Jump to content

Lille Metro

From Wikipedia, the free encyclopedia

Lille Metro
Oscar Lambret metro station
Oscar Lambret metro station
Overview
Native nameMétro de Lille
LocaleLille,Nord,Hauts-de-France,France
Transit typeMedium-capacity rail system
Number of lines2[1]
Number of stations60[1]
Daily ridership271,230 (2011)[2]
Annual ridership99 million (2011)[2]
WebsiteIlevia
Operation
Began operation1983[3]
Operator(s)Ilevia
Technical
System length45 km (28 mi)[1]
Track gaugeno gauge,Rubber-tyred metrowithguide rail
System map
Lille Metro

Line 2

CH Dron depôt
CH Dron
Bourgogne
Pont de Neuville
Phalempins
Colbert
Tourcoing – CentreLille tramway
Gare de Tourcoing
Carliers
Mercure
Alsace
Gare Jean-Lebas RoubaixSNCF
Roubaix – Grand-Place
EurotéléportLille tramway
future Line 3
Roubaix – Charles-de-Gaulle
Épeule – Montesquieu
Saint-Philibert depôt
Mairie de Croix
Saint-Philibert
Croix – Centre
Bourg
Wasquehal – Hôtel de Ville
Maison des Enfants
Wasquehal – Pavé de LilleLille tramway
Mitterie
Jean-Jaurès
Pont Supérieur
Lomme – Lambersart
Les Prés – Edgard Pisani
Canteleu
Fort de Mons storage
Bois Blancs
Fort de Mons
Mairie de Mons
Port de Lille
Mons Sarts
Cormontaigne
Saint-Maurice – Pellevoisin
Montebello
Gare Lille EuropeLille tramwayLille tramwaySNCF
Gambetta
République – Beaux-Arts
Wazemmes
Rihour
Porte des Postes
Gare Lille FlandresLille tramwayLille tramwaySNCF
connection between lines
Mairie de Lille
Porte d'Arras
Lille Grand-Palais
Porte de Douai
future Gare de Lille-
Saint-Sauveur
Porte de Valenciennes
SNCF
CHU – Centre
Oscar Lambret
Caulier
CHU – Eurasanté
Fives
Jeanne de Flandre
Eurasanté
Marbrerie
Mairie d'Hellemmes
Square Flandres
Pont de BoisSNCF
Villeneuve-d'Ascq -
Hôtel de Ville
Triolo
Cité Scientifique
Quatre Cantons
Quatre Cantons depôt

Line 1

TheLille Metro(French:Métro de Lille) is a driverlesslight metrosystem located inLille,France.It was opened on 25 April 1983 and was the first to use theVAL(French:véhiculeautomatiqueléger,English:light automated vehicle) system. While often referred to as the first fully automated driverless metro of any kind in the world,[4]thePort LinerinKobe,Japanpredates it by two years. The light metro system is made up of two lines that serve 60 stations, and runs over 45 kilometres (28 mi) of route.[1]

The system forms part of a multi-modal public transport system covering the Lille metropolitan area, along with thebusesandtrams,operated under theIleviabrand.

History

[edit]

In the 1960s the decentralisation of the city of Lille was considered; some towns of the Lille region were isolated and were poorly served by existing public transport, while the centre of Lille was congested with traffic and buses. The decentralisation resulted in the creation of the Public Establishment of Lille East development (EPALE) in 1968. In the 1970s, a plan for a proposed four line light metro system was developed, favouring the VAL system over conventional rail systems.

Construction of Line 1

[edit]

Construction started in 1978, and the first section was opened on 25 April 1983 betweenQuatre Cantons( "Four Townships" ) andRépublique.On 2 May 1984 line 1 was completed, with a length of 13.5 kilometres (8.4 mi) (8.5 kilometres or 5.3 miles underground), linkingCHR B Calmette(centre hospitalier régional:"regional hospital centre" ) toQuatre CantonsviaGare de Lille Flandres.

Line 1 extension and the creation of a second line

[edit]

While line one opened in April 1983 between 4 Cantons and République; it was extended, with the extension from République and C.H.R. B Calmette opening on 2 May 1984. The cost of opening the first line in both its phases cost about 2 billion Francs.[citation needed]

Construction of line two began in April 1985. A depot was opened on the second line at Villeneuve d'Ascq, after the terminus of the line Saint Philibert in Lomme. Line one became operational in late 1988 with testing being carried out for four months. In 1989, COMELI which runs the metro merged with COTRALI, which runs the bus and tram networks into a unified public transport body.

Line 2 opened on 3 April 1989 and it connects Lille with its two large suburban towns,RoubaixandTourcoing,reachingCH Dron(centre hospitalier:"hospital centre" ) near theBelgianborder on 27 October 2000. It is 32 kilometres (20 mi) long with 44 stations.[citation needed] Both lines haveplatform screen doorsat all stations, being the second metro to have platform doors, after theSaint Petersburg Metro.

The section between Lille and neighbouring towns ofRoubaixandTourcoingwas built and opened in four stages. The first extension was inaugurated on 5 May 1994; the underground section has a length of 500 metres (1,640 ft 5 in) and connects the Euralille business area to the rest of Lille.

The third part is the longest to be opened, making about 13 km (8.1 mi). It became operational in March 1999 and commissioned on 18 August that year. This section goes through the towns ofVilleneuve d'Ascq,Wasquehal,Croix, Roubaix and stops in downtown Tourcoing. Though the route is mainly underground, the metro runs on a 1.3 km (0.81 mi) viaduct between the stations ofFort MonsandJean-Jaures.The final section was inaugurated on 27 October 2000 by Prime MinisterLionel Jospin.

Plans for third and fourth lines

[edit]

While a system of four lines was initially planned in the 1970s only two lines have been built. Lille Métropole Urban Community (now called CUDL) indicates in its urban transport plan (PDU) adopted in June 2000 that 'the subway construction cost does not allow new achievements'. In 2003 a third line was estimated to cost €810 million; a cost considered prohibitive so the city explored surface networks instead; making investments in its bus and tram systems. In 2010, the vice president of urban transport, Eric Quiquet confirms this decision by stating that the LMCU 'plans no more new metro lines' and that 'the priority is the development of the network of buses, urban tramway, the tram-train'.

Map

[edit]

Map

Operations

[edit]
VAL tracks on the system.

Line 1 is 13.5 kilometres (8.4 mi) long (8.5 kilometres (5.3 mi) of which is underground) and serves 18 stations.[5]

Trains are2 metres (6 ft6+34in) wide and26 metres (85 ft3+58in) long (composed of permanently coupled two-car sets), and arerubber-tyred.Platforms are52 metres (170 ft7+14in) in length (though only half of the platform length is currently open to the public), long enough for two units. Each unit can carry 156 passengers.

The metro operates from 5:00 a.m. until midnight, with trains every 1½ to 4 minutes (every 66 seconds duringrush hour), and every 6 to 8 minutes early mornings and evenings.[6]On Sundays there is a train every 2 to 6 minutes.[6]A one-way ticket costs €1.80.[7]

Planned capacity expansion

[edit]

Since January 2013, work to double the capacity of Line 1 has been ongoing. The platforms are being lengthened to be used with new 52 metres (170 ft 7 in) long trains built byAlstom.This expansion was expected to be complete in autumn 2017,[8]but was still not completed as of January 2024.[9]The formerVAL 208of the first line will then be transferred to Line 2 to increase its passenger capacity as well.[10]

[edit]

See also

[edit]

References

[edit]
  1. ^abcd"Les chiffres clés"[Key figures] (in French). Transpole. Archived fromthe originalon 27 October 2012.Retrieved25 September2012.
  2. ^ab"Les chiffres de fréquentation Transpole 2011"[The figures of frequentation Transpole 2011] (in French). Lille Transport - Parlons mobilité. 11 February 2012.Retrieved25 September2013.
  3. ^"Qui sommes-nous? - Notre Histoire"[Who are we? - Our History] (in French). Transpole. Archived fromthe originalon 25 September 2012.Retrieved25 September2012.
  4. ^Bushell, Chris, ed. Jane's Urban Transport Systems 1995-96. Surrey, United Kingdom: Jane's Information Group; 1995. p178, 472
  5. ^"De 26 à 52 métres: un métro deux fois plus long pour une capacité de transport renforcée"[From 26 to 52 meters: a subway twice as long for increased transport capacity] (in French). Lille Metropole Communauté Urbaine.Retrieved26 June2015.
  6. ^ab"Les lignes de métro"[The lines of the metro] (in French). Transpole. Archived fromthe originalon 27 September 2013.Retrieved25 September2013.
  7. ^"Les titres occasionnels"[The occasional (titles)] (in French). Transpole.Retrieved25 September2013.
  8. ^"Nouvelle ligne 1: Alstom entame la modification des rames"[New Line 1: Alstom starts the modification of trains] (in French). Lille Metropole Communauté Urbaine. 23 September 2013.Retrieved26 June2015.
  9. ^[1]
  10. ^"La nouvelle ligne 1: plus de de fluidité, plus de confort, plus de services"[The new line 1: more fluidity, more comfort, more services] (in French). Lille Metropole Communauté Urbaine. Archived fromthe originalon 27 June 2015.Retrieved26 June2015.Menés entre 2013 et 2017, ces travaux répondent à la hausse constante du trafic de la ligne 1. Ils visent à anticiper sa saturation future, par une augmentation de sa capacité de transport. [Carried out between 2013 and 2017, these works respond to the constant increase in traffic on line 1. They aim to anticipate its future saturation by increasing its transport capacity.]
[edit]

Media related toLille Metroat Wikimedia Commons