Jump to content

Indian locomotive class WDG-2/3A

From Wikipedia, the free encyclopedia

WDG-3A
Ludhiana based WDG-3A at Jalandhar City.
Type and origin
Power typeDiesel
BuilderBLW,Diesel Loco Modernisation Works
ModelALCO-251C/ALCO DL560Cvariant
Build date1994-2015
Total producedWDG-3A:1,998
RebuilderDiesel Loco Modernisation Works, Patiala
Specifications
Configuration:
UICCo-Co
Gauge1,676 mm(5 ft 6 in)
BogiesHigh adhesion Fabricated bogies
Wheel diameter1,092 mm (3 ft 7 in)
Wheelbase12.834 m (42 ft1+14in)
Length17.85 m (58 ft6+34in)
Width3.016 m (9 ft10+34in)
Height4.162 m (13 ft7+78in)
Axle load23,500 kg (51,800 lb)
Loco weight127 t (125 long tons; 140 short tons)
Fuel typeDiesel
Fuel capacity6,000 L (1,300 imp gal; 1,600 US gal)
Prime moverALCO 251-C
RPMrange400 - 1,050 rpm
Engine typeV16Diesel engine
AspirationABBVTC304-15 orNapierNA 295 IRturbocharger
Traction motorsBHELTA 10102 CW (new), BHEL TG 10931 AZ(old)
Cylinders16
Cylinder size228 mm × 266 mm (8.98 in × 10.47 in)
borexstroke
TransmissionDiesel electric
MU working2
Loco brakeair dynamic brake
Train brakesAir,VacuumandDual
Performance figures
Maximum speed105 km/h (65 mph)
Power outputWDG-3A: 3,100 hp
Tractive effort37.90 t (37 long tons; 42 short tons)
Factor of adh.0.33
Career
OperatorsIndian Railways
Numbers14501-14999,Newer13000-13665
NicknamesShakti, Prabal, Jai Jawan
Localethroughout Indian Railways
First run1994
RetiredEarly 2020s-present
Preserved1[citation needed]
DispositionIn service

The Indian locomotive classWDG-3Ais a class ofdiesel-electric locomotivethat was developed in 1994 byBanaras Locomotive Works(BLW),Varanasi forIndian Railways.The model name stands forbroad-gauge (W),Diesel (D), Goods traffic (G) engine, 3,100 hp (3A) locomotive. They entered service on 18 July 1995. A total of 1,164 WDG-3A units were built between 1994 and 2015 atBLW,Varanasi with a few units being produced byDiesel Loco Modernisation Works(DLMW) and Parel Workshop.

It is the dedicated freight version of the very successfulWDM-2and shares the same engine and horsepower rating withWDM-3A.It is considered to be a successful locomotive class with high reliability and few maintenance problems. Despite the introduction of more modern types of locomotives likeWDG-4and electrification, a significant number are still in use, both in mainline and departmental duties.

As of September 2023, 787 locomotives still retain "operational status" on the mainline as WDG-3A, with a few examples having been converted toWAGC-3or WAG-10.

History

[edit]

The first units of this class was delivered on July 18, 1995, under the name of WDG-2.[1]The class was manufactured till end of 2015. All the older locomotives built by DLW had regular WDM-2 type square short hood profile and control stand position and the locomotives are rated at 3,100 HP.

From 2009 onward, they are equipped with Daulat Ram DBR, microprocessor control and an Auxiliary Power Unit (APU) in the short hood thus they bear external resemblance to theWDM-3Dclass.[2][3]The WDG3A has higher Tractive Effort (7.5 t more) and Axle Load (1.7 t) compared to the WDM3A despite having the same engine and horsepower rating. Many units of this class has been named "Shakti" and can easily be recognized by their orange livery with cream stripe & lightning bolts. BesidesIR,WDG-3A are being use by private companies for industrial uses, thermal power plants, port trusts, etc.

Production was stopped in 2015 when advanced locomotives like theWDG-4Dwere built, thus rendering the ALCO platform obsolete. Two WDG-4s can haul more goods than three WDG-3A combined. Meanwhile, Diesel Loco Works in Varanasi rebuilt few of the existing locomotives that had reached midlife into a purely electric twin section 10,000 hp (7,457 kW) locomotive, classifying them as the WAGC3.

The retirement of this class has begun due to electrification.[citation needed]

Sub Classes

[edit]

WDG-3B

[edit]

They were an experimental technical variant of the WDG3A with an upgraded ALCO engine to output 3,200 hp. But the experiment was unsuccessful and all units were reverted to normal WDG-3A. One of the locomotives of this class was numbered #14796.[4]

WDG-3C

[edit]

Another experimental class, but this time rated at 3300 hp. Only one unit (#14962) was produced and was painted in a unique "Dark Rose/Cheetah" livery.[5][6]This loco was derated to 2,600 hp, but is still with theKatnidiesel locomotive shed. This class was unsuccessful as well.

WDG-3D

[edit]

Freight version of theWDM-3D.Only one (#13301) unit was marked with this marking. It may possibly be rated at 3400 hp.[7][8]Now it has been derated to 2600 hp with WDG-3A class markings and homed at the Vatva Loco Shed.

Locomotive sheds

[edit]
Zone Name Shed Code Quantity
Central Railway Pune PA 20
Kalyan KYN (D) 16
Kurla CLA 31
Eastern Railway Andal UDL 13
Jamalpur JMP 40
East Central Railway Pt. Deendayal Upadhyaya DDU (D) 4
Samastipur SPJ 22
East Coast Railway Visakhapatnam VSKP (D) 43
Northern Railway Ludhiana LDH (D) 48
Lucknow LKO 25
Tughlakabad TKD (D) 10
North Central Railway Jhansi JHS (D) 25
North Eastern Railway Izzatnagar IZN 1
Northeast Frontier Railway Malda Town MLDT 19
Guwahati NGC 51
North Western Railway Abu Road ABR 9
Southern Railway Ernakulam ERS 9
Golden Rock GOC 14
Tondiarpet TNP 14
South Central Railway Guntakal GTL (D) 16
Vijayawada BZA (D) 11
Moula Ali MLY 31
South Eastern Railway Bondamunda BNDM (D) 29
South East Central Railway Motibagh MIB 34
South Western Railway Krishnarajapuram KJM 21
Western Railway Ratlam RTM 35
Sabarmati SBI 28
West Central Railway New Katni Jn. NKJ (D) 14
Total Locomotives Active as of September 2024[9] 633

Rebuilding into WAGC-3

[edit]

In 2018,Chittaranjan Locomotive Works,Banaras Locomotive WorksandResearch Design and Standards Organisationconverted a WDG-3A into a purely electric, twin-section 10,000 hp (7,457 kW) locomotive, classified as theWAGC3.[10]This locomotive was the result of the initiative taken up by the Railway Board in November 2017, asking RDSO to work out details of conversion of diesel locos to electric locos. RDSO had suggested that such conversion would be possible with retaining the Motorized Truck assembly (which includes traction motors and drive side traction converters), computer controlled brakes (CCBs) and other relevant parts, suitably redesigning the under-frame and superstructure and adding the conversion kit. It was completed in only 69 days.[11][12]Both units will together be considered as one asset and one locomotive by Indian Railways. Only a single unit has been produced so far[when?]and it is in service. It has been given to Bondamumda Shed of SER.

Technical specifications

[edit]

Technical details are as follows:[13][14]

Manufacturers DLW
Engine Alco 251-C, 16cylinder,3,100hp(2,300kW), (3,007 hp or 2,242 kW site rating, earlier 2,900hp(2,200kW)) with Napier NA2951R/ ABB VTC-304-VG15/ GE 7s 1716 turbo supercharged engine. 1,050 rpm max, 400 rpm idle; 228.6 mm × 266.7 mm (9.00 in × 10.50 in) bore x stroke; compression ratio 12.5:1. Direct fuel injection, centrifugal pump cooling system (2,457 L/min (540 imp gal/min; 649 US gal/min) at 1,050 rpm), fan driven byeddy currentclutch (90 hp or 67 kW at 1,050 rpm)
Governor EDC/ Woodward 8574-650
Transmission Electric, withBHELTA 10102 CWalternator(1,050 rpm, 1,100 V, 4,400amperes) (Earlier used BHEL TG 10931 AZ alternator)
Traction motors BHEL TM 4906 AZ/ 4907 BZ (435 hp or 324 kW) (withroller bearings)
Axle load 18.8 tonnes (18.5 long tons; 20.7 short tons), total weight 112.8 t (111.0 long tons; 124.3 short tons)
Bogies AlcoHigh Adhesion Fabricated Bogies
Starting TE 40 t (39 long tons; 44 short tons) at adhesion 30.8%, continuous 37.05 t (36.46 long tons; 40.84 short tons)
Length overbuffer beams 17,850 mm (58 ft6+34in)
Distance between bogies 11,500 mm (37 ft8+34in)

See also

[edit]

References

[edit]
  1. ^"IR History: Part - V (1970-1995)".Indian Railways Fan Club.Retrieved22 August2017.
  2. ^"Company Profile"(PDF).indianrailways.gov.in.Indian Railways.Retrieved2 March2018.
  3. ^"Motive Power"(PDF).indianrailways.gov.in.RDSO. 2018.Retrieved2 March2018.
  4. ^Theevandi (6 January 2014)."Diesel Locomotive Roster – The WDP and WDG Series!".24 Coaches.Retrieved29 June2019.
  5. ^"wdg3_cheetah.jpg".irfca.org.Retrieved29 June2019.
  6. ^"agf_trip2.jpg".irfca.org.Retrieved29 June2019.
  7. ^"WDG-3D #13301".
  8. ^"[IRFCA] Indian Railways Locomotive Roster Vatva (VTA) WDG-3A 13301 Show".irfca.org.Retrieved29 June2019.
  9. ^"Railway Website Mechanical Department".Retrieved16 May2020.
  10. ^"Indian Railways creates history! Converts diesel loco to 'Make in India' electric locomotive; watch video".The Financial Express.3 March 2018.Retrieved1 October2018.
  11. ^"DLW/Varanasi converts WAGC3-class Diesel Locomotive from Diesel to Electric Traction – RailNews Media India Ltd".Retrieved29 June2019.
  12. ^Singh, Binay (3 March 2018)."Diesel Locomotive Works (DLW): Indian Railways creates history by converting diesel locomotive into electric India".The Times of India.Retrieved29 June2019.
  13. ^"Diesel Locomotive Classes – Broad Gauge".Indian Railways Fan Club.
  14. ^"WDG3A - 3100 HP Goods Locomotive"(PDF).Archived fromthe original(PDF)on 15 December 2017.Retrieved22 June2019.