A7 (Croatia)
A7 motorway | |
---|---|
Autocesta A7 | |
Primorka | |
Route information | |
Part of, | |
Length | 42.4 km (26.3 mi) |
Major junctions | |
From | Slovenian route 6 at Rupa border crossing |
D8inRupainterchange A8inMatuljiinterchange A6inOrehovica interchange D40inSveti Kuzaminterchange | |
To | D8D102inKrižišćeinterchange |
Location | |
Country | Croatia |
Counties | Primorje-Gorski Kotar |
Major cities | Kastav,Rijeka,Bakar,Kraljevica |
Highway system | |
TheA7 motorway(Croatian:Autocesta A7) is a 42.4-kilometre-long (26.3 mi)motorwayinCroatia.It connects the nation's largest port inRijeka,to the Croatian motorway network, as well as to theRupaandPasjakborder crossings toSlovenia.The motorway forms part of alongitudinaltransportation corridor in Croatia, and it is a part ofEuropean route E61Villach–Ljubljana–Trieste–Rijeka. The A7 motorway route south ofOrehovica interchange,where it also intersectsPan-European corridor Vb,is a part ofEuropean route E65.
The A7 motorway runs near a number ofCroatian citiesand provides access toUčka Nature Parkand, indirectly, to numerous resorts in theIstriaandKvarner Gulfregions. The motorway is nationally significant because of its positiveeconomic impacton the cities and towns it connects, and because of its contribution totourism in Croatia.The importance of the motorway as a transit route will be further increased upon completion of a proposed expansion of thePort of Rijekaand Rijeka transport node.
The motorway consists of twotraffic lanesand anemergency lanein each driving direction, separated by acentral reservation.There are no emergency lanes in the tunnels. All intersections of the A7 motorway aregrade separated.Numerous bridges,viaducts,tunnels, and other structures were required as the route traverses rugged terrain. As of 2010, there are ten exits and tworest areassituated along the route. Most of the motorway is nottolled,but a single section is tolled using an open toll system with pricing tied tovehicle classification.
Plans for the motorway were officially formulated in 1974 and the construction was started in 1977. The first 8.3-kilometre (5.2 mi) sections were completed as a two-lane expressway with grade-separated intersections, in 1988 and 1990, comprising the western arm of Rijeka bypass. As the first stage of the A6 motorway construction spanning between Zagreb and Rijeka neared completion in the 2000s, construction of a proper motorway along the A7 route started. In December 2009, theDiračje–Orehovicasection was upgraded to a six-lane motorway, bringing the entire route between Rupa border crossing and Sveti Kuzam interchange to a uniform standard.
Two new sections of the A7 motorway are currently under construction, extending the route eastward into vicinity ofKraljevica,Crikvenica,andKrk Bridge.The two sections are scheduled to be completed by 2012. Current long-term plans for developing the A7 motorway define its ultimate southern terminus inŽuta Lokvaat the interchange of theA1 motorway.This section is no longer part of any short-term plans, as no funding until 2012 is currently scheduled for the section. Further long-term plans specify an outer Rijeka bypass and a new interchange with theA8expressway.
Route description
[edit]The A7 motorway is an important north–south motorway in westernCroatia,connecting the nation's largest port and the city ofRijekato theSlovenianroad network at theRupaborder crossing.[7][8]The A7 motorway currently connects to the rest of theCroatian motorway networkvia theA6 motorwayinOrehovica interchange.[9]The motorway is a part ofInternational E-road networkroutesE65andE61.The sections south of Orehovica interchange are a part of the E65, while the remaining sections are a part of the E61.[10]
The motorway is of major importance to Croatia in terms of its development of theeconomy of Croatia,most notably intourism,as it represents the shortest and the most convenient route betweenTrieste,ItalyorLjubljana,Slovenia and theAdriatic Sea.This particularly applies to tourist resorts in theKvarner Gulfarea and to the Port of Rijeka, but it is also true for resorts inIstria,served via theA8 expressway.The genuine importance of the motorway as a transit route will be demonstrated upon completion of the A7 route toŽuta Lokvainterchange of theA1 motorwayand proposed expansion of thePort of Rijekaand Rijeka transport node. The former is planned as a part of completion of theAdriatic–Ionian motorway,[11]while the latter is planned to encompass the growth of the Port of Rijeka's cargo handling capacity,[12][13]improved railroad links and a new Rijeka bypass motorway linking the A7, via a number of new interchanges, to theA6andA8motorways. The project is, among other goals, aiming to increase traffic along the Croatian part ofPan-European corridor Vb,which connects to the A7 near Rijeka.[5][6][14][15]
As of 2014[update],the motorway spans 42.4 kilometres (26.3 mi) between the Rupa border crossing to Slovenia and Križišće where southbound A7 traffic currently ends at a roundabout connecting to the state roads D8 and D102.[2][3][4]It connects toRijekaas it forms Rijeka bypass, the A8 expressway of theIstrian Yand the A6 which represents motorway connection toZagrebandSplit.Future development of the motorway will include southward extensions of the motorway towardsCrikvenica,Novi Vinodolski,Senj,and ultimately Žuta Lokva interchange on the A1 motorway.[16][17]The A7 motorway consists of twotraffic lanesand anemergency lanein each driving direction along its entire length, except in tunnels where there are emergency bays rather than lanes. All existing interchanges aretrumpet interchanges.There are tworest areasalong the motorway, providing various types of services ranging from parking spaces and restrooms tofilling stationsand restaurants.[6]As of October 2010, the motorway has 10 interchanges,[needs update]providing access to a number of towns and cities and to theCroatian state road network.[1]The motorway is operated byAutocesta Rijeka – Zagreb.[18][19]
An automatic traffic monitoring and guidance system is in place along the motorway. It consists of measuring, control, and signaling devices, located in zones where driving conditions may vary—at interchanges, near viaducts, beside bridges, in tunnels, and in zones where fog and strong winds are known to occur. The system consists ofvariable traffic signsused to communicate changing driving conditions, possible restrictions, and other information to motorway users.[20]
The A7 motorway runs through hills, rugged coastal terrain, and urban areas, requiring a substantial number of bridges, viaducts, and tunnels along the route. Particular attention to the environment is also required since the route is situated inkarst topography,which is particularly susceptible to water pollution, and the urbanized areas requiring special attention to be paid tonoise pollution.[6]Noise pollution was assessed as especially severe in the Rastočine neighborhood of Rijeka, where residential buildings are particularly close to the motorway route, most notably a 26-storyhigh-riseonly 40 metres (130 ft) away from the route. The noise pollution was addressed by building a noise barrier 352 metres (1,155 ft) long which largely encloses that motorway section like a tunnel.[3][21][22]Curved overhead sections of the noise barrier are covered with 2,300 square metres (25,000 sq ft) ofsolar panelswith annual electricity production capacity of 248,000kWh.[23]
Toll
[edit]Only one section of the A7 motorway istolledbased on thevehicle classification in Croatiausing an open toll system in place between the Rupa andJurdaniinterchanges.[24]The toll is payable inCroatian kuna,euros,and major credit and debit cards. A number of prepaid toll collection systems are also used, including various types of smart cards issued by the motorway operator andENC—anelectronic toll collection (ETC)system which is shared by most motorways in Croatia and provides drivers with discounted toll rates for dedicated lanes at toll plazas.[25]
As of December 2010, Autocesta Rijeka–Zagreb collects toll on a single section of the motorway, between Rupa and Jurdani interchanges, close to the northern terminus of the motorway.[26]Unlike those sections further south, which are used as bypass road of the city of Rijeka, therefore carrying substantial suburban and commuter traffic, the tolled section carries almost exclusively transit traffic. The Rupa toll plaza, located on the section reported 240,975 kuna (€32,400) collected during a single, peak season, weekend in July.[27]Even though motorway traffic volume and thus toll revenue, decreased slightly elsewhere in the country, this particular tolled section reported virtually no change in income by 2010.[28][29]
Notable structures
[edit]As the A7 motorway route runs through rugged terrain, it utilizes a substantial number of major structures—bridges, viaducts, tunnels, underpasses,flyovers,andculverts.A significant number of interchanges present along Rijeka bypass the 18-kilometre (11 mi) A7 section between Matulji and Sveti Kuzam which consists of seven interchanges (including the Orehovica interchange with the A6 motorway), thus yielding an average distance of only 3 kilometres (1.9 mi) between them.[30]
The longest structures on the A7 motorway are the 858-metre (2,815 ft) Trsat Tunnel located on theOrehovica interchange–Škurinjesection, the 595-metre (1,952 ft) Škurinje II Tunnel situated between Škurinje andRujevicaexits, and the 588-metre (1,929 ft) Vežica Viaduct built on Orehovica–Draga section of the motorway.Rječina Bridge,a 210-metre (690 ft) inclined strut reinforced concrete bridge spanning theRječina Rivercanyon, is also noteworthy because its design and construction conditions are different from normal since it spans a protected water supply zone. The bridge consists of two parallel structures, and the first one to be completed was the northern span in 1984. The southern span was the last structure completed on the present A7 motorway route, and it was opened to traffic in 2009, 25 years after the original span.[30][31]
History
[edit]Rijeka bypass
[edit]Development of the city of Rijeka and the surrounding region (particularly in relation to the development of Port of Rijeka), associated transit transport of cargo, tourism and associated passenger traffic to the northern Adriatic resorts, rugged coastal topography, and the existing road routes running through the city of Rijeka itself, necessitated development of a high capacity bypass road to further the development and relieve congestion on the city streets. This was first officially formulated in spatial planning documents in 1974, and construction started in 1977.[32]The first, 8.3-kilometre (5.2 mi) section was completed in July 1988, between Diračje and Orehovica interchange, executed as a two-lane expressway with grade separated intersections. The 4.0-kilometre (2.5 mi) Diračje–Matulji and Matulji–Jušići sections, completed in 1990 and 1991 respectively, were built as four-lane expressways without emergency lanes. Those completed the western arm of Rijeka bypass, but traffic proceeding east from Orehovica interchange toKrk Island,Crikvenica,andSenjstill had to switch to the streets of Rijeka.[33]
Modern motorway
[edit]In the 2000s, as the first stage of the A6 motorway construction spanning between Zagreb and Rijeka neared completion, construction of a proper motorway along the A7 route started. In 2004, when the first stage of Rijeka–Zagreb motorway was completed,[34][35]the A7 route was extended by 3.7 kilometres (2.3 mi) to Jurdani, and in 2005, another 11-kilometre (6.8 mi) section was completed between Jurdani and the Slovenian border. The two new sections were the first ones built as a six-lane motorway. In May 2006, the motorway extended 6.35 kilometres (3.95 mi) east to Sveti Kuzam, forming the eastern arm of Rijeka bypass, relieving that part of the city from the transit traffic. Finally, after the Rijeka–Zagreb motorway was completed in 2008,[36][37]work on the remaining single-carriageway section of the route intensified. In December 2009, the Diračje–Orehovica section was upgraded to six-lane motorway, thus bringing the entire route between Rupa border crossing and Sveti Kuzam interchange to a uniform standard.[38]
Even thoughHrvatske autocestenormally develops motorways in Croatia,[19]as of September 2007,Autocesta Rijeka – Zagrebwas granted expansion of the concession previously awarded. The new concession contract included development and maintenance of the A7 motorway north of Križišće interchange,Krk Bridge,and a number of motorway access roads.[39]At the same time, the concession period was extended to 32 years and 11 months, starting on the date of the original concession contract.[40][41]Therefore, the concession, in its present form, will expire on May 28, 2031.[42]Construction costs incurred after 2007, when Autocesta Rijeka – Zagreb took over the motorway development, were estimated at 105 million euros.[21]
Future
[edit]Completion of Križišće - Žuta Lokva section
[edit]Long-term plans of development of the A7 motorway, published in the 2000s, involved an extension of the southern terminus atKrižišćeto the interchange with theA1 motorwayatŽuta Lokva,a distance of approximately 56km. This will also go toward completion of Croatia's section of theAdriatic–Ionian motorway.
The section was initially planned to be opened as an expressway by 2009, but those plans were delayed indefinitely.[43][44]In 2012, the Croatian government announced that no funds would be made available in near future for construction of A7 south of Križišće.[45]
However, in June 2023, it was announced byOleg Butković(Minister of Maritime Affairs, Transport and Infrastructure) andHACthat the road was planned for completion by 2030 or before, and that the bidding process had started.[46]
In January 2024, the tender for two segments of the A7, 17.5 kilometres between Križišće - Selce, began. This also includes the Crikvenica bypass.
Novi Vinodolski bypass
[edit]The bypass ofNovi Vinodolski,from theSelcejunction to the Novi Vinodolski junction, will be 6.5-kilometre (4.0 mi) long and its route will be built on the route of the left lane of the future highway. The route of the bypass passes through extremely demanding terrain, which is why a large number of facilities will be built on it, of which the 843-metre (2,766 ft) long Zagori tunnel and the Ričina viaduct across the Vinodol valley, 1,057-metre (3,468 ft) long, stand out. The works, according to the contract, should be completed within three years. The 600 million kuna construction contract was signed betweenHrvatske Autocestaand a contractor, a consortium consisting of the Slovenian company Kolektor CPG and the Italian ICM SPA. The decision to build the Novi bypass was made by theGovernment of the Republic of Croatia,and the financing of the project was provided in cooperation with the Croatian Postal Bank (HPB) and theCroatian Bank for Reconstruction and Development(HBOR).[47]
New Rijeka bypass
[edit]Further long-term plans specify a wider and longer outer Rijeka bypass which is planned on the Jurdani-Marčelji-Kikovica-Kraljevica route. Similarly, a new interchange of the A8 and A7 motorways is planned near Jušići. However, these long-term plans, even though they are well documented in government studies, still have no funding approved.[48]
Traffic volume
[edit]Traffic is regularly counted by means of a traffic census at Rupa mainline toll plaza as well as at two other sections of the motorway which are not tolled. The traffic volume is reported by Autocesta Rijeka – Zagreb, the operator of the motorway, and are published byHrvatske ceste.The traffic is heaviest along the western arm of Rijeka bypass as the section serves the city and acts as a link between the A8 and the A6 motorways while carrying regular A7 traffic. That part of the A7 motorway carries a 20,100-vehicleannual average daily traffic (AADT),and a 31,700-vehicleaverage summer daily traffic (ASDT)figure.
Substantial differences observed between AADT and ASDT numbers are usually attributed to the fact that the motorway carries significant tourist traffic to Istria and Kvarner Gulf area. The seasonal increase in traffic volume ranges from 10% on the south of Oštrovica interchange to 120% as measured on the Rupa–Matulji section. The central part of the motorway exhibits summer-season traffic volume increase of approximately 50%.[49][50]
A7 traffic volume details | |||
Counting site | AADT | ASDT | Notes |
2818 Rupa toll plaza | 6,653 | 14,634 | Between Rupa and Jurdani interchanges. |
2807 Rijeka bypass | 20,100 | 31,700 | BetweenA8andD304junctions. |
2810 Katarina Tunnel | 15,700 | 17,211 | BetweenA6andD403junctions. AADT figure estimated byHrvatske Ceste. |
Rest areas
[edit]As of November 2010, there are only two rest areas operating along the A7 motorway.[51]Applicable legislation provides for four types of rest areas designated as types A through D: A-type rest areas comprise a full range of amenities including a filling station, a restaurant, and a hotel ormotel;B-type rest areas have no lodging; C-type rest areas are very common and include a filling station and acafébut no restaurants or accommodations; and D-type rest areas offer parking spaces only, with possibly some picnic tables, benches, and restrooms.[52]Even though the rest areas found along the A7 motorway follow this ranking system, the Vrata Jadrana rest area is a C-type rest area and the Rupa rest area is a B-type facility. The filling stations also offerLPG fueland include smallconvenience stores.[51]
The primary motorway operator, Autocesta Rijeka–Zagreb, leases the rest areas to various operators through public tenders. As of November 2010, both rest areas found along the A7 motorway are operated byOMV.The rest area operators are not permitted to sub-lease the fuel operations, but they are also penalized if some facilities required by the lease contract are not operating.[53]All of the A7 motorway rest areas, are accessible from both traffic directions of the motorway. The rest areas normally operate 24 hours a day, seven days a week.[51]
List of A7 motorway rest areas | |||||
---|---|---|---|---|---|
County | km | Name[17] | Operators | Notes | |
Primorje-Gorski Kotar | 5.5 | Brgud | OMV | Facilities found at Brgud (previously Rupa) rest area are a filling station selling petrol, diesel fuel, and LPG, a café, a restaurant, and restrooms.[54] | |
18.0 | Vrata Jadrana | OMV | Facilities found at Vrata Jadrana rest area are a filling station selling petrol, diesel fuel, and LPG, a café, and restrooms.[55] | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Exit list
[edit]County | km | Exit | Name[17] | Destination[1] | Notes |
---|---|---|---|---|---|
Primorje-Gorski Kotar | 0.0 | Rupa border crossing | 6 E61 |
Rupa border crossing toSlovenia.The road continues intoSloveniaas route 6 towardsIlirska BistricaandLjubljana The northern terminus of theEuropean route E61concurrencyand the northern terminus of the motorway | |
1.9 | 1 | Rupa | D8 | Connection to D8 andPasjakborder crossing; That route extends into Slovenia as route 7 and further on toTrieste,Italy | |
4.0 | Rupa toll plaza | ||||
5.5 | Brgud rest area | ||||
11.4 | 3 | Jurdani | D8 | Connection to Jurdani andJušići | |
15.0 | 4 | Trinajstići | D8 | Connection to Trinajstići; Opened in October 2023 | |
16.4 | 5 | Učka | A8 E751 |
Also a connection a number of cities and towns via the A8 motorway (E751) includingRijekavia Kvarnerska Cesta,OpatijaandMatulji | |
18.0 | Vrata Jadrana rest area | ||||
20.0 | 6 | Diračje | D304 | Connection to Rijeka andKastavand Diračje | |
23.1 | 7 | Rujevica | Ž5025 | ||
23.9 | 8 | Škurinje | D403 | Connection toRijekaand thePort of Rijeka(west) | |
9 | Kozala | Planned connection to Kozala | |||
27.3 | Rječina Bridge | ||||
28.5 | 10 | Orehovica | A6 E61 E65 |
Connection to the A6 motorway (E65) The southern terminus of the European route E61 concurrency; The northern terminus of theEuropean route E65concurrency | |
31.0 | 11 | Draga | D404 | Connection toVežica,Brajdicaand the Port of Rijeka (Brajdica) The access road from Draga to the port in Brajdica is also considered a part of A7.[1] | |
34.4 | 12 | Sveti Kuzam | D40 E65 |
Connection toBakar,Čavleand theD8road; As this is the easternmost interchange completed on A7 motorway, it also serves as a connection toCrikvenica,Senjand island ofKrk(via the D8), until the A7 is extended. The southern terminus of the European route E65 concurrency; The southern terminus of the motorway | |
39.7 | 13 | Meja | D501 | Access toMeja,HreljinandKrižišće;Opened in December 2013[56] | |
43.7 | 14 | Križišće | D102 | Access toŠmrikaandOmišalj;Opened in December 2013[56] The access road from Križišće to the Krk Bridge is also considered a part of A7.[1] | |
Veli Dol Tunnel | |||||
48.9 | 15 | Jadranovo | D8 | Connection toJadranovoandCrikvenica;Planned | |
51.1 | Klanfari rest area; Planned | ||||
Crikvenica Tunnel | |||||
Bribir Tunnel | |||||
61.2 | 16 | Selce | D8 | Connection toSelceandCrikvenica;Under Construction | |
Ričina Viaduct | |||||
65.7 | 17 | Bribir | D99 | Connection toNovi VinodolskiandBribir;Planned | |
68.2 | 18 | Novi Vinodolski | D8 | Connection toPovileandSenj;Under Construction | |
D8Novi Vinodolski-Senj D23Senj-Žuta Lokva | |||||
Lika-Senj County | 103.0 | Žuta Lokva | A1 | Interchange withA1(Connection withZagreb,Split); Planned as a part ofAdriatic–Ionian motorway | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
[edit]References
[edit]- ^abcdeMinistry of Sea, Transport and Infrastructure (Croatia)(May 10, 2013)."Odluka o razvrstavanju javnih cesta"[Decision on categorization of public roads].Narodne novine(in Croatian) (66/2013).
- ^ab"section: Rupa-Matulji".Autocesta Rijeka–Zagreb.RetrievedDecember 24,2010.
- ^abc"section: Rijeka bypass".Autocesta Rijeka–Zagreb.RetrievedDecember 5,2010.
- ^ab"section: Orehovica-Sveti Kuzam".Autocesta Rijeka–Zagreb.RetrievedDecember 24,2010.
- ^abCrnjak, Mario; Puž, Goran (November 2007).Kapitalna prometna infrastruktura[Capital transport infrastructure](PDF).Hrvatske autoceste. pp. 27–28.ISBN978-953-7491-02-2.Archived fromthe original(PDF)on October 4, 2011.RetrievedOctober 11,2010.
- ^abcdCroatian Motorways (pp. 367–378).Hrvatske autoceste.2007.ISBN978-953-7491-09-3.Archived fromthe original(PDF)on 2011-02-18.RetrievedOctober 7,2010.
- ^"Overview of motorways and semi-motorways".HUKA. Archived fromthe originalon July 15, 2011.RetrievedSeptember 8,2010.
- ^"Map of border crossings and customs office areas"(PDF).Customs Administration of the Republic of Croatia(in Croatian). March 6, 2008.RetrievedOctober 13,2010.
- ^Overview map of the A7(Map).Google Maps.RetrievedSeptember 17,2010.
- ^"European Agreement on main international traffic arteries (AGR) (with annexes and list of roads). Concluded at Geneva on 15 November 1975"(PDF).United Nations.RetrievedJuly 29,2011.
- ^Radimir Čačić(November 2006)."Adriatic-Ionian Transport Corridor on the territory of the Republic of Croatia"(PDF).Regional Economic Forum Southeast Europe. Archived fromthe original(PDF)on December 29, 2009.RetrievedSeptember 8,2010.
- ^"Proširenje lučkih kapaciteta u Rijeci"[Expansion of Port of Rijeka facilities] (in Croatian).Croatian Radiotelevision.October 3, 2010. Archived fromthe originalon May 3, 2010.RetrievedOctober 8,2010.
- ^Darko Pajić (July 3, 2010)."Četiri poslovne zone za 40 milijuna tona tereta riječke luke"[Four business zones for 40 million tons of cargo handled by Port of Rijeka].Novi list(in Croatian).RetrievedDecember 24,2010.
- ^"Transport: launch of the Italy-Turkey pan-European Corridor through Albania, Bulgaria, Former Yugoslav Republic of Macedonia and Greece".European Union.September 9, 2002.RetrievedSeptember 6,2010.[permanent dead link ]
- ^"Realizacija prometnog čvora Rijeka kao pretpostavka gospodarskog razvoja županije"[Execution of Rijeka transport node as a precondition of economic development of the county](PDF)(in Croatian).Primorje-Gorski Kotar County.September 2, 2003. Archived fromthe original(PDF)on June 13, 2011.RetrievedOctober 8,2010.
- ^"A7 motorway development map"(PDF).HUKA(in Croatian). February 10, 2010.
- ^abc"Pravilnik o označavanju autocesta, njihove stacionaže, brojeva izlaza i prometnih čvorišta te naziva izlaza, prometnih čvorišta i odmorišta"[Regulation on motorway markings, chainage, interchange/exit/rest area numbers and names].Narodne novine(in Croatian). May 6, 2003.RetrievedSeptember 6,2010.
- ^"Nacionalno izviješće (2007)"[National report (2007)](PDF).HUKA.RetrievedNovember 22,2010.
- ^ab"Zakon o javnim cestama"[Public Roads Act].Narodne Novine(in Croatian). December 14, 2004.RetrievedSeptember 6,2010.
- ^Croatian Motorways.Hrvatske autoceste. 2007. pp. 130–133.ISBN978-953-7491-09-3.Archived fromthe original(PDF)on 2011-02-18.RetrievedSeptember 5,2010.
- ^abBranko Nadilo (July 2008)."Riječka obilaznica i južni kolnik dionice Orehovica - Diračje"[Rijeka bypass and the southern carriageway of Orehovica - Diračje section](PDF).Građevinar(in Croatian). Archived fromthe original(PDF)on 2011-07-18.RetrievedNovember 25,2010.
- ^Darko Pajić (November 12, 2009)."Obilaznica u nedjelju opet zatvorena"[The bypass closed on Sunday once again].Novi list(in Croatian).RetrievedDecember 24,2010.
- ^"Solarna elektrana na riječkoj obilaznici"[Solar electric power plant on Rijeka bypass] (in Croatian). Lider. March 25, 2009. Archived fromthe originalon October 2, 2011.RetrievedDecember 24,2010.
- ^"Tolls - price list".Autocesta Rijeka–Zagreb.RetrievedOctober 10,2010.
- ^"Statistički podaci"[Electronic toll collection available on HAC, ARZ and BINA Istra motorways] (in Croatian). HUKA. Archived fromthe originalon July 21, 2011.RetrievedAugust 28,2010.
- ^"Statistički podaci"[Statistical data](PDF).HUKA Bilten(in Croatian) (19). HUKA: 8. July 2010.RetrievedSeptember 6,2010.
- ^"Prihodi od cestarina manji nego lani"[Toll income lower than last year's] (in Croatian). Limun.hr. July 14, 2008.RetrievedDecember 25,2010.
- ^"Toll payment conditions".Hrvatske autoceste. Archived fromthe originalon 2011-07-18.RetrievedJuly 29,2011.
- ^"ARZ izgubio 8,6 milijuna kuna"[ARZ loses 8.6 million kuna] (in Croatian).Croatian Radiotelevision.June 5, 2010. Archived fromthe originalon 2010-05-03.RetrievedDecember 25,2010.
- ^abZlatko Šavor; Igor Gukov; Jelena Bleiziffer; Gordna Hrelja; Ivan Kalafatić; Marin Franetović (July 24, 2009)."Most Rječina na južnom kolniku riječke obilaznice"[Rječina Bridge on the southern carriageway of Rijeka bypass].Građevinar(in Croatian).RetrievedNovember 30,2010.
- ^Luka Benčić (December 22, 2009)."Otvorena riječka zaobilaznica, cesta koja se čekala više od 20 godina"[Rijeka bypass opens after more than 20 years of expectation].Jutarnji list(in Croatian).RetrievedNovember 30,2010.
- ^Tihomir Ponoš (June 27, 2004)."Naša ideja je bila izgraditi ono što samo zvali 'hrvatski križ'"[Our idea was to build what we called 'Croatian cross'](PDF).Vjesnik(in Croatian). Archived fromthe original(PDF)on July 16, 2007.RetrievedOctober 7,2010.
- ^Klara Bačić Čapalija; Ratimir Šarar (November 10, 2007)."Riječka obilaznica – izgradnja i dovršetak"[Rijeka Bypass - construction and completion](PDF).Građevinar(in Croatian).RetrievedNovember 24,2010.
- ^Branko Nadilo (December 20, 2006)."Gradnja do punog profila na autocesti Rijeka-Zagreb"[Expansion of Rijeka-Zagreb motorway to full motorway](PDF).Građevinar(in Croatian). Archived fromthe original(PDF)on July 18, 2011.RetrievedOctober 7,2010.
- ^"Priča duga 35 godina: Rijeka i Zagreb spojeni autocestom"[35 years long story: Rijeka and Zagreb connected by a motorway](PDF).HUKA Bilten(in Croatian) (2). HUKA: 1. September 2004. Archived fromthe original(PDF)on March 3, 2021.RetrievedOctober 7,2010.
- ^"Otvoren puni profil autoceste Rijeka-Zagreb"[Full cross-section of Rijeka-Zagreb motorway opens] (in Croatian).Ministry of Sea, Transport and Infrastructure.October 22, 2008. Archived fromthe originalon October 4, 2011.RetrievedOctober 7,2010.
- ^Tomislav Grdić; Damir Herceg (October 23, 2008)."Otvoren koridor Rijeka-Zagreb-Budimpešta"[Rijeka-Zagreb-Budapest corridor opens].Vjesnik(in Croatian).RetrievedOctober 7,2010.[permanent dead link ]
- ^"Napokon otvorena riječka obilaznica u punom profilu"[Full-section Rijeka bypass finally opens] (in Croatian). Metro Portal. December 22, 2009.RetrievedDecember 24,2010.
- ^Iva Balen (August 30, 2007)."Kalmeta: Puni profil obilaznice do 2010"[Kalmeta: Bypass as a motorway by 2010].Jutarnji list(in Croatian). Archived fromthe originalon 2010-05-16.RetrievedNovember 25,2010.
- ^"ARZ takes over Rijeka transport node management".Lider Press(in Croatian). August 30, 2007. Archived fromthe originalon 2011-10-02.Retrieved2010-06-07.
- ^"Odluka o osnivanju dioničkog društva Autocesta Rijeka - Zagreb d.d. i dodjeli koncesije za građenje i gospodarenje autocestom Rijeka - Zagreb"[Decision on founding of Rijeka - Zagreb Motorway joint stock company and granting of concession regulating construction and management of Rijeka - Zagreb motorway].Narodne Novine(in Croatian). December 11, 1997. Archived fromthe originalon April 2, 2015.RetrievedSeptember 6,2010.
- ^"Odluka o izmjenama i dopunama odluke o osnivanju dioničkog društva Autocesta Rijeka - Zagreb d.d. i dodjeli koncesije za građenje i gospodarenje autocestom Rijeka - Zagreb"[Decision on amendments and additions to decision on founding of Autocesta Rijeka - Zagreb joint stock company and award of concession to develop and maintain Rijeka - Zagreb motorway].Narodne Novine(in Croatian). August 8, 2007. Archived fromthe originalon March 3, 2016.RetrievedNovember 25,2010.
- ^"Žuta Lokva zaboravljena"[Žuta Lokva is forgotten].Novi list(in Croatian). August 14, 2009.RetrievedDecember 24,2010.
- ^"Nula kuna za autocestu Križišće – Žuta Lokva"[No funds for Križišće - Žuta Lokva motorway].Novi list(in Croatian). March 12, 2010.RetrievedDecember 24,2010.
- ^Tihana Tomičić (3 April 2012)."Prekršeno obećanje SDP-a; Žuta Lokva crvena pljuska Rijeci"[Broken SDP's promise; Žuta Lokva as a red slap to Rijeka].Novi list(in Croatian).Retrieved10 May2012.
- ^Pajić, Darko (2023-06-01)."Autocesta Križišće - Žuta Lokva trebala bi biti gotova u punom profilu najkasnije do 2030., doznajemo sve detalje".Novi list.Archivedfrom the original on 2023-06-02.Retrieved2023-06-14.
- ^Glavan, Marinko (14 September 2021)."Potpisan ugovor vrijedan 600 milijuna kuna: 'Novljanska obilaznica uvertira je za autocestu do Žute Lokve'"[Contract worth HRK 600 million signed: ‘Novljan bypass is an overture for the motorway to Žuta Lokva’].Novi List(in Croatian).Retrieved13 October2021.
- ^"Major transport infrastructure, pp. 37-38"(PDF).Ministry of Sea, Transport and Infrastructure of the Republic of Croatia(in Croatian). December 10, 2007. Archived fromthe original(PDF)on October 4, 2011.RetrievedJune 7,2010.
- ^Jelena Lončar (December 14, 2007)."Međuovisnost prometa i turizma u Hrvatskoj"[Interdependency of transport and tourism in Croatia] (in Croatian). geografija.hr. Archived fromthe originalon June 9, 2011.RetrievedSeptember 6,2010.
- ^"Traffic counting on the roadways of Croatia in 2009 - digest"(PDF).Hrvatske ceste.May 1, 2010. Archived fromthe original(PDF)on July 21, 2011.RetrievedSeptember 6,2010.
- ^abc"Rest areas - types and facilities".Autocesta Rijeka–Zagreb.RetrievedSeptember 7,2010.
- ^"Basic types and offer of roadside service facilities".Hrvatske autoceste. Archived fromthe originalon 2011-07-13.RetrievedJuly 29,2011.
- ^Darko Pajić (June 4, 2010)."Ina" prosula "500 tisuća eura u Gorskom kotaru"[INA "spills" 500 thousand euro in Gorski Kotar].Novi list(in Croatian).RetrievedSeptember 26,2010.
- ^"Rest areas - Rupa".Autocesta Rijeka–Zagreb.RetrievedNovember 26,2010.
- ^"Rest areas - Vrata Jadrana".Autocesta Rijeka–Zagreb.RetrievedNovember 26,2010.
- ^ab"U 12 sati otvoren puni profil dionice Sv. Kuzam - Križišće"[Highway Sv.Kuzam - Križišće opened] (in Croatian). novilist.hr. 23 December 2013. Archived fromthe originalon 29 March 2014.Retrieved26 August2014.