Ravensthorpe Nickel Mine
Location | |
---|---|
Location | Ravensthorpe |
State | Western Australia |
Country | Australia |
Coordinates | 33°38′42″S120°23′49″E/ 33.645°S 120.397°E |
Production | |
Products | Mixednickel-cobalthydroxide |
Production | 21,725 (contained tonnes)[1] |
Financial year | 2023 |
History | |
Opened | 2008 |
Active | 2008–2009, 2011–2017, 2020– |
Owner | |
Company | First Quantum Minerals(70%) POSCO(30%) |
Website | First Quantum Minerals |
Year of acquisition | 2010 |
TheRavensthorpe Nickel Mineis anickelmine and hydrometallurgical processing plant located at Bandalup Hill, 35 km (22 mi) east ofRavensthorpe, Western Australia.
Built byBHP Billiton,it was closed in January 2009, after less than a year of operation due to a collapse in the price of nickel. It was sold in December 2009 toFirst Quantum Mineralswho reopened the mine in December 2011, after 18 months of modifications and re-commissioning. Following a period of low nickel prices, the operation was placed oncare and maintenancein October 2017. Production recommenced in January 2020 withPOSCOpurchasing a 30% shareholding in May 2021.
History
[edit]Mining inRavensthorpeconsiderably predates the current nickel mine, with gold discoveries dating back to 1898.[2]The town experienced a down turn afterWorld War Ibut mining for copper continued up until the 1970s.[3]Arailway lineconnected Ravensthorpe with the port ofHopetounfrom 1901 to 1925, when the line was closed.[4]
BHP Billitoncommenced a feasibility study in 2002 into opening anickelandcobaltmine and processing plant at the cost of A$1.4 billion[5]35 km (22 mi) east of the town of Ravensthorpe.
The project was approved in 2004 and construction commenced shortly afterward. The plant known as the Ravensthorpe Nickel Project was commissioned in late 2007 with first production occurring in October and the first 5,000 tonnes being produced by December 2007.[6]The plant was officially opened in 2008, after massive cost blow outs and delays. Production was expected to total 50,000 tonnes of nickel per year.[7]
In January 2009, BHP Billiton announced that it was suspending production at the Ravensthorpe Nickel Mine indefinitely due to the reduction in world nickel prices caused by theglobal economic crisis.The decision cut 1,800 jobs and was expected to have a major impact on the local economy.[8]Nickel prices, having reached a high of US$50,000 per tonne in May 2007, had fallen to under $11,000 per tonne by the time of the mine's closure.[9]The closure had a devastating effect on the local communities of Ravensthorpe and Hopetoun and led to BHP Billiton being heavily criticised for its handling of the closure.[10]
On 9 December 2009, BHP Billiton announced it had agreed terms to sell the mine toFirst Quantum Mineralsfor US$340 million.[11]First Quantum was one of three bidders for the mine and actually produced the lowest offer. First Quantum won the bid despite offers fromMinara Resourcesat US$360 million and Poseidon Nickel at US$400 million being higher than theirs.[12]BHP Billiton said that the lower price was accepted due to fewer conditions being imposed by the tenderer.[13]The sale was completed on 10 February 2010.[14]
First Quantum Minerals spent eighteen months implementing extensive modifications to improve the ore processing at the front end of the plant, through the construction of two new crushers, new product storage ponds and a new dewatering facility.[15]Recommissioning began in the second quarter of 2011, with first nickel produced in October 2011. Problems BHP faced in the crushing, beneficiation and rejects plants were successfully resolved.[16]
Production resumed in January 2020 with First Quantum Minerals selling a 30% shareholding in the mine toPOSCOin May 2021.[17][18][19]
In January 2024, mining was suspended and 30% of the 420 workforce lost their jobs as a result of weak nickel prices. Processing of existing stockpiles would however continue, which could take up to two years to complete, after which mining is scheduled to resume.[20]
In April 2024, RNO announced they would be closing down operations and going into Care and Maintenance for the fourth time, cutting down a further estimated 330 jobs.
Mineral reserves
[edit]The project comprises five ore bodies, Halleys, Hale-Bopp, Shoemaker-Levy, Nindilbillup and Shoemaker-Levy North, with totalproven and probable reservesof 197.2 million tonnes at a grade of 0.6% nickel and 0.03% cobalt (at 31 December 2017). Shoemaker-Levy, the largest ore body, contains 88% of the reserves.[21]
First Quantum expected an annual production of 39,000 tonnes of nickel for the first five years of production and an average of 28,000 tonnes per year for the mine's projected lifetime of 32 years.[13]The operation was placed oncare and maintenancein October 2017 due to sustained nickel prices below the cost of production.[22]
Commercial production by First Quantum Minerals was achieved on 28 December 2011.[23]The operation produced 32,884 tonnes of nickel in its first full year of operation in 2012.[24][25]BHP Billiton, by comparison, produced 14,000 tonnes of nickel from the operation in the nine months the plant operated from its opening in May 2009 before it was mothballed.[26]Citing extended low nickel prices, First Quantum Minerals placed the plant in care and maintenance in October 2017, and most of the staff were made redundant. A small team of maintenance personnel continued to keep the site up. In April 2019 the owner announced that "should market conditions continue to improve, Ravensthorpe could resume operation in the first quarter of 2020."[27]
In 2021, the mine produced 16,818 contained tonnes of nickel (14,018 payable tonnes).[28]
Atmospheric leach tank collapse
[edit]On 14 December 2014 a structural failure was caused by corrosion of an atmospheric leach tank's wall, with the subsequent spill contained in the plant's bunded, or protected, area.[29]Nearly 2 Ml (2,000 m3) of acidic slurry exited the tank displacing several transformers and inundated electrical substations and steam turbine generators. Operations at the plant were suspended by theDepartment of Mines & Petroleum.The accident closed the mine for 49 days. The plant operator pleaded guilty to failing to supply a safe working environment and received a fine of A$40,000.[30]
References
[edit]- ^"Ravensthorpe Production Statistics".www.first-quantum.com.First Quantum Minerals.Retrieved27 February2024.
- ^Archer, A (1979),Ravensthorpe: then and now,Imperial Printing Co,retrieved21 March2023
- ^MiningArchived12 November 2009 at theWayback MachineShire of Ravensthorpe website, accessed: 10 December 2009
- ^HopetounSydney Morning Herald,published: 8 February 2004, accessed: 10 December 2009
- ^"BHP Sustainability Report - Relationship building".2005. Archived fromthe originalon 21 July 2008.Retrieved10 December2009.
- ^"BHP Billiton - Nickel West".2008.Retrieved15 September2008.
- ^"Sydney Morning Herald - BHP ready for laterite challenge".The Sydney Morning Herald.20 May 2008.Retrieved10 December2009.
- ^Mining job losses escalate as BHP Billiton cuts 6000The Australian, 21 January 2009
- ^BHP Ravensthorpe nickel mine on brink of closurePerth.now.com.au, published: 18 January 2009, accessed: 10 December 2009
- ^Ravensthorpe nickel mine saleABC News,published: 10 December 2009, accessed: 10 December 20
- ^Sale of Ravensthorpe Nickel Operation, Western AustraliaBHP Billiton9 December 2009
- ^Canada's First Quantum wins bid to revive Ravensthorpe nickel mineThe Australian,published: 10 December 2009, accessed: 10 December 2009
- ^abFirst Quantum announcement on the purchase of the mineArchived17 June 2011 at theWayback Machinepublished: 9 December 2009, accessed: 10 December 2009
- ^First Quantum Minerals Announces Finalization of the Acquisition of the Ravensthorpe Nickel Operation, Western AustraliaArchived17 June 2011 at theWayback MachineFirst Quantum news releases, published: 10 February 2010, accessed: 4 June 2010
- ^Piper, Dominic (April 2012). "Ravensthorpe: From white elephant to resurrection".Australia's Paydirt.
- ^Fitzgerald, Barry (10 November 2011). "First Quantum in Nickel coup".The West Australian.
- ^Ravensthorpe reopens on nickel surgeAustralian Mining Review22 January 2020
- ^First shipment marks progress for Ravensthorpe Nickel Mine restartEsperance Express23 January 2020
- ^First Quantum Minerals Announces Sale of 30% of Ravensthorpe Nickel for $240 MillionFirst Quantum Minerals 19 May 2021
- ^Jarrod Lucas (15 January 2024)."Ravensthorpe nickel mine to cut 30 per cent of workforce as mining suspended amid weaker metal prices".ABC Goldfields.Retrieved27 February2024.
- ^"Reserves & Resources".Vancouver: First Quantum Minerals.Retrieved11 May2019.
- ^Attwood, James; Stringer, David (10 August 2017)."WA's Ravensthorpe mine closes on low nickle [sic] price, threatening 300 jobs ".WAtoday.Perth, WA: Fairfax Media.Retrieved25 May2018.
- ^"First Quantum Minerals Reports Operational and Financial Results for the Three Months and Year Ended December 31, 2011".Vancouver: First Quantum Minerals. 6 March 2012.Retrieved11 May2019.
- ^First Quantum Minerals Announces 2012 Production and 2013 Outlookpublished by First Quantum Minerals, 28 February 2013
- ^First Quantum Minerals Announces 2012 Production and 2013 Outlook
- ^Chambers, Matt."High-achieving First Quantum chief Philip Pascall keeps a low profile".The Australian.Retrieved28 February2013.
- ^McKinnon, Stuart (1 May 2019)."Ravensthorpe nickel mine readied for restart as prices rise".The West Australian.Perth, WA.Retrieved11 May2019.
- ^Full Year 2021 ProductionFirst Quantum Minerals
- ^Bell, Stephen (15 December 2015)."WA's Ravensthorpe nickel mine shut after chemical spill".The Australian.Retrieved11 May2019.
- ^Topf, Andrew (2 January 2017)."First Quantum dinged $40,000 for sulphuric acid spill at nickel mine".Mining.com.Retrieved11 May2019.