Jump to content

Guangzhou Bus Rapid Transit

From Wikipedia, the free encyclopedia
(Redirected fromGuangzhou BRT)

Guangzhou Bus Rapid Transit (GBRT)
CRRC TEG6180BEV02 articulated bus on route B1
CRRC TEG6180BEV02 articulated bus on route B1
Overview
LocaleGuangzhou
Transit typeBus rapid transit
Number of lines31
Number of stations26
Daily ridership1,000,000[1]
Websitehttp:// gz-brt.cn/
Operation
Began operation10 February 2010
Technical
System length22.5 km (14.0 mi)
Top speed21 km/h (13 mph)
Guangzhou Bus Rapid Transit
Simplified ChineseQuảng Châu nhanh chóng giao thông công cộng
Traditional ChineseQuảng Châu nhanh chóng giao thông công cộng
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Kuàisù Gōngjiāo
Alternative Chinese name
Simplified ChineseQuảng Châu BRT
Traditional ChineseQuảng Châu BRT
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu BRT

Guangzhou Bus Rapid Transit(Guangzhou BRTorGBRT) is thebus rapid transit(BRT) system of the city ofGuangzhouin the People's Republic ofChina.Its first line was put into operation on 10 February 2010. It handles approximately 1,000,000[1]passenger trips daily with a peak passenger flow of 26,900pphpd(second only to theTransMilenioBRT system inBogotá,Colombia).[2]In fact, this rapid transit system contains the world's longest BRT stations – around 260m including bridges – with bus volumes of 1 bus every 10 seconds or 350 per hour in a single direction. The BRT system has two new lines and two extensions planned.[3]

Fleet

[edit]

The BRT operates the following models of buses:

The livery of the BRT is orange with BRT written in white on the sides.

Zhongshan Avenue Bus Rapid Transit trial line

[edit]
Tianhe Sports Center Station
GBRT dedicated corridor
LCD Passenger Information Screen at Gangding Station.

Zhongshan AvenueBus Rapid TransitTrial Line (Chinese:Trung sơn đại đạo nhanh chóng giao thông công cộng thí nghiệm tuyến) is the first and only line in operation of Guangzhou BRT. The line is laid out along Zhongshan Avenue ( trung sơn đại đạo ), whose innermost lanes form a dedicated BRT corridor. It starts at Tianhe Sports Center inTianhe Districtin the west and ends at Xiayuan inHuangpu Districtin the east with 26 stations. Several stations have connections toGuangzhou Metro.Same-direction transfers between buses within the BRT corridor are free. The project won numerous awards such as the Sustainable Transportation Development Award in 2011, the first Chinese transportation project to win such award.[4]

Station Name
English
Station Name
Chinese
Transfer Location
Tianhe Sports Center Thể dục trung tâm Guangzhou Metro13APM Tianhe
Shipaiqiao Thạch bài kiều Guangzhou Metro3
Gangding Cương đỉnh Guangzhou Metro3
South China Normal University & Jinan University Sư đại ký đại
Huajing Xincheng Hoa cảnh tân thành
Shangshe Thượng xã
Xueyuan Học viện
Tangxiacun Đường hạ thôn
Tangdong Đường đông
Tianlangmingju Thiên lãng minh cư
Chebei Xe pha Guangzhou Metro4
Dongpuzhen Đông phố trấn
Huangcun Hoàng thôn Bus interchangeDongpu Coach Terminal
Zhucun Châu thôn
Lianxi Liên khê
Maogang Mao cương Huangpu
Zhu gian gcun Châu Giang thôn
Xiasha Hạ sa
Wuchong Ô hướng
Huangpu Coach Station (Shuanggang Metro Station) Hoàng bộ vận chuyển hành khách trạm ( tàu điện ngầm song cương trạm ) Guangzhou Metro13Bus interchangeHuangpu Coach Station
Shuanggang Song cương
Shapu Sa phổ
Nanhai God Temple Nam Hải thần miếu Guangzhou Metro13
Miaotou Miếu đầu
Nanwan Nam loan
Xiayuan Hạ viên Guangzhou Metro513

References

[edit]
  1. ^ab"Guangzhou's Remarkable Bus Rapid Transit System".Reuters.5 April 2011.Retrieved15 April2011.
  2. ^International Public Transport Conference 2010Archived13 July 2011 at theWayback MachineCase Study of the Guangzhou BRT – Retrieved on 2010-08-05
  3. ^"Guangzhou BRT".Guangzhou BRT. Archived fromthe originalon 25 May 2007.Retrieved22 October2010.
  4. ^"Quảng Châu BRT bị trao tặng" thế giới giao thông có thể liên tục phát triển thưởng "_ tin tức trung tâm _ kim dương võng".3 January 2011. Archived fromthe originalon 3 January 2011.Retrieved20 April2022.
[edit]