Jump to content

Polar Satellite Launch Vehicle

From Wikipedia, the free encyclopedia
(Redirected fromPSLV)

Polar Satellite Launch Vehicle
PSLV-C35 on theSDSC FLP
FunctionMedium-lift launch system
ManufacturerISRO
Country of originIndia
Cost per launch130crore(equivalent to153 crore or US$18 million in 2023)
-200crore(equivalent to235 crore or US$28 million in 2023)[1]
Size
Height44 m (144 ft)
Diameter2.8 m (9 ft 2 in)
MassPSLV-G:295,000 kg (650,000 lb)
PSLV-CA:230,000 kg (510,000 lb)
PSLV-XL:320,000 kg (710,000 lb)[2]
Stages4
Capacity
Payload toLEO(200 km @ 30° inclination)
Mass
  • G:3,200 kg (7,100 lb)
  • CA:2,100 kg (4,600 lb)
  • XL:3,800 kg (8,400 lb)
[3][4]
Payload toSSO(620 km circular)
Mass
  • G:1,600 kg (3,500 lb)
  • CA:1,100 kg (2,400 lb)
  • XL:1,750 kg (3,860 lb)
[3][2][5]
Payload toSub-GTO(284 × 20650 km)
Mass1,425 kg (3,142 lb)
(PSLV-XL)[2][5]
Payload toGTO
Mass
  • G:1,150 kg (2,540 lb)
  • XL:1,300 kg (2,900 lb)
[3][6]
Associated rockets
ComparableVega,Nuri
Launch history
StatusActive
Launch sitesSatish Dhawan Space Centre
Total launches60
Success(es)57
Failure(s)2
Partial failure(s)1
First flight
  • PSLV-G:20 September 1993
  • PSLV-CA:23 April 2007
  • PSLV-XL:22 October 2008
  • PSLV-DL:24 January 2019
  • PSLV-QL:1 April 2019
Last flight
  • PSLV-G:26 September 2016
  • PSLV-CA:30 July 2023
  • PSLV-XL:2 September 2023
  • PSLV-DL:1 January 2024
  • PSLV-QL:11 December 2019
Type of passengers/cargo
Boosters (PSLV-G) – S9
No. boosters6
Maximum thrust510 kN (110,000 lbf)
Specific impulse262 s (2.57 km/s)
Burn time44 s
PropellantHTPB
Boosters (PSLV-XL/QL/DL) – S12
No. boosters6 (XL)
4 (QL)
2 (DL)
Height12 m (39 ft)[7]
Diameter1 m (3 ft 3 in)
Propellant mass12,200 kg (26,900 lb) each
Powered byoff
Maximum thrust703.5 kN (158,200 lbf)[8]
Total thrust4,221 kN (949,000 lbf) (XL)
2,814 kN (633,000 lbf) (QL)
1,407 kN (316,000 lbf) (DL)
Specific impulse262 s (2.57 km/s)
Burn time70 s
PropellantHTPB
First stage
Height20 m (66 ft)[7]
Diameter2.8 m (9 ft 2 in)
Propellant mass138,200 kg (304,700 lb) each[7][2]
Powered byS139
Maximum thrust4,846.9 kN (1,089,600 lbf)[8]
Specific impulse237 s (2.32 km/s) (sea level)
269 s (2.64 km/s) (vacuum)
Burn time110 s
PropellantHTPB
Second stage
Height12.8 m (42 ft)[7]
Diameter2.8 m (9 ft 2 in)
Propellant mass42,000 kg (93,000 lb) each[7]
Powered by1Vikas
Maximum thrust803.7 kN (180,700 lbf)[8]
Specific impulse293 s (2.87 km/s)
Burn time133 s
PropellantN2O4/UDMH
Third stage
Height3.6 m (12 ft)[7]
Diameter2 m (6 ft 7 in)
Propellant mass7,600 kg (16,800 lb) each[7]
Powered byS-7[9]
Maximum thrust250 kN (56,000 lbf)
Specific impulse295 s (2.89 km/s)
Burn time113.5 s[10]
PropellantHTPB
Fourth stage
Height3 m (9.8 ft)[7]
Diameter1.3 m (4 ft 3 in)
Propellant mass2,500 kg (5,500 lb) each[7]
Powered by2 x L-2-5[9]
Maximum thrust14.66 kN (3,300 lbf)[8]
Specific impulse308 s (3.02 km/s)
Burn time525 s
PropellantMMH/MON

ThePolar Satellite Launch Vehicle(PSLV) is anexpendablemedium-lift launch vehicledesigned and operated by theIndian Space Research Organisation(ISRO). It was developed to allow India to launch itsIndian Remote Sensing(IRS)satellitesintoSun-synchronous orbits,a service that was, until the advent of the PSLV in 1993, only commercially available from Russia. PSLV can also launch small size satellites intoGeostationary Transfer Orbit(GTO).[11]

Some notable payloads launched by PSLV include India's firstlunarprobeChandrayaan-1,India's firstinterplanetary mission,Mars Orbiter Mission(Mangalyaan), India's firstspace observatory,Astrosatand India's firstSolar mission,Aditya-L1.[2]

PSLV has gained credibility as a leading provider ofrideshareservices for small satellites, owing to its numerous multi-satellite deployment campaigns with auxiliary payloads, usually ride-sharing along with an Indian primary payload.[12]As of June 2022, PSLV has launched345 foreign satellitesfrom 36 countries.[13]Most notable among these was the launch ofPSLV-C37on 15 February 2017, successfully deploying 104 satellites in Sun-synchronous orbit, tripling the previous record held by Russia for the highest number of satellites sent to space on a single launch,[14][15]until 24 January 2021, whenSpaceXlaunched the Transporter-1 mission on aFalcon 9rocket carrying 143 satellites into orbit.[16]

Payloads can be integrated in tandem configuration employing a Dual Launch Adapter.[17][18]Smaller payloads are also placed on equipment deck and customized payload adapters.[19]

Development[edit]

PSLV-C11 strap-on

Studies by the PSLV Planning group underS Srinivasanto develop a vehicle capable of delivering a 600 kg payload to a 550 kmsun-synchronous orbitfromSHARbegan in 1978.[20][21]Among 35 proposed configurations, four were picked; by November 1980, a vehicle configuration with two strap-ons on a core booster (S80) with 80 tonne solid propellant loading each, a liquid stage with 30 tonne propellant load (L30), and an upper stage called the Perigee-Apogee System (PAS) was being considered.[22][23][24][25]

By 1981, confidence grew inremote sensing spacecraftdevelopment with the launch ofBhaskara-1,and the PSLV project objectives were upgraded to have the vehicle deliver a 1000 kg payload into a 900 kmSSO.As technology transfer ofVikingrocket engine firmed up, a new lighter configuration with the inclusion of a liquid powered stage was selected.[26]Funding was approved in July 1982 for the finalized design, employing a single large S125 solid core as first stage with six 9 tonne strap-ons (S9) derived from theSLV-3first stage, liquid fueled second stage (L33), and two solid upper stages (S7 and S2.) This configuration needed further improvement to meet the orbital injection accuracy requirements of IRS satellites, and hence, the solid terminal stage (S2) was replaced with a pressure fed liquid fueled stage (L1.8 or LUS) powered by twin engines derived from roll control engines of the first stage. Apart from increasing precision, liquid upper stage also absorbed any deviation in performance of solid third stage. The final configuration ofPSLV-D1to fly in 1993 was (6 × S9 + S125) + L37.5 + S7 + L2.[23][24]

Theinertial navigation systemsare developed byISRO Inertial Systems Unit(IISU) atThiruvananthapuram.The liquid propulsion for the second and fourth stages of the PSLV as well as theReaction control systems(RCS) are developed by theLiquid Propulsion Systems Centre(LPSC) atValiamalanearThiruvananthapuram,kerala.The solidpropellant motorsare processed atSatish Dhawan Space Centre(SHAR) atSriharikota,Andhra Pradesh,which also carries out launch operations.

The PSLV was first launched on 20 September 1993.[27][28]The first and second stages performed as expected, but anattitude controlproblem led to the collision of the second and third stages at separation, and the payload failed to reach orbit.[29]After this initial setback, the PSLV successfully completed its second mission in 1994.[30]The fourth launch of PSLV suffered a partial failure in 1997, leaving its payload in a lower than planned orbit. In November 2014, the PSLV had launched 34 times with no further failures.[31](Although launch 41: August 2017 PSLV-C39 was unsuccessful.[2])

PSLV continues to support Indian and foreign satellite launches especially forlow Earth orbit(LEO) satellites. It has undergone several improvements with each subsequent version, especially those involving thrust, efficiency as well as weight. In November 2013, it was used to launch theMars Orbiter Mission,India's first interplanetary probe.[32]

In June 2018, the Union Cabinet approved6,131crore(equivalent to72 billion or US$860 million in 2023) for 30 operational flights of the PSLV scheduled to take place between 2019 and 2024.[33]

ISRO is working towards handing over the production and operation of PSLV to private industry through a joint venture.[34]On 16 August 2019,NewSpace India Limitedissued aninvitation to tenderfor manufacturing PSLV entirely by private industries.[35][36]On 5 September 2022,NewSpace India Limitedsigned a contract withHindustan Aeronautics LimitedandLarsen & Toubroled conglomerate for the production of five PSLV-XL launch vehicles after they won competitive bidding. Under this contract, they have to deliver their first PSLV-XL within 24 months and the remaining four vehicles every six months.[37][38][39]

Vehicle description[edit]

The PSLV has four stages, using solid and liquid propulsion systems alternately.

First stage (PS1)[edit]

PSLV-C44first stage inside Mobile Service Tower.

The first stage, one of the largestsolid rocket boostersin the world, carries 138 t (136 long tons; 152 short tons) ofhydroxyl-terminated polybutadiene-bound (HTPB) propellant and develops a maximum thrust of about 4,800 kN (1,100,000 lbf). The 2.8 m (9 ft 2 in) diameter motor case is made ofmaraging steeland has an empty mass of 30,200 kg (66,600 lb).[9]

Pitchandyawcontrol during first stage flight is provided by the Secondary Injection Thrust Vector Control (SITVC) System, which injects anaqueous solutionofstrontium perchlorateinto theS139exhaust divergent from a ring of 24 injection ports to produce asymmetric thrust. The solution is stored in two cylindricalaluminiumtanks strapped to the core solid rocket motor and pressurised withnitrogen.Underneath these two SITVC tanks,RollControl Thruster (RCT) modules with small bi-propellant (MMH/MON) liquid engine are also attached.[28]

On the PSLV-G and PSLV-XL, first stage thrust is augmented by sixstrap-on solid boosters.Four boosters are ground-lit and the remaining two ignite 25 seconds after launch. The solid boosters carry 9 t (8.9 long tons; 9.9 short tons) or 12 t (12 long tons; 13 short tons) (for PSLV-XL configuration) propellant and produce 510 kN (110,000 lbf) and 719 kN (162,000 lbf) thrust respectively. Two strap-on boosters are equipped with SITVC for additional attitude control.[9]The PSLV-CA uses no strap-on boosters.

First stage separation is aided by four pairs of retro-rockets installed on inter-stage (1/2L). During staging, these eight rockets help push away the spent stage away from second stage.[40]

Second stage (PS2)[edit]

PSLV-C50 second stage withVikas engine

The second stage is powered by a singleVikas engineand carries 41.5 t (40.8 long tons; 45.7 short tons) ofEarthstore-able liquid propellant –unsymmetrical dimethylhydrazine(UDMH) as fuel andnitrogen tetroxide(N2O4) as oxidiser in two tanks separated by a common bulkhead.[28]It generates a maximum thrust of 800 kN (180,000 lbf). The engine isgimbaled(±4°) in two planes to provide pitch and yaw control by two actuators, while roll control is provided by a Hot gas Reaction Control Motor (HRCM) that ejects hot gases diverted from gas generator of Vikas engine.[41]

On inter-stage (1/2U) of PS2 there are two pairs of ullage rockets to maintain positive acceleration during PS1/PS2 staging and also two pairs of retro-rockets to help push away spent stage during PS2/PS3 staging.[40]

Second stage also carries some quantity of water in atoroidaltank at its bottom.[42]Water spray is used to cool hot gases from Vikas' gas generator to about 600 °C before entering turbopump. Propellant and water tanks of second stage are pressurized byHelium.[43][44][45]

Third stage (PS3)[edit]

Third and fourth stages ofPSLV-C45

The third stage uses 7.6 t (7.5 long tons; 8.4 short tons) of HTPB solid propellant and produces a maximum thrust of 250 kN (56,000 lbf). Its burn duration is 113.5 seconds. It has aKevlar-polyamidefibre case and a submerged nozzle equipped with a flex-bearing-seal gimbaled nozzle with ±2°thrust vectorfor pitch and yaw control. Roll control is provided by the fourth stagereaction control system(RCS) during thrust phase as well as during combined-coasting phase under which burnt-out PS3 remains attached to PS4.[9][10]

Fourth stage (PS4)[edit]

The fourth stage is powered by regeneratively cooled twin engines,[46]burningmonomethylhydrazine(MMH) andmixed oxides of nitrogen(MON). Each pressure fed engine generates 7.4 kN (1,700 lbf) thrust and is gimbaled (±3°) to provide pitch, yaw and roll control during powered flight. Coast phase attitude control is provided by six 50N RCS thrusters.[47]The stage is pressurized byHelium[48]and carries 1,600 kg (3,500 lb) to 2,500 kg (5,500 lb) of propellant depending on the mission requirements. PS4 has three variants L1.6, L2.0 and L2.5 based on propellant tank capacity.[49][50]

On PSLV-C29/TeLEOS-1 mission, the fourth stage demonstrated re-ignition capability for the first time which was used in many subsequent flights to deploy payloads in multiple orbits on a single campaign.[51]

As aspace debrismitigation measure, PSLV fourth stage getspassivatedby venting pressurant and propellant vapour after achieving main mission objectives. Such passivation prevents any unintentional fragmentation or explosion due to stored internal energy.[52][53][54]

Theniobium alloynozzle used on twin engines of fourth stage is expected to be replaced by lighter,silicon carbidecoatedcarbon–carbonnozzle divergent. The new nozzle was hot tested at facilities ofIPRC, Mahendragiriin March and April 2024. This substitution should increase payload capacity of PSLV by 15 kilograms (33 lb).[55]

ISRO successfully completed 665-second hot test of3D printedPS4 engine, produced by Wipro 3D throughselective laser melting.A total of 19 weld joints were eliminated through this process while engine's 14 components were reduced to one piece. It saved 60% of the production time and drastically decreased the amount of raw materials used per engine, from 565 kg to 13.7 kg of metal powder.[56]

PS4 stage as orbital platform[edit]

PS4 has carried hosted payloads like AAM on PSLV-C8,[42]Rubin 9.1/Rubin 9.2on PSLV-C14[57]and mRESINS on PSLV-C21.[58]But now, PS4 is being augmented to serve as a long duration orbital platform after completion of primary mission. PS4 Orbital Platform (PS4-OP) will have its own power supply, telemetry package, data storage and attitude control for hosted payloads.[59][60][61]

OnPSLV-C37andPSLV-C38campaigns,[62]as a demonstration PS4 was kept operational and monitored for over ten orbits after delivering spacecraft.[63][64][65]

PSLV-C44was the first campaign where PS4 functioned as independent orbital platform for short duration as there was no on-board power generation capacity.[66]It carried KalamSAT-V2 as a fixed payload, a 1U cubesat by Space Kidz India based onInterorbital Systemskit.[67][68]

OnPSLV-C45campaign, the fourth stage had its own power generation capability as it was augmented with an array of fixedsolar cellsaround PS4 propellant tank.[69]The three payloads hosted on PS4-OP were the Advanced Retarding Potential Analyzer for Ionospheric Studies (ARIS 101F) byIIST,[70]an experimentalAISpayload by ISRO, and AISAT bySatellize.[71]To function as orbital platform, fourth stage was put inspin-stabilizedmode using its RCS thrusters.[72]

On thePSLV-C53campaign, the PS4-OP is referred to as thePSLV Orbital Experimental Module (POEM),and it hosted six payloads. POEM was the first PSLV fourth stage based orbital platform to be actively stabilised using Helium based cold gas thrusters after the primary mission and stage passivization.[73][74][75][76]

PS4 on RLV-OREX[edit]

TheReusable Launch Vehicle Technology Demonstration programis an prototypespaceplaneproject currently being processed by ISRO.It is planned to use a GSLV, modified by replacing it's Cryogenic Upper Stage(CUS) with the PS-4 as the RLV would not required the excess thrust created by the CUS.[77][78]

Payload fairing[edit]

PSLV heat shield atHAL Aerospace Museum,Bengaluru.

Payload fairing of PSLV, also referred as its "Heatshield" consists of a conical upper section with spherical nose-cap, a cylindrical middle section and a lower boat-tail section. Weighing 1,182 kilograms (2,606 lb), it has 3.2 meter diameter and 8.3 meter height.[79]It hasIsogridconstruction and is made out of7075 aluminum alloywith a 3 mm thick steel nose-cap.[80][81]The two halves of fairing are separated using apyrotechnicdevice based jettisoning system consisting horizontal and lateral separation mechanisms.[82]To protect spacecraft from damage due to excessive acoustic loads during launch, the heatshield interior is lined with acoustic blankets.[28]

Stage 1 Stage 2 Stage 3 Stage 4
Pitch SITVC Engine Gimbal Nozzle Flex Engine Gimbal
Yaw SITVC Engine Gimbal Nozzle Flex Engine Gimbal
Roll RCT and SITVC in 2 PSOMs HRCM Hot Gas Reaction Control Motor PS4 RCS PS4 RCS

Variants[edit]

ISRO has envisaged a number of variants of PSLV to cater to different mission requirements. There are currently two operational versions of the PSLV — the core-alone (PSLV-CA) without strap-on motors, and the (PSLV-XL) version, with six extended length (XL) strap-on motors carrying 12 tonnes of HTPB based propellant each.[83]These configurations provide wide variations in payload capabilities up to 3,800 kg (8,400 lb) in LEO and 1,800 kg (4,000 lb) in sun-synchronous orbit.

PSLV-G[edit]

The standard or "Generic" version of the PSLV,PSLV-Ghad four stages using solid and liquid propulsion systems alternately and six strap-on motors (PSOM or S9) with 9 tonne propellant loading. It had capability to launch 1,678 kg (3,699 lb) to 622 km (386 mi) into sun-synchronous orbit.PSLV-C35was the last operational launch of PSLV-G before its discontinuation.[84][85][86]

PSLV-CA[edit]

ThePSLV-CA,CA meaning "Core Alone", model premiered on 23 April 2007. The CA model does not include the six strap-on boosters used by the PSLV standard variant but two SITVC tanks with Roll Control Thruster modules are still attached to the side of the first stage with addition of two cylindrical aerodynamic stabilizers.[49][86]The fourth stage of the CA variant has 400 kg (880 lb) less propellant when compared to its standard version.[49]It currently has capability to launch 1,100 kg (2,400 lb) to 622 km (386 mi)Sun-synchronous orbit.[87]

PSLV-XL[edit]

PSLV-XLis the upgraded version of Polar Satellite Launch Vehicle in its standard configuration boosted by more powerful, stretched strap-on boosters with 12 tonne propellant load.[49]Weighing 320 t (310 long tons; 350 short tons) at lift-off, the vehicle uses larger strap-on motors (PSOM-XL or S12) to achieve higher payload capability.[88]On 29 December 2005, ISRO successfully tested the improved version of strap-on booster for the PSLV.[89]The first use of PSLV-XL was the launch ofChandrayaan-1by PSLV-C11. The payload capability for this variant is 1,800 kg (4,000 lb) to Sun-synchronous orbit.[87]

PSLV-DL[edit]

PSLV-DLvariant has only two strap-on boosters with 12 tonne propellant load on them.PSLV-C44on 24 January 2019 was the first flight to use PSLV-DL variant of Polar Satellite Launch Vehicle.[90][91]It is capable of launching 1,257 kg (2,771 lb) to 600 km (370 mi) Sun-synchronous orbit.[5]

PSLV-QL[edit]

PSLV-C45lift off

PSLV-QLvariant has four ground-lit strap-on boosters, each with 12 tonnes of propellant.PSLV-C45on 1 April 2019 was the first flight of PSLV-QL.[92]It has the capacity to launch 1,523 kg (3,358 lb) to 600 km (370 mi) Sun-synchronous orbit.[5]

PSLV-3S (concept)[edit]

PSLV-3S was conceived as a three-staged version of PSLV with its six strap-on boosters and second liquid stage removed. The total lift-off mass of PSLV-3S was expected to be 175 tonnes with capacity to place 500 kg in 550 kmlow Earth orbit.[87][93][94][95][96]

Launch profile[edit]

PSLV - XL:

  • The PS1 ignites at T+0 providing 4846kN of thrust.
  • Within T+1, 4 out of the 6 boosters ignite on ground, each producing 703 kN of thrust. 7658kN of total thrust is produced by the combined propulsion of the PSOMs and the PS1.
  • At around T+23/26, the remaining 2 unlit boosters are air-lit bringing the rocket at its maximum thrust capacity.
  • At T+1:10, the first 4 ground-lit PSOMs have depleted its propellant and now separates and falls down to the ocean. The remaining 2 PSOMs and the PS1 continue to burn.
  • At T+1:35, the remaining 2 PSOMs complete its 70 seconds burn and separate, leaving the rocket in a Core- Alone configuration.
  • At T+1:50, the PS1 has completed its 110-second burn and it separates and theVikas Engineinside the PS2 ignites.
  • The second stage burns for around 130 seconds and around T+4 minutes, the second stages shuts off and separates.
  • The third stage, which is a solid rocket booster, and burns 80 seconds and then coasts for the remainder of time and around T+8/10 minutes, it separates and the 4th stage ignites to give the rocket a final push into the orbit.
  • This 4th stage burn is highly variable and depends on the mass and number of payloads and usually is around 500 seconds long. The 4th stage may shut off around T+16/18 minutes followed by thePayload Deployment.

[97][98][99]

Launch statistics[edit]

As of 1 January 2024the PSLV has made 60 launches, with 57 successfully reaching their planned orbits, two outright failures and one partial failure, yielding a success rate of95% (or97% including the partial failure).[100]All launches have occurred from the Satish Dhawan Space Centre, known before 2002 as the Sriharikota Range (SHAR).

Launch system status
Retired
Variant Launches Successes Failures Partial failures
PSLV-G (Standard) 12 10 1 1
PSLV-CA (Core Alone) 17 17 0 0
PSLV-XL (Extended)[2] 25 24 1 0
PSLV-DL[2] 4 4 0 0
PSLV-QL[2] 2 2 0 0
Total as of January 2024[101] 60 57 2 1
Decade-wise summary of PSLV launches
Decade Successful Partial success Failure Total
1990s 3 1 1 5
2000s 11 0 0 11
2010s 33 0 1 34
2020s 10 0 0 10
Total 57 1 2 60

See also[edit]

References[edit]

  1. ^"SURPLUS MISSILE MOTORS: Sale Price Drives Potential Effects on DOD and Commercial Launch Providers".gao.gov.U.S. Government Accountability Office. 16 August 2017.Archivedfrom the original on 13 April 2018.Retrieved2 May2018.Public DomainThis article incorporates text from this source, which is in thepublic domain.
  2. ^abcdefghi"Polar Satellite Launch Vehicle".Archivedfrom the original on 22 December 2016.Retrieved21 December2014.
  3. ^abc"Access to Space"(PDF).2011. Archived fromthe original(PDF)on 22 November 2010.Retrieved8 March2017.
  4. ^"Galileo Galilei (GG) Launcher Identification And Compatibility Analysis Report"(PDF).8 June 2009. p. 27. Archived fromthe original(PDF)on 10 April 2015.Retrieved27 February2022.
  5. ^abcd"The Polar Satellite Launch Vehicle (PSLV)".Archived fromthe originalon 26 January 2022.Retrieved27 January2022.
  6. ^"PSLV".Space Launch Report.Archived from the original on 28 July 2020.Retrieved17 December2020.{{cite web}}:CS1 maint: unfit URL (link)
  7. ^abcdefghi"PSLV-C37 Brochure".ISRO. Archived fromthe originalon 8 April 2017.Retrieved5 June2017.
  8. ^abcd"PSLV_C41_Brochure"(PDF).Archived fromthe original(PDF)on 9 April 2018.Retrieved9 April2018.
  9. ^abcde"PSLV Launch Vehicle Information".Spaceflight 101. Archived fromthe originalon 24 September 2015.Retrieved20 February2015.
  10. ^ab"PSLV-C25: the vehicle that launched the Indian Mars Orbiter"(PDF).Current Science.25 September 2015. Archived fromthe original(PDF)on 24 December 2015.
  11. ^"Welcome To ISRO:: Launch Vehicles".Archived fromthe originalon 29 October 2014.Retrieved8 April2014.
  12. ^Foust, Jeff (23 June 2017)."Rideshare demand grows despite development of small launch vehicles".Space News.Retrieved23 June2017.
  13. ^Tejonmayam, U (11 December 2019)."PSLV-C48 successfully launches RISAT-2BRI, 9 foreign satellites".The Times of India.Retrieved11 December2019.
  14. ^Barry, Ellen (15 February 2017)."India Launches 104 Satellites From a Single Rocket, Ramping Up Space Race".The New York Times.ISSN0362-4331.Archivedfrom the original on 5 April 2017.Retrieved15 February2017.
  15. ^"ISRO's record satellites' launch: 10 top facts".The Times of India.Archivedfrom the original on 16 February 2017.Retrieved15 February2017.
  16. ^Wattles, Jackie (24 January 2021)."SpaceX launches 143 satellites on one rocket in record-setting mission".CNN.Archivedfrom the original on 24 January 2021.Retrieved24 January2021.
  17. ^"PSLV C35 / Scatsat-1 with Dual Launch Adapter".Archivedfrom the original on 22 December 2017.Retrieved19 December2017.
  18. ^Cong, Indian Science (5 January 2016)."Here's the #103ISC Official Newsletter 2nd edition brought by Journalism students and researchers. 2/2 @PIB_Indiapic.twitter /mLq9CZnY5T".@103ISC.Archivedfrom the original on 11 January 2022.Retrieved19 December2017.
  19. ^Aisha Nazeer (November 2018)."Research on PSLV-C37 Launcher by ISRO"(PDF).International Journal of Science and Research (IJSR).7(11).Retrieved13 May2023.
  20. ^Ready to Fire: How India and I survived the ISRO Spy case.Bloomsbury Publishing. 2018. p. 203.
  21. ^From Fishing Hamlet to Red Planet.ISRO. p. 173.
  22. ^"Indian ambitions in space go sky-high".New Scientist. 22 January 1981. p. 215.Archivedfrom the original on 10 October 2022.Retrieved30 December2018.
  23. ^abRao, P.V. Monoranjan; Radhakrishnan, Paramaswaran (2012).A brief history of rocketry in ISRO.Orient Blackswan. p. 215.ISBN978-8173717642.
  24. ^abRao, P.V. Manoranjan, ed. (2015). "2.6 PSLV: The workhorse of ISRO by N. Narayanamoorthy".From fishing hamlet to red planet.Harpercollins.ISBN978-9351776895.
  25. ^Raj, Gopal (2000). "8. PSLV: Achieving Operational Launch Capability".Reach For the Stars: The Evolution of India's Rocket Programme.Viking.ISBN978-0670899500.About a year later, an important change was made, with the solid fourth stage being substituted by a liquid stage. This change was considered necessary since the accuracy with which the IRS satellites had to be put into orbit — within 15 km in terms of orbital height and within 0.1° of the desired orbital inclination — could not be achieved with a solid stage.
  26. ^Ready To Fire: How India and I Survived the ISRO Spy Case.Bloomsbury Publishing. 2018. pp. 207–208.
  27. ^"PSLV - ISRO".isro.gov.in.Archivedfrom the original on 9 February 2020.Retrieved9 March2022.
  28. ^abcd"Current Science (Volume 65 - Issue 07) PSLV-D1"(PDF).10 October 1993.Archived(PDF)from the original on 6 August 2020.Retrieved20 December2019.
  29. ^"India (Launchers)".Spacecraft Encyclopedia.Archivedfrom the original on 20 May 2016.Retrieved12 November2014.
  30. ^"PSLV (1)".Gunter's Space Page.Archivedfrom the original on 5 December 2020.Retrieved12 November2014.
  31. ^"PSLV".Gunter's Space Page.Archivedfrom the original on 24 July 2011.Retrieved12 November2014.
  32. ^"ISRO - Mars Orbiter Mission".Archivedfrom the original on 27 October 2014.Retrieved8 April2014.
  33. ^"Government approves Rs 10,000-crore continuation programmes for PSLV, GSLV".The Economic Times. 7 June 2018.Archivedfrom the original on 8 June 2018.Retrieved8 June2018.
  34. ^"Press Release - NSIL signs Contract with HAL (lead member of HAL-L&T consortium) for production of 05 nos of PSLV-XL"(PDF).Archived fromthe original(PDF)on 9 September 2022.
  35. ^D.s, Madhumathi (16 August 2019)."ISRO's business arm begins search for PSLV makers".The Hindu.ISSN0971-751X.Archivedfrom the original on 9 September 2022.Retrieved9 September2022.
  36. ^Chethan Kumar (27 August 2021)."Adani, L&T among those in race for PSLV contract | India News - Times of India".The Times of India.Archivedfrom the original on 9 September 2022.Retrieved9 September2022.
  37. ^"HAL-L&T to build five PSLV rockets, bags Rs 860 crore deal from NSIL for the project".The Economic Times.Archivedfrom the original on 9 September 2022.Retrieved9 September2022.
  38. ^"ISRO looks at JV for PSLV manufacture; launch to be privatized by 2020".Geospatial World. 26 October 2017.Archivedfrom the original on 16 November 2017.Retrieved26 October2017.
  39. ^Chethan Kumar (9 April 2022)."Hal-l&t Wins Over 824-cr Contract For Making 5 Pslvs | India News - Times of India".The Times of India.Archivedfrom the original on 9 September 2022.Retrieved9 September2022.
  40. ^ab"PSLV-C1".isro.gov.in.Archivedfrom the original on 6 August 2020.Retrieved22 February2020.
  41. ^"Space India 1/1990".isro.gov.in.Archivedfrom the original on 6 August 2020.Retrieved22 February2020.
  42. ^ab"PSLV C8 / AGILE brochure"(PDF).Archived fromthe original(PDF)on 23 February 2020.Retrieved23 February2020.
  43. ^Thomas, George; Pant, Bhanu; Ganesan, R.; Singh, S. K.; Sinha, P. P. (1999)."Development & qualification of Titanium Alloy High-Pressure Gas Bottles for PSLV second Stage".Cooperation in Space.430:559.Bibcode:1999ESASP.430..559T.Archivedfrom the original on 11 November 2020.Retrieved7 April2021.
  44. ^Sivathanu Pillai, A. (2004).Envisioning An Empowered nation.Tata McGraw-Hill Publishing Company. p. 40.ISBN978-0070531543.
  45. ^"Space India Jan-Mar 1990"(PDF).April 1990.Archived(PDF)from the original on 7 April 2021.Retrieved8 April2021.
  46. ^"ASACO sub-systems for space".Archivedfrom the original on 11 December 2017.Retrieved16 October2018.
  47. ^Ramakrishnan, S.; Somanath, S.; Balakrishnan, S. S. (1 January 2002). "Multi-Orbit Mission by PSLV-C3 and Future Launch Opportunities".Iaf Abstracts:936.Bibcode:2002iaf..confE.936R.
  48. ^"Latest Volume14-Issue21 News, Photos, Latest News Headlines about Volume14-Issue21".Frontline.Archivedfrom the original on 7 May 2021.Retrieved7 April2021.
  49. ^abcd"PSLV Datasheet".Archived from the original on 28 July 2020.Retrieved27 September2009.{{cite web}}:CS1 maint: unfit URL (link)
  50. ^"Signatures, Newsletter of the Indian Society of Remote Sensing – Ahmedabad Chapter. Volume: 24, No.2, April- June 2012"(PDF).Archived fromthe original(PDF)on 21 December 2021.Retrieved31 July2023.The fourth stage has three variants designated as L1.6, L2.0 and L2.5 based on the propellant loading capacity of 1.6t, 2t and 2.5t respectively required for a particular mission.
  51. ^"ISRO Successfully Tests Multiple Burn Fuel Engine During Launch of Six Singaporean Satellites".Archived fromthe originalon 3 May 2016.Retrieved16 December2015.
  52. ^Adimurthy, V.; Ganeshan, A.S. (February 2006)."Space debris mitigation measures in India".Acta Astronautica.58(3): 168–174.Bibcode:2006AcAau..58..168A.doi:10.1016/j.actaastro.2005.09.002.Archivedfrom the original on 12 April 2022.Retrieved26 December2021.
  53. ^Bonnal, C (1 June 2007)."Design and operational practices for the passivation of spacecraft and launchers at the end of life".Proceedings of the Institution of Mechanical Engineers, Part G: Journal of Aerospace Engineering.221(6): 925–931.doi:10.1243/09544100JAERO231.ISSN0954-4100.S2CID110656798.
  54. ^"Indian Presentation to the 47th Session of Scientific and Technical Subcommittee of United Nations Committee on the Peaceful Uses of Outer Space Agenda 8 'Space Debris Activities in India'"(PDF).Archived(PDF)from the original on 9 October 2022.
  55. ^"ISRO Develops Lightweight Carbon-Carbon Nozzle for Rocket Engines, Enhancing Payload Capacity".isro.gov.in.Archived fromthe originalon 19 April 2024.Retrieved21 April2024.
  56. ^"With 3D-printed rocket engine, Isro adds another feather to cap".The Times of India.11 May 2024.ISSN0971-8257.Retrieved13 May2024.
  57. ^"PSLV C14/Oceansat-2 brochure"(PDF).Archived fromthe original(PDF)on 6 August 2020.Retrieved23 February2020.
  58. ^"Space-India July 2012 to August 2013"(PDF).Archived fromthe original(PDF)on 6 August 2020.Retrieved23 February2020.
  59. ^"Opportunities for science experiments in the fourth stage of India's PSLV"(PDF).21 February 2019.Archived(PDF)from the original on 9 October 2022.
  60. ^"Announcement of Opportunity (AO) for Orbital platform: an avenue for in-orbit scientific experiments"(PDF).15 June 2019. Archived fromthe original(PDF)on 6 August 2020.Retrieved23 February2020.
  61. ^Kumar, Chethan (15 June 2019)."2 days after Space Station news, Isro calls for" docking experiments "on PSLV stage-4".The Times of India.Archivedfrom the original on 24 August 2019.Retrieved23 February2020.
  62. ^"In-situ observations of rocket burn induced modulations of the top side ionosphere using the IDEA payload on-board the unique orbiting experimental platform (PS4) of the Indian Polar Orbiting Satellite Launch Vehicle mission - ISRO".isro.gov.in.Archivedfrom the original on 21 September 2022.Retrieved27 June2022.
  63. ^"Department of Space Annual Report 2017-18"(PDF).Archived(PDF)from the original on 13 February 2018.
  64. ^Singh, Surendra (16 December 2018)."In a first, ISRO will make dead rocket stage" alive "in space for experiments".The Times of India.Archivedfrom the original on 8 November 2020.Retrieved23 February2020.
  65. ^rajasekhar, pathri (20 June 2017)."Isro to lower rocket's altitude".Deccan Chronicle.Archivedfrom the original on 6 August 2020.Retrieved23 February2020.
  66. ^Rajwi, Tiki (12 January 2019)."PSLV lift-off with added features".The Hindu.ISSN0971-751X.Archivedfrom the original on 6 August 2020.Retrieved23 February2020.
  67. ^"PSLV-C44 - ISRO".isro.gov.in.Archived fromthe originalon 17 January 2019.Retrieved26 June2020.
  68. ^Interorbital Systems [@interorbital] (25 January 2019)."Congratulations to ISRO and SpaceKidzIndia on getting their CubeSat into orbit! The students modified their IOS CubeSat kit, complete w/ their own experiments!"(Tweet) – viaTwitter.
  69. ^Clark, Stephen."Indian military satellite, 20 more Planet imaging CubeSats launched by PSLV".Spaceflight Now.Archivedfrom the original on 6 April 2019.Retrieved23 February2020.
  70. ^"Department of Avionics, R. Sudharshan Kaarthik, Ph.D (Assistant Professor)".Archivedfrom the original on 13 February 2020.Retrieved23 February2020.
  71. ^"Exseed Sat-2".Satellize.Archivedfrom the original on 23 February 2020.Retrieved23 February2020.
  72. ^"Opportunity for Scientific Experiments on PSLV Upper Stage Orbital Platform"(PDF).16 June 2021.Archived(PDF)from the original on 9 October 2022.
  73. ^Kumar, Chethan (25 June 2012)."Bengaluru's Digantara, Hyderabad startup Dhruva become first to get IN-SPACe authorisation".The Times of India.Archivedfrom the original on 25 June 2022.Retrieved26 June2022.
  74. ^"PSLV-C53/DS-EO mission"(PDF).Archived fromthe original(PDF)on 5 July 2022.
  75. ^"పీఎస్ఎల్వీ-సి53లో నూతన సాంకేతికత".EENADU(in Telugu).Archivedfrom the original on 6 July 2022.Retrieved6 July2022.
  76. ^News9 Staff (8 September 2022)."Har Ghar Tiranga happened in Antriksh. ISRO did hoist the Indian flag in Space!".NEWS9LIVE.Archivedfrom the original on 9 September 2022.Retrieved9 September2022.{{cite web}}:CS1 maint: numeric names: authors list (link)
  77. ^"RLV re-entry mission to use GSLV with PSLV last stage; landing gear to change & more".The Times of India.ISSN0971-8257.Retrieved26 June2024.
  78. ^"MSN".msn.Retrieved26 June2024.
  79. ^Singh, Satyendra (11 December 2019)."IRNSS-1H/PSLV-C39 Orbit Evolution and Re-entry Analysis"(PDF).Archived(PDF)from the original on 9 October 2022.Retrieved19 December2019.
  80. ^Ramamurti, V; Rajarajan, S; Rao, G Venkateswara (October 2001)."Dynamic studies of a typical payload fairing for different boat tail configurations"(PDF).Archived(PDF)from the original on 6 August 2020.
  81. ^Indigenous Development of Materials for Space Programme.21 August 2015. Event occurs at 20 minutes 40 seconds.Archivedfrom the original on 3 December 2020.Retrieved8 January2020.
  82. ^Chakraborty, D; Vasantha, S."Aerodynamic simulation of heatshield separation on ground"(PDF).Archived(PDF)from the original on 9 October 2022.
  83. ^Subramanian, T.S. (15 July 2011)."The PSLV is a proud symbol of ISRO's self-reliance".The Hindu.Chennai, India.Archivedfrom the original on 26 October 2012.Retrieved16 July2011.
  84. ^"Where India reaches for the stars: Inside ISRO's Sriharikota Centre".Hindustan Times. 22 June 2016.Archivedfrom the original on 15 September 2018.Retrieved15 September2018.Today, the PSLV is available in three configurations — the generic vehicle with six strap-ons, which is the earlier edition of PSLV (which will be discontinued soon)
  85. ^"Outcome Budget 2016–2017"(PDF).Government of India, Department of Space. 2016. Archived fromthe original(PDF)on 25 June 2017.Retrieved15 September2018.Currently, two versions of PSLV are operational, namely PSLV-XL (with six extended version of Strap-on motors) and the PSLV Core-alone (without Strap-on motors).
  86. ^ab"2.6 PSLV: The workhorse of ISRO by N. Narayanamoorthy".From Fishing Hamlet to Red Planet: India's Space Journey.Harpercollins. 2015.ISBN978-9351776895.
  87. ^abc"India's PSLV"(PDF).earth2orbit.15 March 2009. Archived fromthe original(PDF)on 10 July 2011.
  88. ^PSLV-C11 Successfully Launches Chandrayaan-1Archived25 October 2008 at theWayback Machine
  89. ^"New Solid Propellant Motor to Increase PSLV Capability".ISRO.Archivedfrom the original on 17 February 2009.Retrieved27 April2007.
  90. ^Rajwi, Tiki."SLV-C44 to lift-off with added features".Archivedfrom the original on 11 January 2019.Retrieved11 January2019.
  91. ^Rajwi, Tiki (12 January 2019)."PSLV lift-off with added features".The Hindu.ISSN0971-751X.Archivedfrom the original on 6 August 2020.Retrieved12 January2019.
  92. ^"Launch Kit C45".ISRO.Archivedfrom the original on 24 March 2019.Retrieved23 March2019.
  93. ^"Evolution of Indian launch vehicle technologies"(PDF).ias.ac.in.Indian Academy of Sciences. 25 December 2007. Archived fromthe original(PDF)on 24 May 2011.
  94. ^"Future of Space Transportation: S. Somanath"(PDF).9 February 2016. Archived fromthe original(PDF)on 24 October 2018.
  95. ^Murthi, K.R. Sridhara (9 May 2009)."Space Debris Mitigation – Coordination and Implementation efforts in India"(PDF).Archived(PDF)from the original on 10 October 2022.Retrieved22 November2017.
  96. ^"ISRO's baby rocket to carry small satellites, likely to take off in 2019".The New Indian Express.Archivedfrom the original on 3 January 2018.Retrieved2 January2018.
  97. ^"Flight Profile – PSLV C40 | Spaceflight101".Archivedfrom the original on 13 February 2022.Retrieved15 February2022.
  98. ^"Flight Profile – PSLV C38 | Spaceflight101".23 June 2017.Archivedfrom the original on 15 February 2022.Retrieved15 February2022.
  99. ^"PSLV-C24 Brochure"(PDF).Isro.Archived fromthe original(PDF)on 20 March 2022.Retrieved15 February2022.
  100. ^"PSLV- The Travel Beyond the Blue! #ISRO #VikatanInfographic".vikatan(in Tamil).Retrieved20 February2017.
  101. ^"Polar Satellite Launch Vehicle".Archivedfrom the original on 22 December 2016.Retrieved29 November2018.

External links[edit]