Jump to content

Taichung HSR station

Coordinates:24°06′42″N120°36′58″E/ 24.1117°N 120.6161°E/24.1117; 120.6161
From Wikipedia, the free encyclopedia
Taichung

Đài trung
Taiwan High Speed Rail
THSRrailway station
Chinese name
Traditional ChineseĐài trung
Transcriptions
Standard Mandarin
Hanyu PinyinTáizhōng Gāotiě Zhàn
Bopomofoㄊㄞˊ ㄓㄨㄥ
Hakka
Romanization
Southern Min
Tâi-lôTâi-tiong
General information
Location8 Zhanqu 2nd Rd
Wuri District,Taichung
Taiwan
Coordinates24°06′42″N120°36′58″E/ 24.1117°N 120.6161°E/24.1117; 120.6161
Line(s)
Distance165.6 km[1]
Connections
Construction
Structure typeElevated
Other information
Station codeTAC/07
Websitewww.thsrc.com.tw/en/StationInfo/Prospect/4b80429e-2b1a-429d-93ab-6870d49cab03
History
Opened2007-01-05[2]
Passengers
201822.115 million per year[3]Increase5.45%
Rank2 out of 12
Services
Preceding station Taiwan High Speed RailTaiwan High Speed Rail Following station
Miaoli
towardsNangang
THSR Changhua
towardsZuoying
Location
Taichung is located in Taiwan
Taichung
Taichung
Location within Taiwan
HSR Taichung station

119 cao thiết đài trung trạm
General information
LocationWuri,Taichung
Taiwan
Operated by
Line(s)
Platforms2 side platforms
Construction
Structure typeAt grade
Other information
Station code119
History
Opened25 April 2021(2021-04-25)
Services
Preceding station Taichung Metro Following station
Terminus Green line Wuri

TaichungHSR (Chinese:Đài trung cao thiết trạm;pinyin:Táizhōng Gāotiě Zhàn) is a railway and metro station inWuri District,Taichung, Taiwan.It is served byTaiwan High Speed Railand theGreen Lineof theTaichung Metro.The station is adjacent toXinwuri StationofTaiwan Railway Administration.[4]

History

[edit]

The station is elevated and has twoisland platforms.Since all services stop at this station, the passing tracks located between platforms are rarely used to connect trains with the depot to the south. The station has a total area of 12 hectares (120,000 m2).[5]

The design of the station was carried out by HOY Architects, aTaipeibased firm.[6]Construction took four years and took $5 billion NTD, making it the most expensive station at the time of its opening.[7]

Prior to the opening ofMiaoli,ChanghuaandYunlinHSR stations in December 2015, this was the only operational high speed rail station in Central Taiwan.

Utilization status

[edit]

Due to the location of Taichung HSR station, not only can the station service residents ofTaichung,but it can also service those living in the northern part ofChanghua Countyin centralChanghua.In addition, the development of Taichung has become increasingly prosperous in recent years. Since 2011, the number of passengers enter/exiting from Taichung HSR station has surpassed the number of passengers enter/exiting fromZuoying HSR station,and its growth continues to accelerate.

Platform layout

[edit]
1
2
1A
1B
Taiwan High Speed Rail (Southbound) TowardChiayi,Tainan,Zuoying
3
4
Taiwan High Speed Rail
(Passing tracks)
5
6
2A
2B
Taiwan High Speed Rail (Northbound) TowardHsinchu,Taoyuan,Taipei

Station layout

[edit]
3F Platform1A THSRtowardZuoying(Changhua)
Island platform
Platform1B THSRtowardZuoying(Changhua)
Passing track THSRthrough service
Passing track THSRthrough service
Platform2A THSRtowardNangang(Miaoli)
Island platform
Platform2B THSRtoward Nangang(Miaoli)
2F Lobby Entrance/Exit, information desk, tourism counter, shops
Ticketing, automatic ticket machines, faregates, waiting area
Restrooms, nursery
Passageway(withTRAXinwuri Station)
Street Level Outside Area Parking lot, buses, transfers, taxi stand
Drop-off area

Metro service

[edit]

A metro service operated byTaichung Metrois available through an out-of-station transfer. It is the western terminus of theGreen line.[8][9]

The HSR concourse could be reached via a bridge throughXinwuri railway station.[10]


HSR services

[edit]

HSR services 1xx, (1)2xx, (1)3xx, (1)5xx, (1)6xx, and (8)8xx call at this station, making this the HSR station with the most services and the only HSR station with all services.

Around the station

[edit]
[edit]

References

[edit]
  1. ^"Cao thiết duyên tuyến lí trình tọa tiêu tương quan tư liêu".data.gov.tw(in Chinese).Retrieved30 August2018.
  2. ^"Kế họa giới thiệu - cao thiết kiến thiết - đài loan cao thiết".Railway Bureau, MOTC(in Chinese).Retrieved29 August2018.
  3. ^"Đầu tư nhân quan hệ - doanh vận tư tấn".Taiwan High Speed Rail(in Chinese).Retrieved29 August2018.
  4. ^"Cao thiết thời khắc biểu cập phiếu giới tư tấn"(PDF).Taiwan High Speed Rail.8 August 2018.Retrieved25 February2019.
  5. ^Trần kiến trưng (16 October 2004)."Cao thiết sinh hoạt quyển thấu thiên thố bạo trướng 100 vạn".Apple Daily.Retrieved25 February2019.
  6. ^"Đài loan cao tốc thiết lộ đài trung xa trạm".Retrieved25 February2019.
  7. ^Trương huệ dân (24 October 2006)."〈 độc gia 〉SOGO tân quán thiết kế đoàn đội 50 ức đả tạo ô nhật trạm".TVBS.
  8. ^Hách tuyết khanh, tô mộc xuân (2020-11-15)."Đài trung tiệp vận lục tuyến thí doanh vận 16 nhật khởi 1 cá nguyệt miễn phí đáp thị dân hưng phấn chung ô đẳng đáo liễu [ ảnh ]".Trung ương thông tấn xã.
  9. ^"Đài trung tiệp vận vị lai doanh vận kế họa"(PDF).Transportation Bureau of Taichung City(in Chinese (Taiwan)). Taichung Metro. May 8, 2017.RetrievedOctober 15,2019.
  10. ^"Đài trung tiệp vận lục tuyến 18 cá xa trạm trạm danh xuất lô đáp thừa hữu thiện độ vi mệnh danh thủ yếu nguyên tắc".Taichung City Government(in Chinese (Taiwan)). June 30, 2018.RetrievedOctober 16,2019.