[59]andSouth Korea.[60]India has also uranium supply agreements with Russia,[61][62]Mongolia,[63]Kazakhstan,[64]Argentina[65]andNamibia.[66]An Indian private company won a uranium exploration contract inNiger.[67]
In March 2011 large deposits of uranium were discovered in theTummalapalle beltinAndhra Pradeshand in theBhima basininKarnatakaby the Atomic Minerals Directorate for Exploration and Research (AMD) of India. The Tummalapalle belt uranium reserves promises to be one of the world's top 20 uranium reserves discoveries. 44,000 tonnes of natural uranium have been discovered in the belt so far, which is estimated to have three times that amount.[68][69][70] The natural uranium deposits of theBhima basinhas better grade of natural uranium ore, even though it is smaller than the Tummalapalle belt.
In recent years, India has shown increased interest in thorium fuels and fuel cycles because of large deposits ofthorium(518,000 tonnes) in the form ofmonazitein beach sands as compared to very modest reserves of low-gradeuranium(92,000 tonnes).[71]
Kazakhstanis the largest supplier of uranium to India providing 5,000 tonnes during 2015–19.[72]Over 15000 tonnes or uranium ore deposits are found in Rajasthan—Rohil, Sikar District[73]
Nuclear agreements with other nations
[edit]As of 2016, India has signed civil nuclear agreements with 14 countries: Argentina, Australia, Canada, Czech Republic, France, Japan, Kazakhstan, Mongolia, Namibia, Russia, South Korea, the United Kingdom, the United States, and Vietnam.[74]The 48-nation NSG granted a waiver to India on 6 September 2008 allowing it to access civilian nuclear technology and fuel from other countries.[75]India is the only country with knownnuclear weaponswhich is not a party to theNon-Proliferation Treaty(NPT) but is still allowed to carry out nuclear commerce with the rest of the world.[76]
India and Mongolia signed a crucial civil nuclear agreement on 15 June 2009 for supply of Uranium to India, during Prime MinisterManmohan Singh's visit to Mongolia making it the fifth nation in the world to seal a civil nuclear pact with India. TheMoUon "development of cooperation in the field of peaceful uses ofradioactivemineralsand nuclear energy "was signed by senior officials in the department of atomic energy of the two countries.[77]
On 2 September 2009, India and Namibia signed five agreements, including one on civil nuclear energy which allows for supply of uranium from the African country. This was signed during PresidentHifikepunye Pohamba's five-day visit to India in May 2009. Namibia is the fifth largest producer of uranium in the world. The Indo-Namibian agreement in peaceful uses of nuclear energy allows for supply of uranium and setting up of nuclear reactors.[66] On 14 October 2009, India and Argentina signed an agreement in New Delhi on civil nuclear cooperation and nine other pacts to establish strategic partnership. According to official sources, the agreement was signed by Vivek Katju, Secretary in the Ministry of External Affairs and Argentine foreign minister Jorge Talana. Taking into consideration their respective capabilities and experience in the peaceful uses of nuclear energy, both India and Argentina have agreed to encourage and support scientific, technical and commercial cooperation for mutual benefit in this field.[78][79]
The Prime Ministers of India and Canada signed a civil nuclear cooperation agreement inTorontoon 28 June 2010 which when all steps are taken, will provide access for Canada's nuclear industry to India's expanding nuclear market and also fuel for India's reactors. Canada is one of theworld's largest exporters of uranium[80]and Canada'sheavy water nuclear technologyis marketed abroad withCANDU-type units operating in India, Pakistan, Argentina, South Korea, Romania and China. On 6 November 2012, India and Canada finalised their 2010 nuclear export agreement, opening the way for Canada to begin uranium exports to India.[81]
On 16 April 2011, India and Kazakhstan signed an inter-governmental agreement for Cooperation in Peaceful Uses of Atomic Energy, that envisages a legal framework for supply of fuel, construction and operation of atomic power plants, exploration and joint mining of uranium, exchange of scientific and research information, reactor safety mechanisms and use of radiation technologies for healthcare. PM Manmohan Singh visited Astana where a deal was signed. After the talks, the Kazakh PresidentNazarbaevannounced that his country would supply India with 2100 tonnes of uranium and was ready to do more. Kazakhstan is the largest producer of uranium in the world. India and Kazakhstan already have civil nuclear cooperation since January 2009 whenNuclear Power Corporation of India Limited(NPCIL) and Kazakh nuclear companyKazAtomPromsigned an MoU during the visit of Nazarbaev to Delhi. Under the contract, KazAtomProm supplies uranium which is used by Indian reactors.[82][83]
South Korea became the latest country to sign a nuclear agreement with India after it got the waiver from the Nuclear Suppliers' Group (NSG) in 2008. On 25 July 2011 India and South Korea signed a nuclear agreement, which will allow South Korea with a legal foundation to participate in India's nuclear expansion programme, and to bid for constructing nuclear power plants in India.[84]
In 2014, India and Australia signed a civil nuclear agreement which allows the export of uranium to India. This was signed in New Delhi duringAustralian Prime MinisterTony Abbott's meeting with theIndian Prime MinisterNarendra Modion 4 September 2014. Australia is the third largest producer of uranium in the world. The agreement allows supply of uranium for peaceful generation of power for civil use in India.[85][86]
India's Prime Minister Narendra Modi and UK Prime Minister David Cameron signed Civil Nuclear Agreement on 12 November 2015.[87]
Reactor agreements
[edit]After theNuclear Suppliers Groupagreed to allow nuclear exports to India, France was the first country to sign a civilian nuclear agreement with India, on 30 September 2008.[88]During the December 2010 visit of theFrench PresidentNicolas Sarkozyto India, framework agreements were signed for thesetting uptwo third-generationEPRreactors of 1650 MW each atJaitapur,Maharashtraby the French companyAreva.The deal caters for the first set of two of six planned reactors and the supply of nuclear fuel for 25 years.[89]Construction has faced regulatory issues and difficulty in sourcing major components from Japan due to India not being a signatory to theNuclear Non-Proliferation Treaty.[90][91]
![](https://upload.wikimedia.org/wikipedia/commons/thumb/3/3e/Kudankulam_Nuclear_Power_Plant_Unit_1_and_2.jpg/220px-Kudankulam_Nuclear_Power_Plant_Unit_1_and_2.jpg)
In April 2021 French group EDF made a binding offer to build six third-generation EPR nuclear reactors at the Jaitapur site, with an installed capacity of 9.6 gigawatts.[92]
In November 2016 Japan signed a nuclear cooperation agreement with India.Japanese nuclear plant builderssaw this as potential lifeline given that domestic orders had ended following theFukushima Daiichi nuclear disaster,and India is proposing to build about 20 new reactors over the next decade.[93]
Russia has an ongoing agreement of 1988 vintage with India regarding establishing of twoVVER1000 MW reactors (water-cooled water-moderated light water power reactors) atKoodankulaminTamil Nadu.[94]A 2008 agreement caters for provision of an additional four third generation VVER-1200 reactors of capacity 1170 MW each.[95]Russia has assisted in India's efforts to design a nuclear plant for itsnuclear submarine.[96]In 2009, the Russians stated that Russia would not agree to curbs on export of sensitive technology to India. A new accord signed in Dec 2009 with Russia gives India freedom to proceed with theclosed fuel cycle,which includesmining,preparationof the fuel for use in reactors, andreprocessingofspent fuel.[97][98]
In October 2018, India and Russia signed an agreement to construct 6 nuclear reactors. Russian state-owned reactor manufacturer Rosatom stated that it would offer its third-generation VVER reactors. The agreement is not a firm contract, but rather an agreement to work toward a firm contract.[99]
The nuclear agreement with the United States led to India issuing aLetter of Intentfor purchasing 10,000 MW from the US. However, liability concerns and a few other issues are preventing further progress on the issue. Experts say that India's nuclear liability law discourages foreign nuclear companies. This law gives accident victims the right to seek damages from plant suppliers in the event of a mishap. It has "deterred foreign players like General Electric and Westinghouse Electric, a US-based unit of Toshiba, with companies asking for further clarification on compensation liability for private operators."[100]On 5 October 2018, India and Russia signed an agreement to construct 6 Russian nuclear reactors in India.[99]
The PHWR fleet of India, in analysis byM.V. Ramana,were constructed, fuelled and continue to operate, close to the price of Indian coal power stations.[101]
Nuclear power plans
[edit]![](https://upload.wikimedia.org/wikipedia/commons/thumb/9/9b/Nuclear_power_percentage.svg/440px-Nuclear_power_percentage.svg.png)
As of 2009, India envisaged to increase the contribution of nuclear power to overall electricity generation capacity from 2.8% to 9% within 25 years.[102] As of 2023, nuclear generated 3.1% of electricity in India, a share which is expected to rise with commissioning of multipleIPHWR-700andVVER-1000reactors. Union Budget FY26 has aimed to launch Nuclear Energy Mission to focusing on R&D of Small Modular Reactors (SMRs), with aim of making at least 5 indigenously developed SMRs, that shall also be known as Bharat Small Reactors (BSRs) operational by 2033. Said initiative aims toenhance domestic nuclear capabilities,promote private sector participation,andaccelerate the deployment of advanced nuclear technologiessuch as Small Modular Reactors (SMRs). As ofJanuary 30, 2025,India’s nuclear capacity is8180 MW.
The Indian nuclear power industry is expected to undergo a significant expansion in the coming years, in part due to the passing of theU.S.-India Civil Nuclear Agreement. This agreement will allow India to carry out trade of nuclear fuel and technologies with other countries and significantly enhance its power generation capacity.[103] When the agreement goes through, India is expected to generate an additional 25 GW of nuclear power by 2020, bringing total estimated nuclear power generation to 45 GW.[104]Further, Union Budget FY26 has proposed to amend Atomic Energy Act and Civil Liability for Nuclear Damage Act to realize goal of at least 100 GW of Nuclear Energy by 2047.
Risks related to nuclear power generation prompted Indian legislators to enact the 2010Nuclear Liability Actwhich stipulates that nuclear suppliers, contractors and operators must bear financial responsibility in case of an accident. The legislation addresses key issues such as nuclear radiation and safety regulations, operational control and maintenance management of nuclear power plants, compensation in the event of a radiation-leak accident, disaster clean-up costs, operator responsibility and supplier liability.[105] A nuclear accident like the 2011Fukushima Daiichi nuclear disasterwould have dire economic consequences in heavily populated India as did the 1984 Union CarbideBhopal disaster,considered among the world's worst industrial disasters.[106]
India has already been using imported enriched uranium for light-water reactors that are currently under IAEA safeguards, but it has developed other aspects of thenuclear fuel cycleto support its reactors. Development of select technologies has been strongly affected by limited imports. Use ofheavy waterreactors has been particularly attractive for the nation because it allows Uranium to be burnt with little to no enrichment capabilities. India has also done a great amount of work in the development of athorium centred fuel cycle. While uranium deposits in the nation are limited there are much greater reserves of thorium and it could provide hundreds of times the energy with the same mass of fuel. The fact that thorium can theoretically be utilised in heavy water reactors has tied the development of the two. A prototype reactor that would burn Uranium-Plutonium fuel while irradiating a thorium blanket is under construction at Kalpakkam byBHAVINI.
Uranium used for theweapons programmehas been separated from the power programme, using uranium from indigenous reserves. This domestic reserve of 80,000 to 112,000 tons of uranium (approx 1% of global uranium reserves) is large enough to supply all of India's commercial and military reactors as well as supply all the needs of India's nuclear weapons arsenal. Currently, India's nuclear power reactors consume, at most, 478 tonnes of uranium per year.[107] Even if India were quadruple its nuclear power output (and reactor base) to 20 GW by 2020, nuclear power generation would only consume 2000 tonnes of uranium per annum. Based on India's known commercially viable reserves of 80,000 to 112,000 tons of uranium, this represents a 40–50 years uranium supply for India's nuclear power reactors (note withreprocessingandbreeder reactor technology,this supply could be stretched out many times over). Furthermore, the uranium requirements of India's Nuclear Arsenal are only a fifteenth (1/15) of that required for power generation (approx. 32 tonnes), meaning that India's domestic fissile material supply is more than enough to meet all needs for it strategic nuclear arsenal. Therefore, India has sufficient uranium resources to meet its strategic and power requirements for the foreseeable future.[107]
![](https://upload.wikimedia.org/wikipedia/commons/thumb/4/4e/PHWR_under_Construction_at_Kakrapar_Gujarat_India.jpg/220px-PHWR_under_Construction_at_Kakrapar_Gujarat_India.jpg)
Former Indian PresidentA. P. J. Abdul Kalamstated while he was in office that, "energy independence is India's first and highest priority. India has to go for nuclear power generation in a big way usingthorium-based reactors.Thorium,a non-fissile material is available in abundance in our country. "[108]India has vastthorium reservesand quite limiteduranium reserves.[109][110]
The long-term goal of India's nuclear program has been to develop an advancedheavy-waterthorium cycle. The first stage of this employs thepressurised heavy water reactors(PHWR) fuelled by natural uranium, andlight water reactors,which produceplutoniumincidentally to their prime purpose of electricity generation. The second stage uses fast neutron reactors burning the plutonium with the blanket around the core having uranium as well as thorium, so that further plutonium (ideally high-fissile Pu) is produced as well as U-233. The Atomic Minerals Directorate (AMD) has identified almost 12 million tonnes ofmonaziteresources (typically with 6-7% thorium). In stage 3,Advanced Heavy Water Reactors(AHWR) would burn thorium-plutonium fuels in such a manner that breeds U-233 which can eventually be used as a self-sustaining fissile driver for a fleet of breeding AHWRs. An alternative stage 3 is molten salt breeder reactors (MSBR), which are believed to be another possible option for eventual large-scale deployment.[74]
In June 2014, Kudankulam-1 became the single largest power generating unit in India (1000 MWe).[111][112]
In January 2021, India's atomic energy secretary K.N. Vyas announced that the 700-megawatt pressurised heavy water reactor of the Kakrapar Atomic Power Station would be the first of the 16 such units planned in the country.[113]
List of nuclear power plants
[edit]![](https://upload.wikimedia.org/wikipedia/commons/thumb/7/7e/Kudankulam_NPP.jpg/220px-Kudankulam_NPP.jpg)
Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
---|---|---|---|---|---|---|---|---|
Chutka | 1 | PHWR | IPHWR-700 | Planned | 630 | (2032) | ||
2 | PHWR | IPHWR-700 | Planned | 630 | (2033) | |||
Gorakhpur | 1 | PHWR | IPHWR-700 | Under construction | 630 | 2022 | (2028) | |
2 | PHWR | IPHWR-700 | Under construction | 630 | 2022 | (2029) | ||
3 | PHWR | IPHWR-700 | Planned | 630 | (2032) | |||
4 | PHWR | IPHWR-700 | Planned | 630 | (2033) | |||
Kaiga | 1 | PHWR | IPHWR-220[114] | Operational | 202 | 1 Sep 1989 | 16 Nov 2000 | |
2 | PHWR | IPHWR-220[114] | Operational | 202 | 1 Dec 1989 | 16 Mar 2000 | ||
3 | PHWR | IPHWR-220[114] | Operational | 202 | 30 Mar 2002 | 6 May 2007 | ||
4 | PHWR | IPHWR-220[114] | Operational | 202 | 10 May 2002 | 20 Jan 2011 | ||
5 | PHWR | IPHWR-700 | Under construction | 630 | 2022 | (2029) | ||
6 | PHWR | IPHWR-700 | Under construction | 630 | 2022 | (2030) | ||
Kakrapar | 1 | PHWR | IPHWR-220[114] | Operational | 202 | 1 Dec 1984 | 6 May 1993 | |
2 | PHWR | IPHWR-220[114] | Operational | 202 | 1 Apr 1985 | 1 Sep 1995 | ||
3 | PHWR | IPHWR-700[115] | Operational | 630 | 22 Nov 2010 | 30 Jun 2023 | ||
4 | PHWR | IPHWR-700[115] | Operational | 630 | 22 Nov 2010 | 31 Mar 2024 | ||
Kalpakkam | 1 | SFR | PFBR[114] | Under commissioning | 490 | 23 Oct 2004 | (2025) | |
Kudankulam | 1 | PWR | VVER-1000/V-412 | Operational | 932 | 31 Mar 2002 | 31 Dec 2014 | |
2 | PWR | VVER-1000/V-412 | Operational | 932 | 4 Jul 2002 | 31 Mar 2017 | ||
3 | PWR | VVER-1000/V-412 | Under construction | 917 | 30 Jun 2017 | (2025) | ||
4 | PWR | VVER-1000/V-412 | Under construction | 917 | 23 Oct 2017 | (2026) | ||
5 | PWR | VVER-1000/V-412 | Under construction | 917 | 29 Jun 2021 | (2029) | ||
6 | PWR | VVER-1000/V-412 | Under construction | 917 | 20 Dec 2021[116] | (2030) | ||
Madras | 1 | PHWR | IPHWR-220[114] | Operation suspended (under maintenance) |
205 | 1 Jan 1971 | 27 Jan 1984 | |
2 | PHWR | IPHWR-220[114] | Operational | 205 | 1 Oct 1972 | 21 Mar 1986 | ||
Mahi Banswara | 1 | PHWR | IPHWR-700 | Planned | 630 | (2031) | ||
2 | PHWR | IPHWR-700 | Planned | 630 | (2032) | |||
3 | PHWR | IPHWR-700 | Planned | 630 | (2033) | |||
4 | PHWR | IPHWR-700 | Planned | 630 | (2034) | |||
Narora | 1 | PHWR | IPHWR-220[114] | Operational | 202 | 1 Dec 1976 | 1 Jan 1991 | |
2 | PHWR | IPHWR-220[114] | Operational | 202 | 1 Nov 1977 | 1 Jul 1992 | ||
Rajasthan | 1 | PHWR | CANDU[114] | Shut down | 90 | 1 Aug 1965 | 16 Dec 1973 | 9 Oct 2004[117] |
2 | PHWR | CANDU[114] | Operational | 187 | 1 Apr 1968 | 1 Apr 1981 | ||
3 | PHWR | IPHWR-220[114] | Operational | 202 | 1 Feb 1990 | 1 Jun 2000 | ||
4 | PHWR | IPHWR-220[114] | Operational | 202 | 1 Oct 1990 | 23 Dec 2000 | ||
5 | PHWR | IPHWR-220[114] | Operational | 202 | 18 Sep 2002 | 4 Feb 2010 | ||
6 | PHWR | IPHWR-220[114] | Operational | 202 | 20 Jan 2003 | 31 Mar 2010 | ||
7 | PHWR | IPHWR-700[115] | Critical | 630 | 18 Jul 2011 | (2025) | ||
8 | PHWR | IPHWR-700[115] | Under construction | 630 | 30 Sep 2011 | (2026) | ||
Tarapur | 1 | BWR | BWR-1 (Mark 2) | Operation suspended (under maintenance) |
150 | 1 Oct 1964 | 28 Oct 1969 | |
2 | BWR | BWR-1 (Mark 2) | Operation suspended (under maintenance) |
150 | 1 Oct 1964 | 28 Oct 1969 | ||
3 | PHWR | IPHWR-540 | Operational | 490 | 12 May 2000 | 18 Aug 2006 | ||
4 | PHWR | IPHWR-540 | Operational | 490 | 8 Mar 2000 | 12 Sep 2005 |
Nuclear electricity generation
[edit]The details of the nuclear power generation capacity in the country are given below:[118]
Fiscal Year | Nuclear electricity generation (GWh) |
Capacity factor |
---|---|---|
2008–09 | 14,921 | 50% |
2009–10 | 18,798 | 61% |
2010–11 | 26,472 | 71% |
2011–12 | 32,455 | 79% |
2012–13 | 32,863 | 80% |
2013–14 | 35,333 | 83% |
2014–15 | 37,835 | 82% |
2015–16 | 37,456 | 75% |
2016–17 | 37,674 | 80% |
2017–18 | 38,336 | 70% |
2018–19 | 37,813 | 70% |
2019–20 | 46,472 | 82% |
2020–21 | 43,029 | 81% |
2021–22 | 47,112 | 88% |
2022–23 | 45,855 | 87% |
2023–24 | 47,971 | 85% |
Anti-nuclear protests
[edit]Following the March 2011Fukushima nuclear disasterinJapan,populations around proposed Indian NPP sites have launched protests that had found resonance around the country.[5]There have been mass protests against the French-backed 9,900 MWJaitapur Nuclear Power ProjectinMaharashtraand the Russian-backed 2,000 MWKoodankulam Nuclear Power PlantinTamil Nadu.TheGovernment of West Bengalinitially refused permission to a proposed 6,000 MW facility near the town ofHaripurthat intended to host 6 Russian reactors.[5][119]But after stiff resistance from locals, the proposed Nuclear Power Plant planned in Haripur has been shifted toKavaliinAndhra Pradesh.[120]Additionally, the Nuclear Power Plant planned at Kovvada, Srikakulam in Andhra Pradesh was shifted from Mithi Virdi inGujaratafter locals in the Western state too showed resistance.[121]
APublic-interest litigation(PIL) has also been filed against the government's civil nuclear program at theSupreme Court.The PIL specifically asks for the "staying of all proposed nuclear power plants till satisfactory safety measures and cost-benefit analyses are completed by independent agencies".[6][122]But the Supreme Court said it was not an expert in the nuclear field to issue a direction to the government on the nuclear liability issue.[123]
See also
[edit]- Economics of nuclear power plants
- Energy policy of India
- Electricity sector in India
- Energy in India
- India's three-stage nuclear power programme
- List of nuclear reactors#India
References
[edit]- ^"Kudankulam nuclear plant begins power generation".Mumbai Mirror.22 October 2013.Retrieved29 January2014.
- ^"India Installed Capacity"(PDF).Archived fromthe original(PDF)on 20 May 2018.Retrieved5 June2018.
- ^"Home".Nuclear Power Corporation of India Limited.Retrieved8 March2022.
- ^"India eyeing 64,000 MW nuclear power capacity by 2032: NPCIL".The Economic Times.11 October 2010.
- ^abcdeSiddharth Srivastava (27 October 2011)."India's Rising Nuclear Safety Concerns".Asia Sentinel.
- ^abRanjit Devraj (25 October 2011)."Prospects Dim for India's Nuclear Power Expansion as Grassroots Uprising Spreads".Inside Climate News.
- ^Pham, Lisa (20 October 2009)."Considering an Alternative Fuel for Nuclear Energy".The New York Times.
- ^"BP Statistical Review of World Energy June 2017"(PDF).BP.Retrieved1 March2018.
- ^"BP Statistical Review of World Energy".BP.Retrieved5 January2020.
- ^"Electricity production by source".
- ^Srinivasan, N. R. (May 1950)."Uranium Minerals of India"(PDF).Current Science.Retrieved25 August2017.
- ^ab"Saha Institute of Nuclear Physics - History".Saha Institute of Nuclear Physics.Retrieved25 August2017.
- ^"Nuclear Physics at the Calcutta University"(PDF).Current Science.May 1948.Retrieved25 August2017.
- ^abc"Homi J. Bhabha (1909-1966)"(PDF).Indian National Science Academy.Retrieved25 August2017.
- ^Krishnan, R. S. (August 1945)."Atomic Energy"(PDF).Current Science.Retrieved20 February2017.
- ^ab"University of Travancore - Council of Research"(PDF).Current Science.March 1946.Retrieved25 August2017.
- ^"Atomic Research - Science Notes and News"(PDF).Current Science.April 1947.Retrieved25 August2017.
- ^"Uranium Unit of the Geological Survey - Science Notes and News"(PDF).Current Science.March 1947.Retrieved26 August2017.
- ^"Atomic Energy Research - Science Notes and News"(PDF).Current Science.June 1947.Retrieved25 August2017.
- ^"Atomic Energy in India - Science Notes and News"(PDF).Current Science.April 1948.Retrieved25 August2017.
- ^"Nuclear Physics at the Calcutta University - Science Notes and News"(PDF).Current Science.May 1948.Retrieved2 September2017.
- ^"Department of Scientific Research - Science Notes and News"(PDF).Current Science.August 1948.Retrieved25 August2017.
- ^"Atomic Energy Commission - Science Notes and News"(PDF).Current Science.March 1949.Retrieved3 September2017.
- ^"Government to Purchase Uranium Stocks - Science Notes and News"(PDF).Current Science.August 1950.Retrieved3 September2017.
- ^"Rewards for Discovery of Uranium and Beryl Ores - Science Notes and News"(PDF).Current Science.May 1950.Retrieved3 September2017.
- ^abcLal, Sham, ed. (1978).The Times of India Directory & Year Book, Including Who's Who: 1978.Times of India Press. pp.149–153.
- ^"Editorial".The Bombay Technologist.7(1): 3. 1 February 1957.ISSN0067-9925.Retrieved12 June2020.
- ^"Rajya Sabha Debates (1961) - Proposal to amend the Atomic Energy Act"(PDF).Government of India. 13 December 1961.Retrieved22 June2018.
- ^"Rajya Sabha Debates (1962) - THE ATOMIC ENERGY BILL, 1962"(PDF).Government of India. 30 August 1962.Retrieved22 June2018.
- ^abc"India's First Atomic Reactor - Science Notes and News"(PDF).Current Science.August 1956.Retrieved3 September2017.
- ^"Agreement with U.K. on Atomic Energy"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^"Research Reactors in BARC:Bhabha Atomic Research Centre(BARC), Department of Atomic Energy,Government of India".barc.gov.in.
- ^"Apsara Research Reactor".Archived fromthe originalon 19 April 2015.Retrieved12 April2015.
- ^"Canadian Offer of Atomic Reactor"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^abExporting Disaster ~ The Cost of Selling CANDU Reactors (3).Ccnr.org. Retrieved on 6 December 2013.
- ^abFuhrmann, Matthew (24 July 2012).Atomic Assistance: How "Atoms for Peace" Programmes Cause Nuclear Insecurity.Texas: Cornell University Press. pp.93–95.ISBN978-0801478116.
- ^ab"Agreement on the Canada-India Colombo Plan Atomic Reactor Project"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^"Atomic Research for Peaceful Uses"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^"Canada-India Colombo Plan Atomic Reactor"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^ab"Nuclear Power Station Survey: Canada-India Joint Survey"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^"Atomic Research for Asian Welfare"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^"Rajya Sabha Debates (1955) - Atomic Power Station"(PDF).Government of India. 7 September 1955.Retrieved21 June2018.
- ^"Rajya Sabha Debates (1955) - Indian Experts' Visit to Russian Atomic Plant"(PDF).Government of India. 28 September 1955.Retrieved21 June2018.
- ^"Rajya Sabha Debates (1957) - Setting up of an Atomic Reactor at Ahmedabad"(PDF).Government of India. 12 September 1957.Retrieved21 June2018.
- ^"Rajya Sabha Debates (1958) - Atomic Power Stations to be set up in India"(PDF).Government of India. 27 November 1958.Retrieved22 June2018.
- ^"Atomic Power Stations"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^"Rajya Sabha Debates (1963) - Installation of Atomic Power Station in Punjab"(PDF).Government of India. 23 April 1963.Retrieved2 July2018.
- ^"India's First Atomic Power Station - Global Tenders Invited"(PDF).Press Information Bureau of India - Archive.Archived(PDF)from the original on 8 August 2017.
- ^"Rajya Sabha Debates (1962) - Tarapur Atomic Power Project"(PDF).Government of India. 16 August 1962.Retrieved22 June2018.
- ^ab"Units 5, 6 at Kudankulam nuclear power plant to cost Rs 50000-crore".The Times of India.2 June 2017.Retrieved1 July2017.
- ^"Recalling Kudankulam's Bumpy Ride as Reactor 2 Comes On".Retrieved31 July2017.
- ^"Russia fulfills promise, supplies uranium to India".The Indian Express.Indian Express Limited.Archived fromthe originalon 19 February 2009.Retrieved22 August2010.
- ^"Uranium shortage holding back India's nuclear power drive - Corporate News".livemint.com.30 June 2008.Retrieved22 August2010.
- ^"Ministry of Power".Powermin.gov.in.Archived fromthe originalon 18 March 2011.Retrieved22 August2010.
- ^"news.outlookindia.com".Outlook India.Archived fromthe originalon 22 September 2008.Retrieved22 August2010.
- ^"India, France agree on civil nuclear cooperation".Rediff.com.Retrieved22 August2010.
- ^"Bush signs India-US nuclear deal into law - Home".livemint.com.9 October 2008.Retrieved22 August2010.
- ^"UK, India sign civil nuclear accord".Reuters. 13 February 2010.Retrieved22 August2010.
- ^"Canada, India reach nuclear deal".Montreal Gazette.29 November 2009.Retrieved22 August2010.
- ^"India, South Korea ink civil nuclear deal".The Times of India.25 July 2011.Archivedfrom the original on 5 November 2012.
- ^"India to get 510 tonnes of uranium from Kazakhstan, Russia".Hindu Business Line. Archived fromthe originalon 8 December 2010.Retrieved22 October2010.
- ^"South Asia | Russia agrees India nuclear deal".BBC News. 11 February 2009.Retrieved22 August2010.
- ^"India, Kazakhstan sign nuclear pact".The Financial Express.16 September 2009.
- ^Sanjay Dutta (23 January 2009)."Kazakh nuclear, oil deals hang in balance".The Times of India.Retrieved22 August2010.
- ^India, Argentina ink agreement on peaceful uses of N-energy,The Hindu
- ^ab"India, Namibia sign uranium supply deal".Republikein Online.2 September 2009. Archived fromthe originalon 22 July 2011.Retrieved21 August2011.
- ^"Indian firm acquires uranium mining rights in Niger | Uranium, Niger, Company, Bajla, Government".taurianresources.co.in.Archived fromthe originalon 11 May 2011.Retrieved22 December2010.
- ^Subramanian, T. S. (20 March 2011)."Massive uranium deposits found in Andhra Pradesh".The Hindu.Chennai, India. Archived fromthe originalon 24 October 2012.Retrieved8 August2016.
- ^Thakur, Monami (19 July 2011)."Massive uranium deposits found in Andhra Pradesh".International Business Times.USA.
- ^Bedi, Rahul (19 July 2011)."Largest uranium reserves found in India".The Daily Telegraph.New Delhi, India.Archivedfrom the original on 12 January 2022.
- ^http://www-pub.iaea.org/MTCD/publications/PDF/TE_1450_web.pdf[bare URL PDF]
- ^Laskar, Rezaul H (25 April 2019)."'We may scale up supply of uranium to India': Kazakhstan ambassador Bulat Sarsenbayev ".Hindustan Times.Retrieved27 April2019.
- ^"Over 15000 tonnes of uranium ore deposits in Rajasthan".The Economic Times.27 July 2022.
- ^ab"Nuclear Power in India".world-nuclear.org.Retrieved4 May2017.
- ^"Dateline Vienna: Thirty words that saved the day".Siddharth Varadarajan. 8 September 2008.Retrieved1 October2012.
- ^"AFP: India energized by nuclear pacts".1 October 2008. Archived fromthe originalon 20 May 2011.Retrieved2 October2008.
- ^Bureau (15 September 2009)."India signs civil nuclear deal with Mongolia".The Financial Express.Retrieved13 August2011.
{{cite news}}
:|author=
has generic name (help) - ^Chatterjee, Amit Kumar (30 October 2009)."Argentina -India's seventh nuclear destination".Institute of Peace and Conflict Studies.Retrieved21 August2011.
- ^"India signs N-pact with Argentina".OneIndia (online).14 October 2009.Retrieved21 August2011.
- ^Sinha, Mohnish (6 April 2010)."Indo-Canada Nuclear Accord".IndiaStand. Archived fromthe originalon 26 July 2011.Retrieved21 August2011.
- ^"India and Canada finalise conditions of nuclear deal".BBC News. 6 November 2012.Retrieved18 November2012.
- ^"India, Kazakhstan ink civil nuclear cooperation deal".The Times of India.17 April 2011.Archivedfrom the original on 22 September 2012.Retrieved21 August2011.
- ^"India, Kazakh ink nuke and oil pacts".The Indian Express.16 April 2009.Retrieved21 August2011.
- ^Sriniwas, Laxman (26 July 2011)."India & South Korea Sign Civil Nuclear Agreement".Asian Scientist (online).Retrieved21 August2011.
- ^"India and Australia seal nuclear deal, Abbott meets Modi".The Times of India.Retrieved6 September2014.
- ^"Australia to power India's energy market as Tony Abbott settles terms for uranium trade".The Sydney Morning Herald.4 September 2014.Retrieved6 September2014.
- ^"India signs civil nuclear agreement with Britain".The Times of India.12 November 2015.
- ^Samanta, Pranab Dhal (1 October 2008)."India, France ink nuclear deal, first after NSG waiver".The Indian Express.Retrieved21 August2011.
- ^Yep, Eric & Jagota, Mukesh (6 December 2010)."Areva and NPCIL Sign Nuclear Agreement".The Wall Street Journal - Business (online).Archivedfrom the original on 30 November 2012.Retrieved21 August2011.
- ^Makarand Gadgil (29 November 2011)."Jaitapur nuclear plant work may not start before 2014".livemint.com.The Wall Street Journal.Retrieved29 November2011.
- ^Yadav, Kamal (5 August 2024)."India ready to add 21 new nuclear reactors to meet its growing power demands".TechArctic.
- ^"France's EDF makes binding offer to build six nuclear EPR reactors in India Reuters".Reuters.
- ^Jonathan Soble (11 November 2016)."Japan's Nuclear Industry Finds a Lifeline in India After Foundering Elsewhere".The Japan Times.Retrieved17 November2016.
- ^George, Nirmala (21 June 1998)."Moscow Ends Atomic Power Blockade to India".The Indian Express.Retrieved21 August2011.
- ^Sasi, Anil (12 October 2008)."NPCIL to go into details with 4 reactor suppliers".The Hindu (Business Online).Retrieved21 August2011.
- ^"Russia: Nuclear Exports to India".NTI. 2010. Archived fromthe originalon 10 May 2011.Retrieved21 August2011.
- ^"India, Russia sign nuclear deal".The Times of India.7 December 2009.Archivedfrom the original on 22 September 2012.Retrieved21 August2011.
- ^Bagchi, Indrani (20 August 2011)."Keep your word, we will keep ours, India tells NSG (pg 1)".The Times of India.Archivedfrom the original on 22 September 2012.Retrieved21 August2011.
- ^ab"Russia signs pact for six nuclear reactors on new site in India".Reuters. 5 October 2018.Retrieved28 March2019.
- ^"India's nuclear plans losing steam; Anti-nuclear protests hinder plans to ramp up power generation".Power Engineering.27 February 2012.[permanent dead link ]
- ^"iei-asia.org".iei-asia.org.
- ^"Slowdown not to affect India's nuclear plans".Business Standard.21 January 2009.Retrieved21 August2011.
- ^http://www.ptinews.com/pti%5Cptisite.nsf/0/E696AFE1CBD8BA4C652574A600103BE1?OpenDocument[dead link ]
- ^"At G-8, Singh, Bush reaffirm commitment to nuclear deal".livemint.com.10 July 2008.Retrieved22 August2010.
- ^"Lessons from Japan for India on Nuclear Energy".The Diplomat.13 December 2013.
- ^"India ratifies, at last, a nuclear deal with the IAEA".The Economist.28 June 2014.
- ^abCarnegie Endowment for International Peace[bare URL PDF]
- ^"Thorium Reactors Integral To Indian Energy Independence".The Energy Daily.8 May 2007.
- ^Rahman, Maseeh (1 November 2011)."How Homi Bhabha's vision turned India into a nuclear R&D leader".The Guardian.Mumbai.Retrieved20 March2012.
- ^"A future energy giant? India's thorium-based nuclear plans".Physorg.com. 1 October 2010.Retrieved20 March2012.
- ^"Performance Audit Report on Kudankulam Nuclear Power Project, Units I and II"(PDF).Retrieved29 December2017.
- ^"Kudankulam Unit-1 hits full capacity at 1,000 MWe".The Indian Express.8 June 2014.Retrieved19 June2014.
- ^India debuts largest nuclear reactor with more planned,Hindustan Times,19 January 2021.
- ^abcdefghijklmnopq"Status report 74 – Indian 220 MWe PHWR (IPHWR-220)"(PDF).
- ^abcd"Status report 105 – Indian 700 MWe PHWR (IPHWR-700)"(PDF).
- ^"В Индии началось сооружение блока № 6 АЭС" Куданкулам "".ase-ec.ru(in Russian).Retrieved21 December2021.
- ^"PRIS – Reactor Details".
- ^"Nuclear Power Generation".Retrieved29 October2019.
- ^Harvey, Fiona(8 March 2012)."Dramatic fall in new nuclear power stations after Fukushima".The Guardian.London.
- ^"Andhra Pradesh to get another nuclear plant".Deccan Chronicle.22 September 2018.Retrieved1 October2018.
- ^"Gujarat's Mithivirdi nuclear power plant to be shifted to Andhra Pradesh due to delay in land acquisition -".Firstpost.2 June 2017.Retrieved1 October2018.
- ^Siddharth Srivastava (27 October 2011)."India's Rising Nuclear Safety Concerns".Asia Sentinel.Archived fromthe originalon 4 October 2013.Retrieved29 October2011.
- ^"SC steers clear of PIL on N-liability".The Times of India.6 December 2011. Archived fromthe originalon 21 October 2012.