List of Artemis missions

From Wikipedia, the free encyclopedia

Emblem of the Artemis program

TheArtemis programis ahuman spaceflightprogram by theUnited States.The Artemis program is intended to reestablish a human presence on the Moon for the first time since Apollo 17 in 1972; mid-term objectives include establishing an international expedition team, and a sustainable human presence on the Moon. Long-term objectives for Artemis are laying the foundations for the extraction of lunar resources, and eventually making crewed missions to Mars and beyond feasible.

To date, missions in the program are aimed atexploration of the Moon,including crewed and robotic exploration of the lunar surface. Three flights of theOrion Multi-Purpose Crew Vehicleare currently planned for launch in the Artemis program in the early 2020s, beginning withArtemis 1.Before Artemis was named, the flights were referred to as "Orion missions". Numerous supporting scientific and technology demonstration missions are planned for launch under the program'sCommercial Lunar Payload Services(CLPS), in addition to planned and proposed uncrewed logistical missions to construct and resupply theGatewayand its expendable and reusablelunar landersinlunar orbit.

Main missions[edit]

Mission Launch date Crew Launch vehicle[a] Launch pad Duration[b]
EFT-1
5 December 2014
Uncrewed mission
Delta IV Heavy Cape Canaveral Space Force Station,SLC-37B 4h24m (success)
Exploration Flight Test 1, high apogee high reentry test, carrying an uncrewedOrion capsuleon its first spaceflight
Artemis 1
Artemis 1 insignia
16 November 2022[1][2]
Uncrewed mission
SLS Block 1Crew Kennedy Space Center,LC-39B 25.5d (success)
Maiden flight of the SLS, formerly "Exploration Mission 1" (EM1), carrying an uncrewedOrion capsuleand tenCubeSatsselected through several programs.[3]The payloads were sent on atrans-lunar injectiontrajectory.[4][5]
Artemis 2 September 2025[6] United StatesReid Wiseman
United StatesVictor Glover
United StatesChristina Koch
CanadaJeremy Hansen
SLS Block 1 Crew Kennedy Space Center,LC-39B ≈10d
First crewed flight, carrying four crew members on acircumlunar free-return trajectory.
Artemis 3 September 2026[6] TBA SLS Block 1 Crew Kennedy Space Center,LC-39B ≈30d
Carrying Artemis III mission hardware. First lunar landing of the Artemis program.[7]
Artemis 4 September 2028[8][9] TBA SLS Block 1B Crew Kennedy Space Center,LC-39B ≈30d
Second Artemis Lunar landing. Debut of the SLS Block 1B and theExploration Upper Stage.Co-manifested delivery of theI-HABmodule to theLunar Gateway,[10][11]followed by a crewed lunar landing.[12]
Artemis 5 March 2030[13][14] TBA SLS Block 1B Crew Kennedy Space Center,LC-39B ≈30d
Co-manifested delivery of theESPRITRefueling Module to theLunar Gateway.[15]
Artemis 6 March 2031[16] TBA SLS Block 1B Crew Kennedy Space Center,LC-39B ≈30d
Artemis 7 March 2032[17][18] TBA SLS Block 1B Crew Kennedy Space Center,LC-39B ≈30d
Artemis 8 2033 (presumed)[18] TBA SLS Block 1B Crew Kennedy Space Center,LC-39B ≈30d
Artemis 9 (proposed) 2034 (presumed)[19] TBA SLS Block 2 Crew Kennedy Space Center,LC-39B ≈30d
Artemis 10 (proposed) 2035 (presumed) TBA SLS Block 2 Crew Kennedy Space Center,LC-39B <180d

Support missions[edit]

Technology demonstrations[edit]

Launched on 28 June 2022,[20]theCislunar Autonomous Positioning System Technology Operations and Navigation Experiment( "CAPSTONE" ) mission is a small (25 kg) technology-demonstration spacecraft designed to test a low-energy trans-lunar trajectories and to demonstrate thenear-rectilinear halo orbit(NRHO) intended to support lunar polar missions.[21]

Surface missions[edit]

Peregrine(left) andNova-C(right) will be the first two robotic landers to directly support the Artemis program.

TheCommercial Lunar Payload Services(CLPS) program will support the Artemis program by landing several small payloads focused on scouting forlunar resources,in situ resource utilization(ISRU) experiments and lunar science, in preparation for an extended human presence on the lunar surface.[22][23][24]

List of CLPS missions
Mission Launch date Operator Lander Rover Launch pad Launch vehicle[a] Duration[b] References
Peregrine Mission One 8 January 2024 Astrobotic Peregrine Iris Cape Canaveral,SLC-41 Vulcan Centaur 10 days (failure) [25]
The lander carried multiple payloads, with a total payload mass capacity of 90 kg.[26]However, the spacecraft was unable to reach the moon because of a propellant leak. It burned up over thePacific Oceanon 18 January.[27]
IM-1 15 February 2024 Intuitive Machines Nova-C Kennedy Space Center,LC-39A Falcon 9 7 days [28]
The lander carried six NASA-sponsored instruments, as well as six payloads from other customers, including EagleCAM.[29]TheOdysseuslander successfully touched down atMalapert Anear thelunar south poleon 22 February 2024.[30]The mission ended after 7 days with the onset of lunar night, after which no further signals from the spacecraft were received.[31]
Blue GhostM1 Q3 2024 Firefly Aerospace Blue Ghost TBA Falcon 9 ≈2 weeks [32][33][34]
Griffin Mission One November 2024 Astrobotic Griffin VIPER Kennedy Space Center,LC-39A Falcon Heavy ≈100 Earth days [35][36]
IM-2 Q4 2024 Intuitive Machines Nova-C Kennedy Space Center,LC-39A Falcon 9 [37]
IM-3 Q1 2025 Intuitive Machines Nova-C Lunar Vertex,CADRE× 4 Kennedy Space Center,LC-39A Falcon 9 ≈9-10 Earth days [37][38][39]
TBA H1 2025 TBA TBA TBA TBA TBA ≈9-10 Earth days [40]
TBA Q4 2025 – Q1 2026 TBA TBA TBA TBA TBA ≈9-10 Earth days [40]
ispace Mission 3 2026 ispace/Draper APEX 1.0 TBA TBA ≈9-10 Earth days [41][42][43]

Logistics missions[edit]

Artist's impression of the Power and Propulsion Element, the first module of the Lunar Gateway, in lunar orbit. It will generate 50 kW (67 hp) of solar electric power for itsion thrusters,life support, and other systems.

Uncrewed missions to assemble and resupply theGatewaywill be executed as part of the Artemis program.[44]

List of Gateway logistics missions
Launch date Payload
2025[6] HLSUncrewed Lunar Demo forArtemis 3
November 2025[45] Power and Propulsion Element(PPE)
Habitation and Logistics Outpost(HALO)
September 2026[6] HLSCrewed Lunar Demo
September 2028[17] International Habitation Module(I-HAB) forArtemis 4
September 2028[17] SustainingHLSCrewed Lunar Demo
2028[46] Dragon XL(GLS-1)
September 2029[17] ESPRITRefueling Module (ERM) forArtemis 5
2029[17] GLS-2
September 2030[17] Crew and Science Airlock module forArtemis 6
September 2030[17] GLS-3
September 2031[17] GLS-4 forArtemis 7

See also[edit]

Notes[edit]

  1. ^abSerial number displayed in parentheses.
  2. ^abTime displayed in days, hours, minutes, and seconds.

References[edit]

  1. ^Wattles, Jackie (8 November 2022)."NASA's Artemis I mission delayed again as storm barrels toward launch site".CNN.Warner Bros Discovery.Retrieved9 November2022.
  2. ^"NASA Prepares Rocket, Spacecraft Ahead of Tropical Storm Nicole, Re-targets Launch".NASA.8 November 2022.Retrieved9 November2022.
  3. ^Harbaugh, Jennifer (4 October 2021)."All Artemis I Secondary Payloads Installed in Rocket's Orion Stage Adapter".NASA.Retrieved9 November2021.
  4. ^Crane, Aimee (11 June 2019)."Artemis 1 Flight Control Team Simulates Mission Scenarios".NASA.Archivedfrom the original on 6 August 2019.Retrieved6 August2019....after the Space Launch System performs the Trans-Lunar Injection burn that sends the spacecraft out of Earth orbit and toward the Moon.Public DomainThis article incorporates text from this source, which is in thepublic domain.
  5. ^Clark, Stephen (22 July 2019)."First moon-bound Orion crew capsule declared complete, major tests remain".Spaceflight Now.Archivedfrom the original on 6 August 2019.Retrieved6 August2019.The Artemis 1 mission profile. Credit: NASA [...] The Artemis 1 mission will send the Orion spacecraft into a distant retrograde lunar orbit and back...
  6. ^abcdSmith, Marcia (9 January 2024)."NASA Delays Next Artemis Missions to 2025 and 2026".SpacePolicyOnline.Retrieved10 January2024.
  7. ^Foust, Jeff (9 November 2021)."NASA delays human lunar landing to at least 2025".SpaceNews.Retrieved9 November2021.
  8. ^"Gateway Space Station - NASA".12 June 2023.Retrieved4 May2024.
  9. ^"Gateway: Forward Progress on Artemis IV - NASA".30 April 2024.Retrieved4 May2024.
  10. ^Loff, Sarah (15 October 2019)."NASA Commits to Future Artemis Missions With More SLS Rocket Stages".NASA.Retrieved16 October2019.Public DomainThis article incorporates text from this source, which is in thepublic domain.
  11. ^"FY 2022 Budget Estimates – Gateway – Program Projects – International Habitat (I-Hab)"(PDF).NASA. 6 May 2021. p. 97 (DEXP-67).Retrieved27 August2021.Delivery of I-Hab to the Gateway will be via the SLS Block 1B launch vehicle with Orion providing orbital insertion and docking.Public DomainThis article incorporates text from this source, which is in thepublic domain.
  12. ^Foust, Jeff (30 October 2022)."Lunar landing restored for Artemis 4 mission".SpaceNews.Retrieved31 October2022.
  13. ^"Gateway Space Station - NASA".12 June 2023.Retrieved4 May2024.
  14. ^"NASA Selects Blue Origin as Second Artemis Lunar Lander Provider - NASA".Retrieved4 May2024.
  15. ^Foust, Jeff (20 January 2022)."NASA foresees gap in lunar landings after Artemis 3".SpaceNews.Retrieved20 January2022.
  16. ^"Gateway Space Station - NASA".12 June 2023.Retrieved4 May2024.
  17. ^abcdefghFoust, Jeff (13 March 2023)."NASA planning to spend up to $1 billion on space station deorbit module".SpaceNews.Retrieved13 March2023.
  18. ^abFoust, Jeff [@jeff_foust] (31 October 2022)."The current Artemis planning manifest, now updated to include a lunar landing on Artemis 4"(Tweet).Retrieved31 October2022– viaTwitter.
  19. ^"NASA Exploration Production and Operations Long-Term Sustainability Request for Information (RFI)".GovTribe.25 October 2021. p. 5.Retrieved6 November2021.
  20. ^Dodson, Gerelle (June 28, 2022), "CAPSTONE Launches to Test New Orbit for NASA’s Artemis Moon Missions",NASA RELEASE 22-067. Retrieved 21 June 2022.
  21. ^Hall, Laura (Apr. 29, 2022). "What is CAPSTONE",NASA. Retrieved 21 June 2022.
  22. ^NASA taps 3 companies for commercial moon missionsWilliam HarwoodCBS News31 May 2019
  23. ^NASA awards contracts to three companies to land payloads on the moonJeff FoustSpaceNews31 May 2019
  24. ^"NASA Expands Plans for Moon Exploration: More Missions, More Science".NASA. 30 April 2018.Retrieved4 June2018.Public DomainThis article incorporates text from this source, which is in thepublic domain.
  25. ^"US Moon mission on course for fiery destruction".BBC News.18 January 2024.Retrieved18 January2024.
  26. ^"NASA – NSSDCA – Spacecraft – Details".nssdc.gsfc.nasa.gov.Archivedfrom the original on 4 December 2023.Retrieved31 October2023.
  27. ^Wattles, Jackie (19 January 2024)."Astrobotic's Peregrine lunar lander burns up over Pacific Ocean".CNN.Retrieved19 January2024.
  28. ^Foust, Jeff (19 December 2023)."Intuitive Machines delays first lunar lander launch to February".SpaceNews.Retrieved20 December2023.
  29. ^"Media teleconference - Lunar Delivery Readiness for First Intuitive Machines Moon Flight".NASA. 13 February 2024.(Page will play audio when loaded)
  30. ^"Intuitive Machines lands on the moon in historic first for a U.S. company".22 February 2024.
  31. ^"IM-1 Mission Updates".intuitivemachines. 23 March 2024.
  32. ^Alamalhoadei, Aria (6 November 2023)."Firefly's Blue Ghost lander represents a big bet on a future lunar economy".TechCrunch.Retrieved6 November2023.
  33. ^"Firefly Completes Integration Readiness Review of its Blue Ghost Lunar Lander".Firefly Aerospace.26 April 2022. Archived fromthe originalon 1 May 2022.Retrieved1 May2022.
  34. ^"Firefly Aerospace Awards Contract to SpaceX to Launch Blue Ghost Mission to Moon in 2023".Business Wire. 20 May 2021.Retrieved24 May2021.
  35. ^"NASA Replans CLPS Delivery of VIPER to 2024 to Reduce Risk".NASA.18 July 2022.Retrieved18 July2022.
  36. ^Foust, Jeff (13 April 2021)."Astrobotic selects Falcon Heavy to launch NASA's VIPER lunar rover".SpaceNews.Retrieved14 April2021.
  37. ^abFoust, Jeff (13 February 2024)."Intuitive Machines ready for launch of its first lunar lander".SpaceNews.Retrieved17 February2024.
  38. ^"NASA Selects Intuitive Machines to Deliver 4 Lunar Payloads in 2024".Intuitive Machines.17 November 2021.Retrieved17 November2021.
  39. ^"NASA Selects Intuitive Machines for New Lunar Science Delivery".NASA(Press release). 17 November 2021.Retrieved17 November2021.
  40. ^ab"Amendment 34: Payloads and Research Investigations on the Surface of the Moon (PRISM) final text and due dates"(PDF).NASA. 2 September 2021.Retrieved9 September2021.Public DomainThis article incorporates text from this source, which is in thepublic domain.
  41. ^Foust, Jeff (29 September 2023)."Ispace revises design of lunar lander for NASA CLPS mission".SpaceNews.Retrieved30 September2023.
  42. ^"ispace - U.S. Announces new U.S. Headquarters, Unveils APEX 1.0 Lunar Lander, Provides Updates on Mission 3".ispace.29 September 2023.Retrieved30 September2023.
  43. ^"NASA Selects Draper to Fly Research to Far Side of Moon".NASA(Press release). 21 July 2022.Retrieved18 November2022.
  44. ^Foust 2019,"After Artemis 3, NASA would launch four additional crewed missions to the lunar surface between 2025 and 2028. Meanwhile, the agency would work to expand the Gateway by launching additional components and crew vehicles and laying the foundation for an eventual Moon base".
  45. ^"Gateway".NASA.13 July 2023.Retrieved2 September2023.Public DomainThis article incorporates text from this source, which is in thepublic domain.
  46. ^Foust, Jeff (24 February 2023)."NASA plans to start work this year on first Gateway logistics mission".SpaceNews.Retrieved13 March2023.

External links[edit]