Jump to content

Baker Street tube station

Coordinates:51°31′19″N0°09′25″W/ 51.522°N 0.157°W/51.522; -0.157
From Wikipedia, the free encyclopedia

Baker StreetLondon Underground
Station entrance
Baker Street is located in Central London
Baker Street
Baker Street
Location of Baker Street in Central London
LocationMarylebone
Local authorityCity of Westminster
Managed byLondon Underground
Number of platforms10
Fare zone1
OSIMaryleboneNational Rail[1]
London Underground annual entry and exit
2018Decrease27.70 million[2]
2019Increase28.07 million[3]
2020Decrease8.48 million[4]
2021Increase11.15 million[5]
2022Increase20.52 million[6]
Key dates
10 January 1863(10 January 1863)Opened (MR)
April 1868Opened (MR platforms to north)
10 March 1906Opened (BS&WR, as terminus)
27 March 1907Extended (BSWR – Marylebone)
20 November 1939Started (Bakerloo to Stanmore)
1961Ended (Met to Aylesbury)
1 May 1979Ended (Bakerloo to Stanmore)
1 May 1979Started (Jubilee line)
30 July 1990Ended (Met to H'smith/Barking)
30 July 1990Started (Hammersmith & City)
Listedstatus
Listing gradeII* (since 28 June 2010)
Entry number1239815[7]
Added to list26 March 1987;37 years ago(1987-03-26)
Other information
External links
Coordinates51°31′19″N0°09′25″W/ 51.522°N 0.157°W/51.522; -0.157
London transport portal

Baker Streetis aLondon Undergroundstation at the junction ofBaker Streetand theMarylebone Roadin theCity of Westminster.It is one of the original stations of theMetropolitan Railway(MR), the world's first underground railway, opened on 10 January 1863.[8]

The station is inTravelcard Zone 1and is served by five lines.[9]On theCircleandHammersmith & Citylines it is betweenEdgware RoadandGreat Portland Streetstations, and on theMetropolitan lineit is betweenFinchley Roadand Great Portland Street stations. On theBakerloo lineit is betweenMaryleboneandRegent's Parkstations, and on theJubilee lineit is betweenSt John's WoodandBond Streetstations.[9]

Location[edit]

Map
Location of Baker Street station
The original Baker Street station entrances on each side of Marylebone Road, 1862

The station has entrances onBaker Street,Chiltern Street(ticket holders only) andMarylebone Road.Nearby attractions includeRegent's Park,Lord's Cricket Ground,theSherlock Holmes MuseumandMadame Tussauds.

History[edit]

Metropolitan Railway – the first underground railway[edit]

In the first half of the 19th century, the population and physical extent of London grew greatly.[note 1]The congested streets and the distance to the city from the stations to the north and west prompted many attempts to get parliamentary approval to build new railway lines into the city.[note 2]In 1852,Charles Pearsonplanned a railway from Farringdon to King's Cross. Although the plan was supported by the city, the railway companies were not interested and the company struggled to proceed.[15]The Bayswater, Paddington, and Holborn Bridge Railway Company was established to connect theGreat Western Railway's (GWR) Paddington station to Pearson's route at King's Cross.[15]Abillwas published in November 1852[16]and in January 1853 the directors held their first meeting and appointedJohn Fowleras its engineer.[17]Several bills were submitted for a route betweenPaddingtonandFarringdon.[18]The company's name was also to be changed again, toMetropolitan Railway[15][19][note 3]and the route was approved on 7 August 1854.[18][20]

Construction began in March 1860;[21]using the "cut-and-cover"method to dig the tunnel.[22][23]Despite several accidents during construction,[24]work was complete by the end of 1862 at a cost of £1.3 million.[25]Rail services through the station opened to the public on Saturday, 10 January 1863.[26][note 4]

In the next few years, extensions of the line were made at both ends with connections fromPaddingtonto the GWR's Hammersmith and City Railway (H&CR) and atGloucester Roadto theDistrict Railway(DR). From 1871, the MR and the DR operated a jointInner Circleservice between Mansion House and Moorgate Street.[8][note 5]

North-western "branch"[edit]

In April 1868, the Metropolitan & St John's Wood Railway (M&SJWR) opened a single-track railway in tunnel toSwiss Cottagefrom new platforms at Baker Street East (which eventually become the present Metropolitan line platforms).[28][29]The line was worked by the MR with a train every 20 minutes. A junction was built with the original route at Baker Street, but there were no through trains after 1869.[30][note 6]

The M&SJWR branch was extended in 1879 toWillesden Greenand, in 1880, toNeasdenandHarrow-on-the-Hill.[33]Two years later, the single-track tunnel between Baker Street and Swiss Cottage was duplicated and the M&SJWR was absorbed by the MR.[34][note 7]

Bakerloo and Jubilee lines[edit]

Route diagram which shows the original route between Baker Street and Waterloo.

In November 1891, aprivate billwas presented to Parliament for the construction of theBaker Street and Waterloo Railway(BS&WR).[35]The railway was planned to run entirely underground fromMarylebone[36]toElephant & Castle[37]via Baker Street andWaterloo[35]and was approved in 1900.[38][39]Construction commenced in August 1898[40]under the direction of SirBenjamin Baker,W. R. Galbraith and R. F. Church[41]with building work by Perry & Company of Tredegar Works,Bow.[41][note 8]Test trains began running in 1905.[45]The official opening of the BS&WR bySir Edwin Cornwalltook place on 10 March 1906.[46]The first section of the BS&WR was between Baker Street andLambeth North.[47]Baker Street was the temporary northern terminus of the line until it was extended to Marylebone on 27 March 1907, a year after the rest of the line.[8][47]The BS&WR's station building designed byLeslie Greenstood on Baker Street and served the tube platforms with lifts, but these were supplemented with escalators in 1914, linking the Metropolitan line and the Bakerloo line platforms by a new concourse excavated under the Metropolitan line.[48]An elaborately decorated restaurant and tea-room was added above Green's terminal building, the Chiltern Court Restaurant, which was opened in 1913.[49]

On 1 July 1933, the MR and BS&WR amalgamated with other Underground railways, tramway companies and bus operators to form the London Passenger Transport Board (LPTB), and the MR became the Metropolitan line, while the BS&WR became the Bakerloo line ofLondon Transport.[50]However, there was a bottleneck on the Metropolitan line at Finchley Road where four tracks merge into two to Baker Street. LPTB decided to extend the Bakerloo line from Baker Street as a branch line, taking over the existing section between Finchley Road and Stanmore.[note 9]Construction began in April 1936. On 20 November 1939, following the construction of an additional southbound platform and connecting tube tunnels between Baker Street andFinchley Roadstations, the Bakerloo line took over the Metropolitan line's stopping services between Finchley Road andWembley Parkand itsStanmorebranch.[52] [53]The current Bakerloo ticket hall and escalators to the lower concourse were provided in conjunction with the new service.[54]

After the Victoria line had been completed in the 1960s, the new Jubilee line was proposed which would take a route via Baker Street, Bond Street, Trafalgar Square, Strand, Fleet Street, Ludgate Circus and Cannon Street, then proceeding into southeast London.[55]This new line was to have been called theFleet line.[56]The Jubilee line added an extra northbound platform and replaced the Bakerloo line service to Stanmore from the station, opening on 1 May 1979.[8][57]

Circle and Hammersmith & City lines[edit]

The initial route on the Hammersmith & City line was formed by the H&CR, running between Hammersmith and Moorgate. Services were eventually extended to Barking via the DR and shared with the existing MR tracks between Baker Street and Liverpool Street.[8]The route between Hammersmith and Barking was shown on thetube mapas part of theMetropolitan line,but since 1990 has been shown separately, the Metropolitan line becoming the route from Aldgate to Baker Street and northwards through "Metro-Land"to Uxbridge,WatfordandAmersham.[8][58]

The circle line was initially formed by the combination of the MR and DR routes, which were between Edgware Road and South Kensington, Edgware Road and Aldgate via King's Cross St Pancras, South Kensington and Mansion House,[59][60]and a joint railway between Mansion House and Aldgate.[61][8][62][63]Since 1949, the Circle line is shown separately on the map.[64]

Incidents[edit]

On 18 June 1925, electric locomotive No.4 collided with a passenger train when a signal was changed from green to red just as the locomotive was passing it. Six people were injured.[65]

On 23 August 1973, a bomb was found in a carrier bag in the ticket hall.[66]The bomb was defused by thebomb squad.A week later, on 30 August, a member of staff found another bomb left on the overbridge. Again, it was defused without any injury.[67]

The station today[edit]

Baker Street station is the combination of three separate stations, with several booking offices throughout its operational years. Major changes took place in 1891-93 and 1910–12. The first part is the Circle Line station, which has its two platforms now used by the Circle and Hammersmith & City lines. They are situated on a roughly east-to-west alignment beneath Marylebone Road, spanning approximately the stretch between Upper Baker Street and Allsop Place. This was part of the original Metropolitan Railway from Bishop's Road (nowPaddington (Circle and Hammersmith & City lines) stationto Farringdon Street (nowFarringdon) which opened on 10 January 1863.[68]

The platforms serving the main branch of the Metropolitan line towards Harrow, Uxbridge and beyond are located within the triangle formed by Marylebone Road, Upper Baker Street and Allsop Place, following the alignment of Allsop place. This station is the second section which opened on 13 April 1868 by the Metropolitan & St. John's Wood Railway. This was later absorbed by the Metropolitan Railway, which is usually known to them as Baker Street East station.[68]

The final section is the deep-level tube station of the Baker Street & Waterloo Railway (now part of theBakerloo line), situated at a lower level beneath the site of Baker Street East, opened on 10 March 1906.[68]This part of the station now contains four platforms which are used by both the Bakerloo and Jubilee lines.[69]

This station is a terminus for some Metropolitan line trains, but there is also a connecting curve that joins to the Circle line just beyond the platforms, allowing Metropolitan line through services to run toAldgate.The deep-level Bakerloo and Jubilee lines platforms are arranged in across-platform interchangelayout[70]and there are track connections between the two lines just to the north of the station.[69]Access to the Bakerloo and Jubilee lines is only via escalators.[71]

A Hammersmith and City Line train to Barking arrives at Baker Street's oldest platforms opened in 1863

With ten platforms overall, Baker Street has the mostLondon Undergroundplatforms of any station on the network.[72]SinceSwiss Cottageand St John's Wood have replaced the former three stations between Finchley Road and Baker Street on the Metropolitan line, it takes an average of five and a half minutes to travel between them.[73]Essentially, theMetropolitan Lineoperates as a fast service while the Jubilee Line offers local service between the two stations.

As part of theTransported by Designprogramme of activities, on 15 October 2015, after two months of public voting, Baker Street underground station's platforms were elected by Londoners as one of the 10 favourite transport design icons.[74][75]

The former Chiltern Court Restaurant above the station is still in use today as the Metropolitan Bar, part of theWetherspoonspub chain.[49]The rest of the block, known asChiltern Courtand completed by the Metropolitan Railway's in-house architect,Charles Walter Clarkin 1929, houses residential apartments.[76]

Sub-surface platforms[edit]

Unique tile-work in this station, commemorates the fictionalSherlock Holmes' association with Baker Street

Of the MR's original stations, now the Circle and Hammersmith & City line platforms five and six are the best preserved dating from the station's opening in 1863. Plaques of the Metropolitan Railway's coat of arms along the platform and old plans and photographs depict the station which has changed remarkably little in over a hundred and fifty years.[77]Restoration work in the 1980s on the oldest portions of Baker Street station brought it back to something similar to its 1863 appearance.[78]

The Metropolitan line's platforms one to four were largely the result of the station's rebuild in the 1920s to cater for the increase in traffic on its outer suburban routes. Today the basic layout remains the same with platforms two and three being through tracks for City services to Aldgate from Amersham, Chesham and Uxbridge flanked by terminal platforms one and four which are the domain of services to and from Watford. The northern end of the platforms is in a cutting being surrounded by Chiltern Court and Selbie House the latter of which houses Baker Street control centre responsible for signalling the Metropolitan line from Preston Road to Aldgate, as well as the Circle and Hammersmith & City lines between Baker Street and Aldgate. The southern end of the platforms are situated in a cut and cover tunnel which runs towards Great Portland Street. All Metropolitan line platforms can function as terminating tracks however under normal circumstance only dead ended platforms one and four are used as such.[79]

Deep-level tube platforms[edit]

The Bakerloo line uses platforms eight and nine which date from 10 March 1906 when the Baker Street & Waterloo railway opened between here andLambeth North(then called Kennington Road). The contraction of the name to "Bakerloo" rapidly caught on, and the official name was changed to match in July 1906.

By the mid-1930s, theMetropolitan linewas suffering from congestion caused by the limited capacity of its tracks between Baker Street andFinchley Roadstations. To relieve this pressure, the network-wideNew Works Programme,1935–1940included the construction of new sections of tunnel between the Bakerloo line's platforms at Baker Street and Finchley Road and the replacement of three Metropolitan line stations (Lord's,Marlborough RoadandSwiss Cottage) between those points with two new Bakerloo stations (St John's WoodandSwiss Cottage). The Bakerloo line also took over the Metropolitan line's service toStanmoreon 20 November 1939. The branch remained part of the Bakerloo line until 1 May 1979, when similar congestion problems for the Bakerloo line caused by the two branches converging at Baker Street led to the opening of theJubilee line,initially created by connecting the Stanmore branch to new tunnels bored between Baker Street andCharing Cross.Following refurbishment in the 1980s the original tiling scheme was replaced with tiles depicting the silhouette of Sherlock Holmes who lived at221B Baker Street.

The Bakerloo still maintains its connection with the now Jubilee line tracks to Stanmore with tunnels linking from Northbound Bakerloo line platform nine to the Northbound Jubilee line towardSt John's Woodand Southbound from Jubilee line platform seven to the Southbound Bakerloo line towardsRegent's Park.[80]Although no passenger services operate over these sections they can be used for the transfer of engineering trains and was used to transfer Bakerloo line1972 stocktrains to and fromActon Worksas part of a refurbishment programme.[81]

Jubilee line trains use platforms seven and ten, which opened in 1979 when the newly built Jubilee line took over existing Bakerloo line services to Stanmore running through new tunnels from Baker Street to Charing Cross to serve as a relief line to the Bakerloo which by then was suffering from capacity issues. In 1999 the Jubilee line was extended from Green Park to Stratford and made the Jubilee line platforms at Charing Cross redundant after twenty years. The design of the Jubilee line platforms at Baker Street has changed little since being opened with illustrations depicting famous scenes from Sherlock Holmes cases.

Cross platform interchange is provided between Bakerloo and Jubilee lines in both directions.

Station improvements[edit]

Step-free access project[edit]

In 2008TfLproposed a project to provide step-free access to the sub-surface platforms. The project was a TfL-funded Games-enabling project in its investment programme (and not a project specifically funded as a result of the success of the London 2012 Games bid).[82]The project was included in the strategy on accessible transport published by the London 2012 Olympic Delivery Authority and the London Organising Committee of the Olympic and Paralympic Games.[83]

Access to the Metropolitan line platforms 1–4 (serving trains to and from Finchley Road) would be provided by a bridge from the Bakerloo and Jubilee line ticket hall, with a lift from the bridge to each island platform. Through a passage from platforms 1–2, this would also give step-free access to platform 5 (Circle and Hammersmith & City line eastbound trains). Access to platform 6 (Circle and Hammersmith & City line westbound trains) would be provided by demolishing the triangular building outside the station, on the north side of Marylebone Road, and taking over the public pedestrian subway under Marylebone Road to provide a link between a lift up from platform 5 to the subway and a lift at the other end of the subway down to platform 6. The replacement for the triangular building would also act as an emergency exit for the station.[84]

TfL applied for planning permission and listed building consent for providing access to platforms 5 and 6 on 1 October 2008, but the application was subsequently withdrawn. (The part of the proposed scheme to provide step-free access to platforms 1–4 is within TfL's permitted development rights, and so does not require planning permission.)[85]TfL announced on 31 March 2009 that because of budgetary constraints the step-free scheme would be deferred.[86]

Platform lengthening[edit]

In order to accommodate the new, longerS stocktrains, which started operating Metropolitan line services in August 2010, platforms 1 and 4 have been extended.[87]However, the Circle and Hammersmith & City line platforms 5 and 6 have not been extended to accommodate their new S7 Stock trains, due to the enclosed nature of the platforms. Instead,selective door operationis employed.

Services[edit]

Bakerloo line[edit]

A southbound Bakerloo line train arrives at Platform 8.

On the Bakerloo line, Baker Street station is betweenRegent's ParkandMarylebone.[9]Trains can terminate atQueen's Park,Stonebridge Park,orHarrow and Wealdstoneto the north, andPiccadilly Circus,Lambeth NorthorElephant & Castleto the south.[88]

The typical service pattern in trains per hour (tph) operated during off-peak hours is:[89]

  • 6tph to Harrow & Wealdstone via Queen's Park and Stonebridge Park (Northbound)
  • 3tph to Stonebridge Park via Queen's Park (Northbound)
  • 11tph to Queen's Park (Northbound)
  • 20tph to Elephant & Castle (Southbound)

Weekday peak service operates with one or two additional Queen's Park-Elephant & Castle trains per hour, and Sunday service operates with two fewer Queen's Park-Elephant & Castle trains per hour during the core of the day.

Jubilee line[edit]

A couple is seen hugging and kissing on the Jubilee line platform.
A northbound Jubilee line train stands at Platform 10.

On the Jubilee line, the station is situated between Bond Street to the south and St John's Wood to the north. Southbound trains usually terminate at Stratford and North Greenwich although additional turn back points are provided atGreen Park,Waterloo,London Bridge,Canary WharfandWest Ham.Northbound trains usually terminate at Stanmore, Wembley Park and Willesden Green although additional turn back points are available at Finchley Road, West Hampstead and Neasden.[90]

As off the May 2022 timetable the typical off-peak service in trains per hour (tph) is:[91]

  • 24tph Southbound to Stratford
  • 12tph Northbound to Stanmore
  • 4tph Northbound to West Hampstead
  • 4tph Northbound to Wembley Park
  • 4tph Northbound to Willesden Green

TheNight tubeservice (Friday night to Saturday morning & Saturday night to Sunday morning) in trains per hour is:[91]

  • 6tph Southbound to Stratford
  • 6tph Northbound to Stanmore

Circle line[edit]

The station is betweenGreat Portland StreetandEdgware Roadon this line as well on the Hammersmith & City line.[9]

The typical service in trains per hour is:[92]

  • 6tph Clockwise to Edgware Road via King's Cross St Pancras, Liverpool Street, Tower Hill andVictoria
  • 6tph Anti-clockwise to Hammersmith via Paddington

Hammersmith & City line[edit]

Between 1 October 1877 and 31 December 1906 some services on the H&CR were extended toRichmondover theLondon and South Western Railway(L&SWR) via its station atHammersmith (Grove Road).[93][note 10]

The station is betweenGreat Portland StreetandEdgware Roadon this line, as with the Circle line.[9]

The typical off-peak service in trains per hour (tph) is:[92]

  • 6tph Eastbound to Barking or Plaistow
  • 6tph Westbound to Hammersmith

Metropolitan line[edit]

A southbound A60 stock Metropolitan line train stands on Platform 3. A terminating S8 stock train is on Platform 4 on the right.
Old versus new: A60 stock on the left and S8 stock on the right.
The Metropolitan line platforms viewed from above, with a train at platform 1

The Metropolitan line is the only line to operate an express service although currently this is mostly southbound in the morning peaks and northbound in the evening peaks.[94]Southbound fast services run non-stop betweenMoor Park,Harrow-on-the-HillandFinchley Roadwhilst semi-fast services run non stop between Harrow-on-the-Hill and Finchley Road. Northbound fast and semi-fast services call additionally atWembley Park.[95]

The station is situated betweenGreat Portland Streetsharing tracks with theCircleandHammersmith & Citylines in the East and Finchley Road Station to the North. Southbound trains may terminate here and return north towards Uxbridge, Amersham, Chesham, or Watford, where platforms 1 and 4 are used.[69]

The off-peak service in trains per hour is:[95]

  • 12tph Southbound to Aldgate
  • 4tph Southbound services terminate here
  • 2tph Northbound to Amersham (all stations)
  • 2tph Northbound to Chesham (all stations)
  • 4tph Northbound to Watford (all stations)
  • 8tph Northbound to Uxbridge (all stations)
Preceding station London Underground Following station
Marylebone Bakerloo line Regent's Park
Edgware Road Circle line
Great Portland Street
Hammersmith & City line Great Portland Street
towardsBarking
St John's Wood
towardsStanmore
Jubilee line Bond Street
towardsStratford
Finchley Road Metropolitan line Great Portland Street
towardsAldgate
Terminus
Former services
Preceding station London Underground Following station
St John's Wood
towardsStanmore
Bakerloo line
Stanmore branch(1939–1979)
Regent's Park
Lord's Metropolitan line
(1868–1939)
Great Portland Street
towardsAldgate
Terminus
Edgware Road Metropolitan line
Hammersmith branch(1864–1990)
Great Portland Street
towardsBarking

Connections[edit]

The station is served byLondon Busesday and night routes.[96][97]

Points of interest[edit]

In popular culture[edit]

The Metropolitan Bar above Baker Street station is featured inMetro-Land,a 1973 documentary film byJohn Betjemanin which he reminiscences about its genteel origins as the Chiltern Court Restaurant, which formed part of the block,Chiltern Court,which Clark constructed above the station.[98][49]

See also[edit]

Notes and references[edit]

Notes[edit]

  1. ^In 1801, approximately one million people lived in the area that is nowGreater London.By 1851 this had doubled.[10]The increasing resident population and the development of a commuting population arriving by train each day led to a high level of traffic congestion with huge numbers of carts, cabs, and omnibuses filling the roads and up to 200,000 people entering theCity of London,the commercial heart, each day on foot.[11]
  2. ^None were successful, and the 1846Royal Commission on Metropolitan Railway Terminibanned construction of new lines or stations in the built-up central area.[12][13]The concept of an underground railway linking the City with the mainline termini was first proposed in the 1830s.[14]
  3. ^The original established name was the "North Metropolitan Railway".[18]
  4. ^The railway included a ceremonial run from Paddington and a large banquet for 600 shareholders and guests at Farringdon a day earlier.[27]These platforms are now served by the Circle and Hammersmith & City lines.[8]
  5. ^After further extensions by the Metropolitan Railway toLiverpool Street(1875),Aldgate(1876) andTower of London(1882), the Inner Circle was completed in 1884.[8]
  6. ^The original intention of the M&SJWR was to run underground north-east toHampstead Village,and indeed this appeared on some maps.[31]This was not completed in full and the line was built in a north-western direction instead; a short heading of tunnel was built north of Swiss Cottage station in the direction of Hampstead.[32]This is still visible today when travelling on a southbound Metropolitan line service.
  7. ^Further extensions took the Metropolitan Railway toPinner(1885),Rickmansworth(1887),Chesham(1889),Aylesbury(1892),Uxbridge(1904) andWatford(1925).[8]
  8. ^By November 1899, the northbound tunnel reached Trafalgar Square and work on some of the station sites was started, but the collapse of the L&GFC in 1900 led to works gradually coming to a halt. When the UERL was formed in April 1902, 50 per cent of the tunnelling and 25 per cent of the station work was completed.[42]With funds in place, work restarted and proceeded at a rate of 73 feet (22.25 m) per week,.[43]By February 1904, most of the tunnels and underground parts of the stations between Elephant & Castle and Marylebone were complete and works on the station buildings were in progress.[44]The additional stations were incorporated as work continued elsewhere.[45]
  9. ^In 1929, construction of a spur line from Wembley Park to Stanmore began.[51]It opened on 10 December 1932.[8]
  10. ^The L&SWR tracks to Richmond now form part of the London Underground's District line. Stations between Hammersmith and Richmond served by the MR wereRavenscourt Park,Turnham Green,Gunnersbury,andKew Gardens.[8]

References[edit]

  1. ^"Out-of-Station Interchanges"(Microsoft Excel).Transport for London.2 January 2016.Retrieved28 August2016.
  2. ^"Station Usage Data"(CSV).Usage Statistics for London Stations, 2018.Transport for London.23 September 2020.Archivedfrom the original on 14 January 2023.Retrieved11 October2023.
  3. ^"Station Usage Data"(XLSX).Usage Statistics for London Stations, 2019.Transport for London.23 September 2020.Archivedfrom the original on 9 November 2020.Retrieved9 November2020.
  4. ^"Station Usage Data"(XLSX).Usage Statistics for London Stations, 2020.Transport for London.16 April 2021.Retrieved1 January2022.
  5. ^"Station Usage Data"(XLSX).Usage Statistics for London Stations, 2021.Transport for London.12 July 2022.Retrieved7 September2022.
  6. ^"Station Usage Data"(XLSX).Usage Statistics for London Stations, 2022.Transport for London.4 October 2023.Retrieved10 October2023.
  7. ^Historic England."Baker Street Station: Main Entrance Building and Metropolitan, Circle and Hammersmith & City line platforms (no. 1-6) including retaining wall to Approach Road (1239815)".National Heritage List for England.Retrieved6 May2014.
  8. ^abcdefghijklRose 2007.
  9. ^abcdeStandard Tube Map(PDF)(Map). Not to scale.Transport for London.April 2024.Archived(PDF)from the original on 28 May 2024.Retrieved3 June2024.
  10. ^"Total Population".A Vision of Britain Through Time.University of Portsmouth/Jisc.2009.Retrieved13 December2015.
  11. ^Wolmar 2004,p. 22.
  12. ^Simpson 2003,p. 7.
  13. ^"Metropolitan Railway Termini".The Times.No. 19277. 1 July 1846. p. 6.Retrieved13 December2015.
  14. ^"Grand Central Railway Terminus".The Times.No. 19234. 12 May 1846. p. 8.Retrieved13 December2015.
  15. ^abcDay & Reed 2008,p. 9.
  16. ^"No. 21386".The London Gazette.30 November 1852. p. 3480.
  17. ^Green 1987,pp. 3–4.
  18. ^abc"Fowler's Ghost" 1962,p. 299.
  19. ^"No. 21497".The London Gazette.25 November 1853. pp. 3403–3405.
  20. ^"No. 21581".The London Gazette.11 August 1854. pp. 2465–2466.
  21. ^Day & Reed 2008,p. 10.
  22. ^Jackson 1986,p. 24.
  23. ^Walford 1878.
  24. ^Wolmar 2004,p. 36.
  25. ^Wolmar 2004,pp. 30 & 37.
  26. ^Day & Reed 2008,p. 14.
  27. ^Wolmar 2004,p. 39.
  28. ^Green 1987,p. 11.
  29. ^Edwards & Pigram 1988,p. 33.
  30. ^Horne 2003,pp. 7–8.
  31. ^Demuth & Leboff 1999,p. 9.
  32. ^Jackson 1986,pp. 374.
  33. ^Horne 2003,p. 13.
  34. ^Bruce 1983,p. 20.
  35. ^ab"No. 26225".The London Gazette.20 November 1891. pp. 6145–6147.
  36. ^"No. 26767".The London Gazette.11 August 1896. pp. 4572–4573.
  37. ^Badsey-Ellis 2005,pp. 84–85.
  38. ^Badsey-Ellis 2005,p. 56.
  39. ^"No. 27218".The London Gazette.7 August 1900. pp. 4857–4858.
  40. ^Wolmar 2004,p. 168.
  41. ^abLee, Charles E. (March 1956a). "Jubilee of the Bakerloo Railway – 1".The Railway Magazine.pp. 149–156.
  42. ^"The Underground Electric Railways Company Of London (Limited)".The Times.No. 36738. 10 April 1902. p. 12.Retrieved2 December2015.
  43. ^Day & Reed 2008,p. 69.
  44. ^"Railway And Other Companies – Baker Street and Waterloo Railway".The Times.No. 37319. 17 February 1904. p. 14.Retrieved2 December2015.
  45. ^abWolmar 2004,p. 173.
  46. ^Horne 2001,p. 17.
  47. ^abFeather, Clive (30 December 2014)."Bakerloo line".Clive's Underground Line Guides.Archivedfrom the original on 8 December 2015.Retrieved2 December2015.
  48. ^Horne 2001,p. 38.
  49. ^abcBradley, Simon (2015).The Railways: Nation, Network and People.Profile Books.ISBN9781847653529.Retrieved9 September2019.
  50. ^"No. 33668".The London Gazette.9 December 1930. pp. 7905–7907.
  51. ^Horne 2003,p. 42.
  52. ^Horne 2003,pp. 59–61.
  53. ^Feather, Clive (5 October 2018)."Metropolitan line".Clive's Underground Line Guides.Archivedfrom the original on 7 December 2018.Retrieved8 December2018.
  54. ^Horne 2001,p. 48.
  55. ^"More Tube lines discussed: Easing travel load".The Times.London. 27 April 1965. p. 7.
  56. ^Willis, Jon (1999).Extending the Jubilee Line: The planning story.London Transport.OCLC637966374.
  57. ^Feather, Clive."Bakerloo line".Clive's Underground Line Guides.Archived fromthe originalon 2 April 2015.Retrieved10 April2015.
  58. ^"London Underground map 1990".The London Tube map archive.Retrieved21 November2012.
  59. ^Wolmar 2004,p. 72.
  60. ^Lee 1956b,p. 7.
  61. ^Jackson 1986,p. 110.
  62. ^Day & Reed 2008,p. 18.
  63. ^Horne 2006,pp. 5–6.
  64. ^"1949 tube map".Retrieved5 March2012.
  65. ^Earnshaw, Alan (1989).Trains in Trouble: Vol. 5.Penryn: Atlantic Books. p. 20.ISBN0-906899-35-4.
  66. ^"History of Baker Street Tube Station".Jessica Higgins. Archived fromthe originalon 4 March 2012.
  67. ^Nick, Cooper (5 June 2006)."Attacks on the London Underground".The Underground at War.Archivedfrom the original on 23 April 2010.
  68. ^abcPask, Brian."Booking Offices at Baker Street"(PDF).Points of Interest.London Underground Railway Society.Archived(PDF)from the original on 6 February 2019.Retrieved6 February2019.
  69. ^abcJarrier, Franklin."Greater London Transport Tracks Map"(PDF)(Map).CartoMetro London Edition.3.7.Archived(PDF)from the original on 18 November 2018.
  70. ^"Step free Tube Guide"(PDF).Transport for London.April 2021.Archived(PDF)from the original on 15 May 2021.
  71. ^"Tube Stations that only have escalators".Tube Facts and Figures.Geofftech. Archived fromthe originalon 3 April 2015.Retrieved10 April2015.
  72. ^"London Underground: 150 fascinating Tube facts".Telegraph.9 January 2013.Archivedfrom the original on 10 April 2015.Retrieved10 April2015.
  73. ^"Stations that it takes the longest to travel between".Tube Facts and Figures.Geofftech. Archived fromthe originalon 3 April 2015.Retrieved10 April2015.
  74. ^"London's transport 'Design Icons' announced".London Transport Museum. Archived fromthe originalon 31 March 2016.Retrieved27 March2016.
  75. ^Goldstein, Danielle (4 August 2015)."Transported By Design: Vote for your favourite part of London transport".Timeout.Retrieved14 July2017.
  76. ^"Chiltern Court".Buildington.Retrieved24 April2022.
  77. ^Jones, Ian (6 January 2013)."76. The original platforms at Baker Street".150 Great Things About the Underground.Archivedfrom the original on 10 April 2015.Retrieved10 April2015.
  78. ^Reid, T.R.(22 September 1999)."Sherlock Holmes honored with statue near fictional London home".The Washington Post.Retrieved6 January2013.
  79. ^"Baker Street Control Room".Flickr.November 2009.Retrieved5 April2017.
  80. ^London Underground Junction Diagrams(PDF).London Underground. 2015. p. 2.
  81. ^"London Underground train life extension".Rail Engineer.27 July 2016. Archived fromthe originalon 22 August 2018.Retrieved5 April2017.
  82. ^"TfL's Transport Portfolio Executive Report for the London 2012 Olympic Games and Paralympic Games – Quarter 2 2007/08"(PDF).TfL. 2008.Archived(PDF)from the original on 25 April 2012.
  83. ^"Accessible Transport Strategy for the London 2012 Olympic and Paralympic Games"(PDF).London 2012. May 2008. p. 31. Archived fromthe original(PDF)on 21 November 2008.
  84. ^"Step-free access Baker Street station"(PDF).TfL. September 2008.Archived(PDF)from the original on 14 August 2013.
  85. ^"Planning – Application Summary 08/08647/FULL".Westminster City Council. 1 October 2008.Archivedfrom the original on 14 August 2013.
  86. ^"TfL sets out £9.2bn 2009/2010 budget to deliver major improvements this year"(Press release). TfL. 31 March 2009.Archivedfrom the original on 19 January 2012.
  87. ^"'S' stock making its mark ".Modern Railways.London. December 2010. p. 46.
  88. ^"CULG – Bakerloo Line".Davros.org.Clive's UndergrounD Line Guides. 20 June 2017.Retrieved14 July2017.
  89. ^"Bakerloo Line Working Timetable No. 42"(PDF).Transport for London. 21 May 2017. Archived fromthe original(PDF)on 13 October 2017.Retrieved14 July2017.
  90. ^"CULG – Jubilee Line".davros.org.Retrieved1 April2017.
  91. ^ab"Jubilee line working timetable"(PDF).Transport for London.Archived(PDF)from the original on 27 February 2017.
  92. ^ab"Circle and H'Smith & City line timetable"(PDF).Transport for London.Archived fromthe original(PDF)on 11 November 2016.
  93. ^Simpson 2003,p. 43.
  94. ^"Watford Tube Guide"(PDF).Transport for London.Retrieved6 July2019.
  95. ^ab"CULG – Metropolitan Line".davros.org.Retrieved1 April2017.
  96. ^"Buses from Baker Street and Marylebone"(PDF).TfL.28 August 2021.Retrieved1 August2022.
  97. ^"Night buses from Baker Street and Marylebone"(PDF).TfL.10 July 2021.Retrieved1 August2022.
  98. ^Betjeman, John; Games, Stephen (4 February 2010).Betjeman's England.John Murray Press.ISBN9781848543805.Retrieved9 September2019.

Bibliography[edit]

External links[edit]