PSLV-C6
Names | HAMSAT mission |
---|---|
Mission type | Deployment of two satellites. |
Operator | ISRO |
Website | ISRO website |
Mission duration | 1,120 seconds |
Spacecraft properties | |
Spacecraft | Polar Satellite Launch Vehicle |
Spacecraft type | Expendable launch vehicle |
Manufacturer | ISRO |
Launch mass | 295,980 kilograms (652,520 lb) |
Payload mass | 1,602.5 kilograms (3,533 lb) |
Dimensions | 44.4 metres (146 ft) (overall height) |
Start of mission | |
Launch date | 04:44:00, May 5, 2005 (UTC) |
Rocket | Polar Satellite Launch Vehicle |
Launch site | Sriharikota Launching Range |
Contractor | ISRO |
End of mission | |
Disposal | Placed in graveyard orbit |
Deactivated | May 5, 2005 |
Orbital parameters | |
Reference system | Sun-synchronous orbit |
Payload | |
Cartosat-1 HAMSAT | |
Mass | 1,602.5 kilograms (3,533 lb) |
PSLV-C6 was the sixth operational launch and overall ninth mission of the PSLV program. This launch was also the fifty-fourth launch by Indian Space Research Organisation since its first mission on 1 January 1962. The vehicle carried and injected India's two satellites; Cartosat-1 (a.k.a. IRS-P5) and HAMSAT into the Sun-synchronous orbit. PSLV-C6 was launched at 04:44 hours Coordinated Universal Time (10:14 hours Indian Standard Time) on 5 May 2005 from the second launch pad of the Satish Dhawan Space Centre.[1][2][3][4][5]
Mission highlights
[edit]- Sixth operational launch of the PSLV program.
- Overall ninth mission of the PSLV program.
- Overall fifty-fourth launch by Indian Space Research Organisation.
- First flight to be launched from the second launch pad of Satish Dhawan Space Centre.
- Carried and injected two satellites built by ISRO.[6][7][8]
Mission parameters
[edit]- Mass:
- Total liftoff weight: 295,980 kilograms (652,520 lb)
- Payload weight: 1,602.5 kilograms (3,533 lb)
- Overall height: 44.4 metres (145.7 ft)
- Propellant:
- First stage: Solid HTPB based (138.0 + 6 x 9 tonnes)
- Second stage: Liquid UH 25 + N2O4 (41.5 tonnes)
- Third stage: Solid HTPB based (7.6 tonnes)
- Fourth stage: Liquid MMH + MON (2.5 tonnes)
- Engine:
- Thrust:
- Altitude: 628.535 kilometres (391 mi)
- Maximum velocity:7,546 metres per second (24,757 ft/s) (recorded at time of payload separation)
- Duration: 1,120 seconds
Payload
[edit]PSLV-C6 carried and deployed two Indian satellites, Cartosat-1 (a.k.a. IRS-P5) and HAMSAT into the Sun-synchronous orbit. Built by ISRO, Cartosat-1 was a stereoscopic remote sensing satellite and first of the Cartosat series of satellites.[5] HAMSAT was a microsatellite, built for providing satellite based amateur radio satellite to the national as well as the international community of amateur radio operators (HAM).[10]
Country | Name | Nos | Mass | Type | Objective |
---|---|---|---|---|---|
India | IRS-P5 | 1 | 1,560 kg | Satellite | Remote sensing satellite |
HAMSAT | 1 | 42.5 kg | Microsatellite | Amateur radio satellite |
Launch & planned flight profile
[edit]PSLV-C6 was launched at 04:44 hours Coordinated Universal Time (10:14 hours Indian Standard Time) on 5 May 2005 from the second launch pad of the Satish Dhawan Space Centre. The mission was planned with pre-flight prediction of covering overall distance of 622 kilometres (386 mi). Following was the flight profile.[9]
Stage | Time (seconds) |
Altitude (kilometer) |
Velocity (meter/sec) |
Event | Remarks |
---|---|---|---|---|---|
First stage | T+0 | 0.025 | 452 | Ignition of PS 1 | Lift off |
T+1.19 | 0.026 | 452 | Ignition of 4 ground-lit PSOM | ||
T+25 | 2.463 | 551 | Ignition of 2 air-lit PSOM | ||
T+68 | 23.748 | 1,179 | Separation of 4 ground-lit PSOM | ||
T+90 | 42.768 | 1,659 | Separation of 2 air-lit PSOM | ||
T+112.03 | 67.411 | 1,995 | Separation of PS 1 | ||
Second stage | T+112.23 | 67.635 | 1,994 | Ignition of PS 2 | |
T+156.03 | 115.244 | 2,314 | Separation of heat shield | ||
T+263.38 | 233.873 | 4,087 | Separation of PS 2 | ||
Third stage | T+264.58 | 235.304 | 4,083 | Ignition of HPS 3 | |
T+517.52 | 498.974 | 5,865 | Separation of HPS 3 | ||
Fourth stage | T+531.50 | 509.092 | 5,851 | Ignition of PS 4 | |
T+1,043.62 | 627.153 | 7,542 | Cut-off of PS 4 | ||
T+1,080.62 | 627.801 | 7,546 | Cartosat-1 separation | ||
T+1,120.62 | 628.535 | 7,546 | HAMSAT separation | Mission complete |
See also
[edit]References
[edit]- ^ "PSLV series". astronautix.com. Archived from the original on August 20, 2016. Retrieved 28 August 2016.
- ^ "PSLV-C6: A path-breaking launch". Business Standard. Retrieved 28 August 2016.
- ^ "ISRO scientists meet Prime Minister". Indian Space Research Organisation. Retrieved 28 August 2016.
- ^ "India's PSLV-C6 Successfully Launches 2 Satellites". spaceref.com. Retrieved 28 August 2016.
- ^ a b "PSLV-C6 launched from Sriharikota". The Economic Times. Archived from the original on September 15, 2016. Retrieved 28 August 2016.
- ^ a b "PSLV-C6". Indian Space Research Organisation. Retrieved 28 August 2016.
- ^ a b "PSLV". spacelaunchreport.com. Archived from the original on January 4, 2013. Retrieved 28 August 2016.
{{cite news}}
: CS1 maint: unfit URL (link) - ^ "ISRO timeline". Indian Space Research Organisation. Retrieved 28 August 2016.
- ^ a b "PSLV-C6 brochure" (PDF). Indian Space Research Organisation. Retrieved 28 August 2016.
- ^ "HAMSAT". Indian Space Research Organisation. Retrieved 28 August 2016.
External links
[edit]Media related to PSLV-C6 at Wikimedia Commons