Ranjiaba station
Ranjiaba Nhiễm gia bá | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||
Location | Chongqing China | |||||||||||||||||||||||||
Operated by | Chongqing Rail Transit Corp., Ltd | |||||||||||||||||||||||||
Line(s) | Line 5 Line 6 Loop line | |||||||||||||||||||||||||
Platforms | 6 (2 island platforms and 2 side platforms) | |||||||||||||||||||||||||
Connections | Bus | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Structure type | Underground | |||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||
Station code | Hoàn /11,5/08,6/15 | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opened | 20 January 2013 (Line 6) 28 December 2017 (Line 5) 28 December 2018 (Loop Line) | |||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
|
Ranjiabais astationonLine 5,Line 6,and theLoop LineofChongqing Rail Transitin Chongqing Municipality, China.[1][2]It is located inYubei Districtand serves its surrounding area, including nearby office towers, residential blocks and a mall.
It opened on January 20, 2013, with Line 6. Line 5 services were later added on December 28, 2017. The station expanded exactly one year later with the opening of the Loop Line section of the station on December 28, 2018.
Station structure
[edit]A total of 2island platformsare used for Line 5 and Line 6 trains travelling in both directions. These 2 platforms were designed withcross-platform interchangein mind and were built during the construction of Line 6. Spaces on the opposite end of the platforms were reserved for Line 5 at the time and came into use when the metro line became operational in 2017.
There are 2side platformsfor Loop Line trains.
B3 Concourse |
Exits, Customer service, Vending machines |
B4 Platforms |
Line 6toBeibei(Guangdianyuan) |
Island platform | |
Line 5toYuegangbeilu(Xingfu Square) | |
B5 Platforms |
Line 6toChayuan(Dalongshan) |
Island platform | |
Line 5toTiaodeng(Dalongshan) | |
B6 Platforms |
Side platform |
Loop linecounterclockwise loop(Sports Park) | |
Loop lineclockwise loop(Dongbu Park) | |
Side platform |
References
[edit]