Jump to content

Rhymney line

From Wikipedia, the free encyclopedia
Rhymney line
Overview
OwnerTransport for Wales[1]
LocaleRhymney Valley
Termini
Service
TypeHeavy rail
SystemNational Rail
Operator(s)Transport for Wales Rail
Rolling stock
Technical
Line length22miles61chains(36.6 km)[2]
Number of tracks
with a passing loop at Tir-Phil
Track gauge1,435 mm(4 ft8+12in)standard gauge
Route map

(Click to expand)
Rhymney
Pontlottyn
Tir-Phil
Brithdir
Bargoed
Gilfach Fargoed
Pengam
Hengoed
Ystrad Mynach
Llanbradach
Energlyn & Churchill Park
Aber
Caerphilly
Caerphilly Tunnel
Cefn Onn
closed
1986
Lisvane & Thornhill
Llanishen
Heath High Level
Roath Park
proposed
Crwys Road
proposed
Cardiff Queen Street
Cardiff Central

TheRhymney lineis acommuter rail linerunning fromCardiff Centralthrough theRhymney valleyviaHeathandLlanishenin the north of the city, toCaerphilly,BargoedandRhymney.

History[edit]

The name comes from the fact that the original line was part of theRhymney Railway's system.

The line is currently operated byTransport for Wales Rail Servicesas part of theValley Linesnetwork. TfW replaced the previousfranchise,Arriva Trains Walesin October 2018.

In March 2007 the latest in a series of infrastructure improvements on the Valley Lines was announced, which included lengthening of platforms between Rhymney andPenarthto allowClass 150units to operate in multiples of 3 (6 cars). However, this is postponed indefinitely due to the sub-lease by theDepartment for Transport,toGreat Western Railway,of the units that would have allowed this extra capacity.

Service[edit]

The line currently has a 15-minute daytime headway between Bargoed and Cardiff, with most journeys terminating at Barry Island or Bridgend. Prior to re-signalling early in 2006, a 20-minute headway was operated. North of Bargoed, two trains per hour runs over the single track, including the passing loop at Tir-Phil, to Rhymney. The Sunday service operates over the entire length of the line every 1 hour since 2019, though this now runs all the day since Dec 2005. There are six trains running between Caerphilly and Cardiff since 2024. Any trains that starts the journey from Caerphilly will terminate at Penarth.

Rolling stock[edit]

Current stock comprisesClass 150andClass 231units.

Some peak hour and Saturday services were formed of one Class 37/4 locomotive and fourMk. 2Fcarriages. Two locomotives received special heritage repaints into 1960s BR Green livery (no. 37411) or 1980sBR Blue Large Logolivery (no. 37425) to mark the end of locomotive-hauled trains. Two Class 37s (nos. 37425 and 37408) were involved in a runaway situation and collided at Rhymney Sidings on 30 July 2005. Number 37408 was withdrawn, and replaced by previously stored no. 37419. Number 37425 was repaired, but whilst it was out of traffic,Class 47locomotives were hired fromRiviera Trainsas cover. Class 37-hauled trains finished on 10 December 2005, however in the new year Arriva received complaints from commuters about comfort and over-crowding, so reinstated a Monday to Friday diagram, operating a morning train into Cardiff, and an evening train back to Rhymney, usually using 37410. With the December 2006 timetable change this service reverted to DMU, and with Arriva Trains Wales said to be disposing of its loco hauled stock, it would appear as though the end of loco haulage on the line has finally come. This service is now operated with Transport For Wales since 2018.

Loco-hauled stock hauled by Class 37s returned between June 2019 and March 2020.[3][4]

Electrification of the line[edit]

On 16 July 2012 plans to electrify the line were announced by the UK Government. The announcement was made as an extension of the electrification of theSouth Wales Main Linefrom Cardiff to Swansea and the electrification of the south WalesValley Linesat a total cost of £350 million. The investment will require new trains and should result in reduced journeys times and a cheaper to maintain network.

Work was expected to start between 2014 and 2019, but was then pushed back to between 2019 and 2024.[5][6]Preliminary re-signalling work on the route, which saw the remaining manualsignal boxesat Heath, Ystrad Mynach and Bargoed abolished in favour of remote control from the new Cardiff Rail Operating Centre, was completed in early September 2013.[7]

In addition, a new station atEnerglyn & Churchill Parkin Caerphilly was opened on 16 December 2013, with trains running from there since 8 December.[8]

However, as part of Welsh Government'sSouth Wales Metrothis line has been taken over,[9]and will soon be electrified[10]in preparation for newClass 756rolling stock.[11]

See also[edit]

References[edit]

  1. ^"Impact of Core Valley Lines divestment on the Wales & Western region"(PDF).orr.gov.uk.Retrieved23 April2022.
  2. ^Yonge, John; Padgett, David (August 2010) [1989]. Bridge, Mike (ed.).Railway Track Diagrams 3: Western(5th ed.). Bradford on Avon: Trackmaps. map 28B.ISBN978-0-9549866-6-7.
  3. ^"Locomotive-hauled trains to cover Welsh stock shortfall".
  4. ^"TfW withdraws '37s' to Rhymney".www.modernrailways.com.Retrieved2 December2023.
  5. ^"Rail electrification to Swansea and south Wales valleys welcomed".BBC News.16 July 2012.
  6. ^"Cardiff And Valleys Station Upgrades".Network Rail.16 May 2018. Archived fromthe originalon 17 May 2018.Retrieved16 May2018.
  7. ^The Signal Box forum – Cardiff Rymney Valley resignallingwww.signalbox.org; Retrieved 12 September 2013
  8. ^"Energlyn & Churchill Park train station receives official opening".Caerphilly Observer. 16 December 2013.Retrieved17 December2013.
  9. ^"Impact of Core Valley Lines divestment on the Wales & Western region"(PDF).orr.gov.uk.Retrieved23 April2022.
  10. ^"Core Valley Lines Transformation | Transport for Wales".tfw.wales.Retrieved23 April2022.
  11. ^"Transport for Wales: meet the fleet".Railcolornews.Retrieved23 April2022.