Jump to content

STS-118

From Wikipedia, the free encyclopedia

STS-118
Endeavourrendezvous with the ISS
NamesSpace Transportation System-118
Mission typeISS assembly
OperatorNASA
COSPAR ID2007-035AEdit this at Wikidata
SATCATno.32008
Mission duration12days, 17hours, 55minutes, 34seconds
Distance travelled8,489,253 kilometres (5,274,977 mi)[1]
Orbits completed201
Spacecraft properties
SpacecraftSpace ShuttleEndeavour
Launch mass121,823 kilograms (268,574 lb)
Landing mass100,878 kilograms (222,398 lb)[2]
Crew
Crew size7
Members
Start of mission
Launch dateAugust 8, 2007, 22:36:42(2007-08-08UTC22:36:42Z)UTC
Launch siteKennedyLC-39A
End of mission
Landing dateAugust 21, 2007, 16:33:20(2007-08-21UTC16:33:21Z)UTC
Landing siteKennedySLF Runway 15
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Perigee altitude226 kilometers (140 mi)[3]
Apogee altitude226 kilometers (140 mi)[3]
Inclination51.6 degrees
Period91.6 minutes
Docking withISS
Docking portPMA-2
(Destiny forward)
Docking dateAugust 10, 2007, 18:02UTC
Undocking dateAugust 19, 2007, 11:56UTC
Time docked8days, 17hours, 54minutes

(left to right)Mastracchio,Morgan,Hobaugh,Kelly,Caldwell,WilliamsandDrew.

STS-118was aSpace Shuttlemission to theInternational Space Station(ISS) flown by the orbiterEndeavour.STS-118 lifted off on August 8, 2007, fromlaunch pad 39AatKennedy Space Center(KSC), Florida and landed at theShuttle Landing Facilityat KSC on August 21, 2007.

This was the first flight ofEndeavoursinceSTS-113in November 2002, which was also the last successful shuttle flight beforeSTS-107which culminated in the loss ofColumbiawhen itdisintegrated during reentry.STS-118 pilot Charles Hobaugh had been the entry teamCAPCOMfor STS-107.Columbiahad originally been selected for this flight, for what would have been its 29th mission, and its first and likely only visit to the ISS, mainly due toits heavier weight.[4]

The mission is also referred to asISS-13A.1by the ISS program. The mission added two more components to the ISS and brought supplies for its crew.

During and after the mission, the media focused heavily on a small puncture in theheat shield,created by a piece of insulation foam that came off theexternal tankduring liftoff, though the foam impact that ultimately destroyedColumbiacaused more damage and was in a critical area. KSC Launch DirectorMichael D. Leinbachmentioned in the post-flight news conference that upon initial inspection on the ground, "Endeavourappears to be the 'cleanest' post-flight orbiter sinceReturn to Flight".[5]On August 31, 2007, NASA reported that the damaged tiles had been removed in theOrbiter Processing Facility,and engineers had found no evidence of heat-related damage to the orbiter itself.[6]

Crew[edit]

Position Astronaut
Commander United StatesScott Kelly
Second spaceflight
Pilot United StatesCharles O. Hobaugh
Second spaceflight
Mission Specialist 1 United StatesTracy Caldwell
First spaceflight
Mission Specialist 2 United StatesRichard Mastracchio
Second spaceflight
Mission Specialist 3 CanadaDafydd Williams,CSA
Second and last spaceflight
Mission Specialist 4 United StatesBarbara Morgan
Only spaceflight
Mission Specialist 5 United StatesAlvin Drew
First spaceflight

Crew notes[edit]

AstronautClayton Andersonwas originally slated to be launched to the ISS on this mission, but was moved toSTS-117.His replacement wasAlvin Drew.[7]

NASA press releases and media briefing documents stated that STS-118 was the first flight of aMission Specialist Educatordue to the presence ofBarbara Morgan.The Educator Astronaut Project is the successor toNASA'sTeacher in Space Project,which ended with theSpace ShuttleChallengerdisasterin 1986.[8]The official STS-118 mission patch included a flame of knowledge that represented the importance of education, and honored teachers and students everywhere. Morgan was the backup toChrista McAuliffe,the teacher who was killed aboardChallengerin 1986. The tip of the flames touched Morgan's name on the patch.[9]However,NASA AdministratorMichael D. Griffinclarified at a post-mission press conference that Morgan was not considered a mission specialist educator, but rather a standard mission specialist, who had once been a teacher.[10]

Prior to theColumbiadisaster, the crew manifest for STS-118 was:

Position Astronaut
Commander Scott J. Kelly
Second spaceflight
Pilot Charles O. Hobaugh
Second spaceflight
Mission Specialist 1 Scott E. Parazynski
Fifth spaceflight
Mission Specialist 2 Lisa Nowak
First spaceflight
Mission Specialist 3 Dafydd Williams,CSA
Second spaceflight
Mission Specialist 4 Barbara Morgan
First spaceflight
Parazynski was assigned toSTS-120and Nowak was assigned toSTS-121.

Mission payloads[edit]

ESP-3 launch configuration
From top to bottom: Orbiter docking system, Spacehab, S5 truss, ESP-3. The CMG is the globe bottom left.

The STS-118 mission delivered and assembled thestarboardS5 trusssegment of the International Space Station, as well asExternal Stowage Platform 3,(ESP-3) and a replacementControl Moment Gyroscope(CMG). The mission was also the final flight to include theSpacehabLogistics Single Module.

The Spacehab Logistics Single Module, a pressurized aluminum habitat that is carried inside the payload bay, has a capacity of 6,000 pounds (2,700 kg), and carried a variety of cargo and research projects, including supply materials for the ISS. It returned cargo, including the MISSE PEC 3 & 4, aDepartment of Defensepayload that had been installed on the ISS. Launched in July 2006, theMISSE PEC-3 and 4contained over 850 materials specimens that will be studied to determine the effects of long-term exposure to the environment of space.

Location Cargo Mass
Bay 1–2 Orbiter Docking System
EMU3010 / EMU 3017
1,800 kilograms (4,000 lb)?
Bay 3 Tunnel Adapter 112 kilograms (247 lb)
Bay 5–7 Spacehab-SM 5,480 kilograms (12,080 lb)?
Bay 8P Shuttle Power
Distribution Unit (SPDU)
?0 kilograms (0 lb)
Bay 8–10 Truss Segment S5 1,584 kilograms (3,492 lb)
Bay 11–12 ESP-3 3,400 kilograms (7,500 lb)
Sill OBSS 450 kilograms (990 lb)?
Sill RMS201 390 kilograms (860 lb)
Total: 14,036 kilograms (30,944 lb)

Mission background[edit]

New components added to the International Space Station after flight STS-118/13A.1. (NASA)

The mission was originally scheduled to be flown byColumbia;STS-118 would have marked that orbiter's 29th flight and its first visit to the International Space Station. However, theSpace ShuttleColumbiadisasteraltered the planned flight schedules, and the mission was rescheduled forEndeavour.STS-118 served asEndeavour's return to flight after a planned orbiter re-fit and maintenance period that resulted in over 200 modifications to the orbiter.[11]

One of the most important modifications that debuted during STS-118 is an upgraded power-distribution module, theStation-Shuttle Power Transfer System(SSPTS). SSPTS allowsEndeavourto tap into the ISS power supply, converting up to eight kilowatts of electrical power from 120-volts direct-current (120VDC) ISS main voltage to the 28VDC system used by the orbiter. SSPTS was outfitted to the ISSPressurized Mating Adapter-2 (PMA2) duringSTS-116.These upgrades will allow orbiters to remain docked at the station for an additional three to four mission days[12][13][14]by saving cryogenic liquid hydrogen and oxygen needed to run the fuel cells which generate electricity aboard the orbiter; oxygen and hydrogen tank capacity is a major factor limiting the duration of orbiter free flights. Other systems debuting on this flight were a three-stringGPSsystem, which replaces the threeTactical Air Navigation-units, used to guide the shuttle and calculate its position during reentry and landing and the new Advanced Health Management System which keeps an eye on the three main engines (SSMEs) during liftoff and will shut them down before any catastrophic damage might develop. (All SSMEs had their own computers to regulate, monitor, and shut them down in case of trouble; the new system extends and improves the monitoring capability for increased safety.)Endeavouralso received several systems that the other orbiters had already been equipped with, such as aglass cockpit,improved wing leading-edge sensors and the OBSS.[11]

STS-118 included mission specialistBarbara Morgan,the first mission specialist educator. Morgan trained as the backup toChrista McAuliffe,NASA's Teacher in Space candidate from 1985 to 1986. McAuliffe was killed in the Space ShuttleChallengerdisasteron January 28, 1986. While McAuliffe and Morgan were classified as spaceflight participants and not as mission specialists in 1986, after the Teacher in Space Project was canceled, Morgan assumed the duties of Teacher in Space Designee and continued to work with NASA's Education Division until her selection as NASA's first mission specialist educator in 1998. Morgan completed two years of training and evaluation and began official duties in 2000.[15]An Educator Astronaut is a fully trained astronaut who performs all the same duties that a regular astronaut does.[16]Morgan became the first mission specialist educator in space on STS-118, and will share what she learned from the experience with students during and after her flight.

Whether you're teaching school, or whether you're training as an astronaut, you put all you can into it, and get the most out of it.

— Barbara Morgan[17]

The mission marked:

  • 150th crewed US space launch
  • 119th Space Shuttle flight
  • 22nd International Space Station assembly mission
  • 20th flight ofEndeavour
  • 94th Post-Challengermission
  • 6th Post-Columbiamission
  • First flight withSSPTS

Mission timeline[edit]

Launch preparations[edit]

Space ShuttleEndeavourarrives at launch pad 39A.

Endeavour(OV-105) was moved from the Orbiter Processing Facility, bay OPF-2 to theVehicle Assembly Buildingon July 2, 2007.[18]On July 10, 2007,Endeavourmoved from the Vehicle Assembly Building to Launch Pad 39A. Moving at less than one mile per hour (1.6 kilometres (0.99 mi)/h) atop thecrawler-transporter,the move began at 20:10 EDT, and was "hard down" (secured in place at the pad) at 03:02 EDT, July 11, 2007.

The crew completed theterminal countdown demonstration teston July 19, 2007, and the Flight Readiness Review meetings were held on July 25–26, 2007, after which NASA managers declared STS-118 a "GO" for launch.[19]The launch was delayed one day to repair a valve in the shuttle's crew cabin pressurization system.[20]

Commander Kelly and the crew arrived at Kennedy Space Center on August 3, 2007, for final launch preparations. The countdown clock began at 20:00 EDT August 5, 2007, for the launch at 18:36 EDT on August 8, 2007.

Wednesday August 8 (Flight day 1, Launch)[edit]

Launch of STS-118.

Fueling of the external tank began at 08:11 EDT (12:11 UTC) and finished around 11:00 EDT. The Ice Team began their inspection of the orbiter to ensure no ice was on the orbiter or the fuel tank, something unlikely due to the unusually warm conditions as launch time approached. Their inspection concluded about 40 minutes quicker than the usual two-hour duration. The crew departed for the Operations & Checkout (O&C) building, for the launch pad at 14:46 EDT (18:46 UTC), and arrived at the pad at 15:02 EDT (19:02 UTC). Launch occurred at 18:36:42 EDT (22:36:42 UTC).

Countdown and launch notes:

  • The Ice Team members discovered a small crack in the foam surrounding the external fuel tank during their preflight examination. After a review by the Mission Management Team, it was concluded that there was no debris issue regarding the crack, and the tank was safe to fly.
  • A problem with the switches associated with the crew hatch required a second and third hatch closure attempt. Hatch closure was completed and verified at 17:23 EDT (21:23 UTC).
  • The high-definition video camera used to inspect the shuttle from Kennedy Space Center during launch failed prior to liftoff. The launch team decided that the cameras on the external tank and the orbiter would be sufficient for observations, and went on to launch without it.
  • The final forecast predicted 80% go for launch weather.[21]
  • Launch Director Mike Leinbach conducted his T-9 poll, and declaredEndeavoura "go" for launch at 18:26 EDT (22:26 UTC).
  • Liftoff occurred at 18:36:42 pm EDT. (22:36:42 UTC)
  • Solid Rocket Boosterssuccessfully separated at 18:39 pm EDT (22:39 UTC).
  • Main Engine Cutoff occurred at 18:45:30 pm EDT (22:45:30 UTC)
  • External Tankseparation occurred at 18:45:45 pm EDT (22:45:45 UTC)

The primaryTALsite wasZaragoza Airportin Spain.

Following the procedures for post-ascent, the crew opened the payload bay doors, activated the Spacehab, powered up theRemote Manipulator System,and performed a variety of other payload activation procedures, before entering their scheduled sleep shift at 04:36 UTC (12:36 am EDT) August 9, 2007.

Thursday August 9 (Flight day 2)[edit]

The shuttle crew spent most of the day inspecting the outer hull and theheat shield.During the mission status briefing, Deputy Shuttle Program Manager (and Mission Management Team chairman) John Shannon reported that during launch, approximately nine pieces of foam were observed breaking off the external fuel tanks. Three of these struck the shuttle. All three strikes are considered to be minor in nature.[22]

Friday August 10 (Flight day 3)[edit]

Preliminary image of damage to the thermal protective tiles.

Endeavoursuccessfully docked with the International Space Station at 18:02 UTC (14:02 EDT). Approximately an hour before docking,Endeavourperformed the one-degree-per-second backflip, called theRendezvous Pitch Maneuver(RPM), so theISScrew members could take digital pictures of the heat shield of the orbiter. The images were then analyzed by NASA's Image Analysis Team, as well as the Mission Management Team to inspect the integrity of the orbiter's heat shield. Following a series of leak checks, the hatches were opened at 20:04 UTC (16:04 EDT), and theExpedition 15crew welcomed the STS-118 crew aboard the station.

After preliminary review of the photos taken by the Expedition 15 crew during the RPM, an area of interest was discovered on the underside of the Shuttle; an area behind the right landing gear door covered with blacksilicatiles.[23]The tile directly aft of the door had a 3.5 inches (8.9 cm) by 2 inches (5.1 cm) gouge in it. While the tile was penetrated, the underlying felt backing was not. NASA noted in the press conference that launch-time video confirmed a foam strike. This area is less critical than the leading-edgereinforced carbon-carbontiles that were damaged in theSpace ShuttleColumbiadisaster,but did cause concern for the Mission Management Team. A focused inspection was scheduled for August 12, 2007, to determine whether a patch attempt would be undertaken by the astronauts during anEVA.[24]NASA once reported that pieces of foam are bound to, and have fallen off of theexternal tankduring the eight and a-half-minute ride toorbit.An unprecedented 300 pieces of foam once struck the underside of anorbiterduring launch.

The crew activated theStation-to-Shuttle Power Transfer System(SSPTS) after docking.[25]The SSPTS transfers electrical power from the station to the shuttle, allowing the shuttle to conserve its own power generating resources. An extension of the mission from 11 to 14 days was dependent on proper operation of the SSPTS.

Saturday August 11 (Flight day 4)[edit]

Astronaut Rick Mastracchio works on the outside of theInternational Space Stationduring EVA 1 on August 11.

At 21:45 (UTC),Rick MastracchioandDave Williamsstarted the first EVA of the mission, installing theS5 trussto the station, increasing the total mass of the ISS to 232,693 kilograms (513,000 lb). The EVA duration was 6 hours and 17 minutes, and all objectives were successfully completed.

During the Mission Status press conference, Lead ISSFlight DirectorJoel Montalbano reported that the SSPTS was working well, and the recommendation to the Mission Management Team will be to extend the mission to the planned 14-day mission.

Mission Management Team chair John Shannon reported after additional analysis, it appeared that a piece of foam came off the external tank in the area of the tank's feed line, and bounced off a nearby strut, resulting in a hit to the orbiter's underside. An almost identical section of foam was lost onSTS-115,but did not strike the orbiter. John reported after further review of photos taken on flight day three, they do not feel the damage went all the way through the tile, but focused inspection is still planned for flight day five, and decisions would not be made until more information is obtained. Five specific areas will be inspected during focused inspection, and with the data gathered, thermal testing can be done to determine what actions, if any, need to be taken.

Overall, John Shannon classified the foam loss as a "concern", but only with regards to the history that the specific area has with regards to foam loss in past missions. Shannon reported that analysis would be complete by flight day 7 at the latest.

John Shannon also reported that the possible protruding gap filler noticed on flight day 3, was reviewed further, and was determined to be "shim stock", which will burn off in the upper atmosphere, and poses no issues for re-entry.

Sunday August 12 (Flight day 5)[edit]

High resolution image of thermal protective tiles taken during focused inspection on flight day five.

The crew carried out the focused inspection without any problems, and at 20:56 (UTC), the crews ofEndeavourand Expedition 15 were notified that the SSPTS was working as expected, and the mission was officially extended to the planned 14-day mission. Commander Scott Kelly replied, "That's great news, thanks".[26]

In the daily mission status briefing, Lead Flight Director Matt Abbott announced the official extension of the mission, that the SSPTS was working as planned, and they were pleased with the data gathered during the focused inspection on Sunday. Mission Management Team Chairman John Shannon confirmed the decision of the Mission Management Team to extend the mission to 14 days, and to add a fourth EVA, was unanimous. He noted that the addition of SSPTS will be a valuable new tool, providing not only extended missions, but also the ability to provide the space station with additional supplies of oxygen, water, and other resources.

Shannon reported on the focused inspection, confirming that good laser data and imagery was obtained, and they resolved several areas of interest, classifying them as of no concern. One area of interest was two adjacent thermal plates on the shuttle's underside that had a gouge that appeared to be deeper than would allow them to rule it out. NASA would use data from the focused inspection to model the area, and do thermal analysis of the area.[27]They will use the data to mimic the damage with sample tiles atJohnson Space Center,and using a variety of testing methods, possible courses of action would then be evaluated. No decision would be made until all data had been received and reviewed.

Shannon did report that following STS-118, NASA will do a thorough review of the history of foam loss from the area of the external tank sinceSTS-114,analysis and testing would be done, and any speculation as to a future course of action would not be made until all the information was available.

Monday August 13 (Flight day 6)[edit]

One of the retrieved MISSE experiments.

Rick Mastracchio and Dave Williams completed the mission's second spacewalk, successfully achieving all of the scheduled activities. During the EVA, they removed a new CMG fromEndeavour's payload bay, and moved it to theZ1 truss,where they removed the failed CMG. After installing the new CMG, they placed the failed CMG on an external stowage platform, where it will remain until it is returned to Earth with missionSTS-122.After initial testing on the ground, NASA reported the new CMG was functioning normally.[28]

During the EVA, Mastracchio reported an EVA suit alarm, indicating high levels ofCO
2
,but after reviewing all indicators and sensors, NASA confirmed it was an instrumentation issue, and the suit itself was fine. At the mission status briefing, NASA reported the suit would be used on future spacewalks, and the issue was not of any concern.[29]

During the Mission Management briefing, John Shannon discussedEndeavour's heat shield and re-entry issues. He reported that after initial modeling they believe the majority of heating will be on the backside of the gouge, and not into the filler bar side, which was the preferable situation. He reiterated that it was a complicated aerodynamic shape, and they wanted to be sure the flow would concentrate in the back "well" of the hole. The engineers and analysts would continue to do additional flow modeling, after which they would take the data into the arc jet testing facility for additional analysis. The first preliminary arc jet tests would be performed Monday night.

Shannon reported a "team four" had been assembled, along with the operations and engineering teams, to assist in data analysis. The teams will look at options for repair if required, and make recommendations to the Mission Management Team after the analysis of tests and data. Shannon stated he had no doubt that if a repair was required, the crew could execute it without significant impact to the mission timeline. He reiterated that this wasnota catastrophic damage situation, but simply a situation that they would prefer to fix if possible, similar to theOMSblanket issue during STS-117 in June 2007.[30]

There are three different on-orbit repair techniques available to the crew. Both post-ColumbiaReturn to Flight missions experimented with various repair materials and techniques, and the STS-118 crew has trained for those procedures.

Tuesday August 14 (Flight day 7)[edit]

Backdropped by Earth,Endeavour'sCanadarmmoves the external stowage platform (ESP-3).

TheEndeavourcrew awoke on Tuesday to the voices of Tracy Caldwell's family singing happy birthday to her. The two crews successfully removed the ESP-3 fromEndeavour's payload bay, and installed it onto theP3truss. They also continued with transfer activities, and several crew members took time out to have two Public Affairs events, one of them answering children's questions from the Discovery Center inBoise, Idaho.[31]During an interview with CBS, Commander Kelly stated that he was not concerned about the tile damage, and would be comfortable with any decision NASA made, "My understanding is this tile damage is not an issue of the safety of the crew... I'm not concerned with our safety."[32]The main reason for fi xing it, he noted, would be to assist with processing once the orbiter was back at the Kennedy Space Center.

During the Mission Management Team briefing, Kirk Shireman, Deputy International Space Station Program Manager, reported that the External Stowage Platform installation went well; the new CMG was working well, and handover of attitude control directly from the shuttle to the station was completed without problems. In addition, a new Russian computer was installed on the station, and testing of the system would be performed in late August. He also mentioned several of the experiments that were launched with STS-118, and reported all experiments were proceeding well. Shireman also noted that as of 15:17 UTC, theZaryamodule of the station had orbited the Earth 50,000 times.

John Shannon reported that the orbiter systems were in excellent shape, and had no issues. With regards to the remaining area of tile damage on the underside of the orbiter, Shannon reported that initial thermal analysis had been completed. Computational fluid dynamics testing atAmes Research Centerhad been done, and the preliminary results were "cautiously optimistic". Testing at the arc jet facility would continue Tuesday night. Shannon stated they would go through complete EVA scenario testing at theNeutral Buoyancy Lab,to help develop the EVA procedures if needed.

Wednesday August 15 (Flight day 8)[edit]

Mastracchio's damaged glove.

Rick Mastracchio and Clayton Anderson began the third EVA of the mission at 14:37 UTC. During the EVA, they successfully relocated a CETA Cart, retrieved the P6 Transponder, relocated the S-band antenna from P6 to P1, and installed a new S-Band Baseband Signal Processor and Transponder on the P1 truss. During a routine glove inspection, Mastracchio noticed a possible tear on the thumb of his left glove.[33]To be safe, NASA managers decided to end the spacewalk at 20:05, and examination and photography of the glove was performed during suit removal. The spacewalk accomplished all but one of the tasks (MISSE retrieval).[34]On the station, the crewmembers continued with transfer activities.

During the Mission Management Team briefing, Joel Montalbano reported that the issue with Mastracchio's suit was never a danger to the suit integrity, and the decision to cut the EVA short was one of precaution. Extended photography was performed, and additional analysis will be completed prior to the fourth EVA. Montalbano reported that the fourth EVA would be no earlier than August 18, 2007.[35]

Lead spacewalk officer Paul Boehm agreed that the EVA went well, the major objectives were completed, and he reiterated that at no time was Mastracchio's suit in any danger of leaking.

EVA Office Manager Steve Doering reported on the details regarding the issue with Mastracchio's glove. The EVA inspection procedure was implemented following STS-116, when a cut was found onRobert Curbeam's glove following an EVA. The EVA suit comprises five layers of material, and the second layer, calledvectran,is a high strength material resistant to tearing. Mastracchio's tear was into the vectran layer. Prior to the next EVA, video analysis will be done of the path Mastracchio took during the spacewalk in an attempt to discover where the tear may have occurred. An analysis of Mastracchio's glove during the previous two EVAs will also be performed.

John Shannon reported that no decision had been made regarding the tile damage on the underside of the orbiter, but the fourth EVA was postponed to at least August 18, 2007. The management team would continue to analyze the potential risks of repair to the underside of the orbiter, as well as any other areas of risk. Shannon reported the results of the arc jet testing showed some erosion into the backside of the adjacent tile upon re-entry, but the erosion did not go through the entire layer of the tile. Preliminary results were encouraging, but additional testing would be performed on Wednesday night. Shannon reported that the final decision would most likely be made on Thursday.[36]Shannon said "I am cautiously optimistic that repairs will not be needed".[37]

AstronautClay Anderson,Expedition 15flight engineer, uses a digital camera to expose a photo of his helmet visor during the mission's third EVA.

Thursday August 16 (Flight day 9)[edit]

The station and shuttle crews continued transfer activities on flight day 9, as well as EVA preparations, which includedTPSrepair procedure review, in case NASA decided a repair was necessary.[38][39]

Mission Specialists Barbara Morgan and Alvin Drew participated in an education event in the morning with students at theChallenger Center for Space Science EducationinAlexandria,Virginia.The event was hosted by Dr. June Scobee Rodgers, wife ofChallenger's commander,Dick Scobee,and Founding Chairman of the Challenger Center. Morgan and Drew also spoke to reporters from the Associated Press, Reuters and Idaho Public Television.[40]

During the interview with Reuters, Drew stated "We've been talking to the engineers who have been analyzing this far more than we have in space, and they seem to feel that the biggest danger is more to just being able to re-useEndeavouronce it gets back on the ground. They seem to be confident, and I trust their confidence that we can get home safely even with the divot that we have in the belly, "[41]Morgan added "We have a lot of faith in the program, and we'll do what the engineers decide is the best thing for us to do. We have all confidence we're going to be able to do the right thing."

At 01:00 UTC, August 17, 2007, CAPCOMShane Kimbroughnotified commander Kelly that the Mission Management Team decided that no repair to the damaged tile on the underside of the orbiter would be required.[42][43]

During the Mission Management Team briefing, John Shannon announced the team's unanimous decision that an EVA to repair the damaged tile was not required, and the tile damage on the underside of the orbiter was not a threat to crew safety. However, the spacewalk to repair the damage could pose a variety of risks, and those risks weighed heavily into the final decision. He noted the arc jet tests actually showed a higher degree of damage than the orbiter would sustain during re-entry, so the tests were helpful in showing the worst "possible" damage, and still did not damage the tile during testing enough to warrant repair.[44]

Shannon did note that the JSC Engineering Independent Group advised NASA managers that repairing the damage on-orbit could assist with mission turn-around time once the orbiter was on the ground. Shannon noted that the risks associated with in-flight repair outweighed the possible delay in processing the orbiter following the mission. He stated that normal turn-around time would not be compromised, as most orbiters have at least 60 tiles replaced after each mission, so the situation would not be any different from past missions.[45]

When pressed during the briefing by a reporter as to the chance of shuttle or crew loss, Shannon reported "I am 100 percent comfortable that the work that has been done, has accurately characterized the damage, and that we will have a very successful re-entry". He stated that over 200 people were involved in the decision, representing over 30 organizations, includingNASA Ames Research Center,NASA's Langley Research Center,Jet Propulsion Laboratory,KSC,JSC,and that all the groups combined came to the same decision.

Shannon reported that the glove issue encountered during EVA three had been discussed, and stated that analysis would be continued, in advance of EVA four on Saturday. The crew does have a spare set of gloves, if needed.

Shannon reported on a micro-meteoroid debris strike discovered on the commander's window of the orbiter, which was 1 millimeter in depth. Shannon noted that it was consistent with previous damage sustained on past missions. Analysis would be conducted regarding this issue, using photographs sent down by the crew early Thursday morning.

The final item discussed wasHurricane Dean,which was heading towards the Caribbean Sea, and projected to move into theGulf of Mexico.Contingency procedures and plans were in place, but Shannon did not anticipate it would affect the mission's timeline at all.

Friday August 17 (Flight day 10)[edit]

The station and shuttle crews had a relatively quiet day on flight day 10, continuing transfer operations, and doing some troubleshooting on a communication system between the shuttle and station. The two crews took some time out to have a joint news conference with US and Canadian news agencies, and took the official combined crew portrait.[46]When asked by reporters on the ground whether the crew agreed with NASA's decision to return without repairing the damage toEndeavour's underside, Commander Kelly replied, "We agree absolutely 100 percent with the decision to not repair the damage."[47]

During the mission status briefing, Lead Flight Director Matt Abbott discussed the ongoing preparations and plans with regards to Hurricane Dean, and reported NASA was watching the storm's track closely. If required, contingency plans are available. While the mission's timeline could be changed if required, no decision was made, and the mission was proceeding as planned.[48]

Deputy ISS Program Manager Kirk Shireman reported the S-Band system relocated during the third EVA was working well, and the SSPTS provided enough oxygen to be able to completely fill all reserves on the station. Shireman commented that transfer operations were approximately 75% complete.

EVA Office Manager Steve Doering reported on the decision to proceed with Saturday's EVA. The team analyzed the video downlinked from the third EVA, and the review showed no evidence of any specific event that would indicate a sharp edge, or excessive wear. A review of the manufacturing of the gloves was done, and no concerns were identified. The paths taken by astronauts during spacewalks were reviewed, identifying common paths between the third EVA, and Saturday's planned EVA, and the crew was notified of the common locations, to identify areas where additional glove inspections would be performed on Saturday. Overall, the final EVA would be less "hand-intensive" than the previous spacewalks, and the conclusion following the analysis was that Saturday's EVA would go ahead as planned.[49]

Saturday August 18 (Flight day 11)[edit]

Morgan and Caldwell pose for a tribute photo, holding a picture ofExpedition 15crewmembers, and behind them are tributes to their classmatePatty Hilliard Robertsonand theSTS-107crew.

NASA Managers decided overnight to shorten the fourth EVA by two hours as a precaution due toHurricane Dean's continued path into the Gulf of Mexico.[50]The EVA duration was five hours and 2 minutes, with a total EVA time of 23 hours and 15 minutes for the mission. The EVA accomplished three primary objectives, and one get-ahead task. Two tasks were deferred: plans to tie down debris shields on the Destiny lab, and relocation of a tool box.[51]During the spacewalk, Williams and Anderson got a good look at Hurricane Dean, and were both awed at the sight. "Holy smoke" was Anderon's initial comment. "Man, that's impressive", Williams replied. Anderson added "They're only impressive when they're not coming towards you."[52]Transfer activities were completed ahead of schedule, and both crews worked hard to get everything transferred back toEndeavourafter the spacewalk.

Dave Williams set two records during his third EVA; He is the Canadian with the most spacewalks (3); and he passed Canadian AstronautChris Hadfieldin total EVA time. Williams ended Saturday's EVA with a total of 17 hours, 47 minutes of extravehicular time.[53]

View of Hurricane Dean taken from the International Space Station during the fourth STS-118 EVA.

During the mission status briefing, Launch Integration ManagerLeRoy Cainreported that the Mission Management Team decided to take extra precautions in preparation for the storm, and STS-118 would be cut short a day.[54]In the event of a hurricane evacuation in Houston, an emergency command center would need to be set up. While it was a contingency set in place for years, NASA would prefer to avoid that situation. To that end, Cain reported the EVA was shortened, and the hatch closure would be done Saturday evening, rather than Sunday as planned. Undocking would be at 11:57 UTC Sunday, with the first KSC Landing opportunity on August 21, 2007.

At 19:46, a short farewell ceremony was performed, followed by hatch closure at 20:10 UTC. Tuesday's tentative KSC landing time would be 12:32 pm EST. (16:30 UTC)[55]

Sunday August 19 (Flight day 12)[edit]

The International Space Station moves away from Space ShuttleEndeavourduring STS-118

Endeavoursuccessfully undocked from the International Space Station at 11:56 UTC. Saturday, NASA managers decided the station fly-around that is normally performed following each mission would not be conducted in order to give the Shuttle crew more free time during flight day 12. After several long work days, the Mission Control team felt the crew needed some downtime before the landing process began.

After undocking, two 4-second firings of theReaction Control Systemwere performed, in order to distanceEndeavourfrom the station and move to a position above it. There, the crew deployed therobotic arm,beginning Late Inspection of the reinforced carbon-carbon tiles on the nose cap and wing leading edges.[56]

At the mission status briefing, Matt Abbott reported the undocking was "flawless", and the late inspection was completed successfully. Monday would be a standard pre-landing day, with checkout of the various systems onEndeavour,as well as an educational media event. Entry Flight Director Steve Stich and the entry team will take over mission duties tonight, in preparation for Tuesday's landing.

John Shannon reported the mission management team meeting went well. The landing plan was reviewed, and all teams reported "go" for landing on Tuesday. The latest track for Hurricane Dean was favorable for the Houston area; the storm seemed to be swinging farther south than originally expected. NASA managers were optimistic that contingency plans would not be needed. Final decisions regarding alternate plans would not be made until Monday, but Shannon noted thatWhite Sands Space Harborlanding facility would be removed as an alternate site.Edwards Air Force Base,and Kennedy Shuttle Landing Facility would be the two sites evaluated on Monday.

Monday August 20 (Flight day 13)[edit]

On Monday, with the shuttle approximately 68 miles (109 km) behind the International Space Station, the crew ofEndeavourperformed a variety of check-out tests in preparation for entry, configured the Spacehab module for entry, and did some last minute stowage. Kelly and Hobaugh worked with the shuttle landing simulator on board, practicing the anticipated landing tracks. Kelly, Williams and Morgan took some time out to talk to students at the Canadian school, La Ronge, in Saskatchewan.

During the mission status briefing, Entry Flight Director Steve Stich reported the track of Hurricane Dean would not require the activation of contingency plans, and the forecast looked favorable for a Tuesday landing at Kennedy Shuttle Landing Facility.[57]There were also two opportunities for a Florida landing, with the first opportunity beginning with a deorbit burn at 15:25 UTC, and landing at 16:32 UTC. The second opportunity would call for a deorbit burn at 17:00 UTC, with landing at 18:16 UTC. Weather was not expected to interfere with landing, with a forecast of high clouds, but no inclement weather. If the second landing opportunity was taken, the shuttle would fly directly over Hurricane Dean, although it would be well above any effects of the storm. NASA did plan to call up Edwards Air Force Base as the backup site, which had two opportunities on Tuesday, but the plan was to attempt a KSC landing, and if both opportunities were waved off, NASA would decide whether to wait a day, and try for a Wednesday landing at KSC. If Wednesday opportunities at Florida were waved off due to weather, a landing at Edwards Air Force Base would be attempted.[58]

Tuesday August 21 (Flight day 14, Landing)[edit]

Endeavourlanding at Kennedy Space Center.

The crew ofEndeavourwent right to work after waking up on Tuesday, completing the close-out of the Spacehab module, and getting into the deorbit preparations timeline.[59]They closed payload bay doors, transitioned the vehicle computers to landing software mode and donned their reentry suits. At 14:30 UTC, the crew was given the "go" to begin fluid loading. This was done to assist with the crew's ability to adjust to gravity, and to preventhypotensionafter landing. At 12:30 UTC, the Space FlightMeteorologyGroup reported to Entry Team Flight Director Steve Stich that the weather forecast was a "go". The weather at Kennedy Space Center showed only scattered showers moving away from the landing facility, and cross winds were not expected to be a problem. At 15:08 UTC, the crew was given a "go" for the deorbit burn, and the auxiliary power units were started at 15:20 UTC. The 4-minute engine burn was successfully completed at 15:28 UTC, slowingEndeavourby approximately 252 mph (406 km/h) and adjusting the orbiter's trajectory correctly for landing.

Radar acquisition ofEndeavourthroughMILAhappened at 16:19 UTC. At 16:20 UTC, the shuttle had passed the area of peak heating, with no issues reported on board. Main landing gear touchdown occurred at 16:32:16 UTC with nose gear touchdown at 16:32:29 UTC. The orbiter came to a complete stop at 16:33:20 UTC.[60]Upon wheel stop,CAPCOMChristopher Fergusontold the crew, "Congratulations, you've given a new meaning to the term 'higher education.'"[61]

Damaged tile in the belly ofEndeavourduring post-landing inspection.

Initial post-landing inspection of the orbiter showed very little additional damage to the thermal tiles affected by the foam strike during launch. Barbara Morgan did not exit the crew transport vehicle with the rest of the crew; she remained on board the vehicle to receive additional medical tests, and would return to the Astronaut Crew Quarters in that vehicle.[62]The remaining six crew members briefly examined the orbiter, doing the traditional post-flight "walkaround", posed for photos, and then returned to the crew quarters in theAstrovan.

During the post-landing briefing, NASA Administrator Michael D. Griffin reported that the International Space Station was approximately 60% completed following STS-118. Griffin also stressed the importance of space exploration, and added that the damaged tile on the underside of the orbiter did very well during re-entry.

Associate Administrator for Spaceflight OperationsWilliam H. Gerstenmaierreported the damage was actually less than what the arc jet testing produced, a situation that NASA anticipated, and managers had earlier stressed that arc jets show "worst possible" damage. Launch Director Mike Leinbach stressed how pleased he was with the mission, and with the condition of the vehicle following re-entry. He stated it was "one of the cleanest vehicles the managers have seen since the Return to Flight policies were implemented, if not the cleanest."

At the end of the briefing, Griffin commented to the media who focused on Barbara Morgan being the first "teacher in space", that Morgan was not technically a "teacher in space", nor was she an "educator astronaut". He stated she was accepted as a mission specialist, before the new class of mission specialist educators were selected in 2004, and NASA considers her to be a mission specialist, who was once a teacher.[10]However, NASA does refer to Morgan as a mission specialist educator in a number of interviews, so the terms seem to be interchangeable to most, if not to Griffin.

During the post-landing crew press conference, Kelly was asked "Did the tile damage enter your mind at all during re-entry, and what did you think about it once you got a look during the walkaround?" Kelly's reply was, "I thought about it, but only because I knew I'd be asked about it. I didn't worry about it at all. I was underwhelmed by it."[63]

Summarizing her thoughts on her time in space, Morgan commented,

"You know, there's a great sense of pride to be able to be involved in a human endeavor that takes us all a little bit farther, when you look down and see our Earth... and you realize what we are trying to do as a human race, it's pretty profound."[64]

Extra-vehicular activity[edit]

EVA Spacewalkers Start (UTC) End Duration Mission
EVA 1 Rick Mastracchio
Dave Williams
11 August 2007 16:28 UTC 11 August 2007 22:45 UTC 6 hours, 17 minutes S5 Installation, P6 Radiator retraction and cinch.
EVA 2 Rick Mastracchio
Dave Williams
13 August 2007 15:32 UTC 13 August 2007 22:00 UTC 6 hours, 28 minutes Failed CMG removal; new CMG installation.
EVA 3 Rick Mastracchio
Clayton Anderson
15 August 2007 14:37 UTC 15 August 2007 20:05 UTC 5 hours, 28 minutes S-Band Antenna Structural Assembly (SASA) relocation from P6 to P1, installation of S-Band Baseband Signal Processor and Transponder to P1, CETA Cart relocation and P6 Transponder retrieval.
EVA 4 Dave Williams
Clayton Anderson
18 August 2007 14:17 UTC 18 August 2007 19:19 UTC 5 hours, 2 minutes OBSS Boom Stand Installation; Retrieval of theMISSE-3 and 4 experiments; EWIS Antenna Installation; Secured Z1 SASA gimbal locks in preparation for down mass on 10A.

Wake-up calls[edit]

NASA began a tradition of playing music to astronauts during theGemini program,which was first used to wake up a flight crew duringApollo 15.Each track is specially chosen, often by their family, and usually has special meaning to an individual member of the crew, or is applicable to their daily activities.[65]

Flight Day Song Artist Played for Links
Day 2 "Where My Heart Will Take Me" Russell Watson Rick Mastracchio wavmp3
Day 3 "Mr. Blue Sky" Electric Light Orchestra Scott Kelly wavmp3
Day 4 "Gravity" John Mayer Charles O. Hobaugh wavmp3
Day 5 "Up!" Shania Twain Dave Williams wavmp3
Day 6 "Outa-Space" Billy Preston Alvin Drew wavmp3
Day 7 "Happy Birthday to You" Tracy's nieces and nephews Tracy Caldwell,for her 38th birthday wavmp3
Day 8 "Good Morning World" Adam, Barbara's son Barbara Morgan wavmp3
Day 9 "Times Like These" Foo Fighters Rick Mastracchio wavmp3
Day 9 "Black Horse and the Cherry Tree" KT Tunstall Tracy Caldwell wavmp3
Day 11 "Learn to Fly" Foo Fighters Al Drew wavmp3
Day 12 "Teacher, Teacher" 38 Special Barbara Morgan wavmp3
Day 13 "Flying" Long John Baldry Trio Dave Williams wavmp3
Day 14 "Homeward Bound" Simon and Garfunkel entire crew wavmp3


Contingency mission[edit]

STS-322was the designation given to theContingency Shuttle Crew Supportmission which would have been launched in the eventEndeavourhad become disabled during STS-118.[66]It would have been a modified version of theSTS-120mission, which would have involved the launch date being brought forward. If it had been needed, it would have been launched no earlier than September 22, 2007. The crew for this mission would have been a four-person subset of the full STS-120 crew.

Media[edit]

Launch of theSpace ShuttleEndeavourfromKennedy Space Centerin the mission STS-118

See also[edit]

References[edit]

Public DomainThis article incorporatespublic domain materialfrom websites or documents of theNational Aeronautics and Space Administration.

  1. ^NASA(2007)."STS-118 Mission Status Report #27".National Aeronautics and Space Administration.Archivedfrom the original on December 23, 2007.RetrievedNovember 26,2007.
  2. ^NASA (July 2007)."STS-118 Press Kit"(PDF).NASA.Archived(PDF)from the original on December 1, 2007.RetrievedAugust 22,2007.
  3. ^ab"ISS 13A.1 - Shuttle Endeavour (STS-118)".Space Newsfeed.Microcom Systems. August 12, 2007. Archived fromthe originalon September 27, 2007.RetrievedJune 6,2014.
  4. ^Gebhardt, Chris (June 29, 2010)."Structural Inspections Find Enterprise in Better Than Expected Condition".NasaSpaceFlight.Archivedfrom the original on July 3, 2010.RetrievedJuly 4,2010.
  5. ^Bergin, Chris (August 21, 2007)."Endeavour's performance during re-entry classed as phenomenal".NasaSpaceFlight.Archivedfrom the original on December 5, 2018.RetrievedAugust 22,2007.
  6. ^"NASA's Space Shuttle Processing Status Report".NASA. August 31, 2007.Archivedfrom the original on October 29, 2007.RetrievedSeptember 2,2007.
  7. ^"NASA Assigns Washington, D.C., Native to Upcoming Shuttle Mission".NASA. May 3, 2007.Archivedfrom the original on August 12, 2007.RetrievedAugust 13,2007.
  8. ^"NASA Educator Astronaut Program".NASA.February 1, 2004. Archived fromthe originalon February 27, 2004.RetrievedJune 6,2014.
  9. ^"STS-118 Mission Patch".NASA. 2007.Archivedfrom the original on November 21, 2007.RetrievedNovember 26,2007.
  10. ^abMichael Griffin, NASA TV STS-118 Post-Landing briefing.
  11. ^abMalik, Tariq (August 3, 2007)."Shuttle Endeavour's Stem-to-Stern Overhaul".Fox News.Archivedfrom the original on July 15, 2014.RetrievedAugust 24,2007.
  12. ^Boeing (May 3, 2007)."Vehicle Upgrades: Station-Shuttle Power Transfer System (SSPTS)".Boeing. Archived fromthe originalon March 18, 2007.RetrievedAugust 13,2007.
  13. ^Johnson Space Center (October 26, 2003)."NASA Presolicitation Notice: (SSPTS)".Johnson Space Center.RetrievedAugust 13,2007.[permanent dead link]
  14. ^NASA (December 2, 2005)."NASA's Space Shuttle Processing Status Report".NASA.Archivedfrom the original on December 8, 2007.RetrievedAugust 13,2007.
  15. ^NASA (May 1, 2007)."Biography of Barbara Morgan, first Mission Specialist Educator".NASA.Archivedfrom the original on October 2, 2007.RetrievedAugust 13,2007.
  16. ^NASA."Preflight Interview with Barbara Morgan".NASA.Archivedfrom the original on August 25, 2007.RetrievedAugust 13,2007.
  17. ^NASA."Second preflight Interview with Barbara Morgan".NASA.Archivedfrom the original on September 20, 2007.RetrievedAugust 13,2007.
  18. ^Halvorson, Todd (January 25, 2007)."Endeavour prepped for return to flight".Florida Today.Archivedfrom the original on June 6, 2011.RetrievedAugust 13,2007.
  19. ^NASA (July 26, 2007)."NASA Gives 'Go' for Shuttle Endeavour Launch on August 7".NASA.Archivedfrom the original on December 9, 2007.RetrievedAugust 13,2007.
  20. ^Harwood, William (August 3, 2007)."Shuttle launch postponed; Crew flies to Cape".Spaceflight Now.Archivedfrom the original on August 15, 2007.RetrievedAugust 3,2007.
  21. ^"Countdown on track; weather improves to 80 percent 'go'".CBS News.August 7, 2007.Archivedfrom the original on November 22, 2010.RetrievedAugust 29,2009.
  22. ^NASA (August 9, 2007)."STS-118 Status Report 03".NASA.Archivedfrom the original on December 9, 2007.RetrievedAugust 13,2007.
  23. ^NASA (August 31, 2000)."Space Shuttle Reference Manual – Thermal Protection System".NASA. Archived fromthe originalon July 15, 2009.RetrievedAugust 13,2007.
  24. ^Harwood, William (August 11, 2007)."Mission status briefing; tank appears to have performed well".CBS News.Archivedfrom the original on October 24, 2007.RetrievedAugust 11,2007.
  25. ^NASA."STS-118 Flight Day 3 Status Report".NASA.Archivedfrom the original on October 19, 2007.RetrievedAugust 11,2007.
  26. ^NASA."STS-118 Flight day 5 Status Report".NASA.Archivedfrom the original on November 23, 2007.RetrievedAugust 13,2007.
  27. ^Shannon, John."Image of area of interest on Endeavour".NASA.Archivedfrom the original on September 28, 2007.RetrievedAugust 12,2007.
  28. ^Shannon, John."Mission Status Briefing Graphics".NASA.Archivedfrom the original on November 23, 2007.RetrievedAugust 14,2007.
  29. ^Harwood, William (August 14, 2007)."New gyro installed; spacewalk ends".CBS Space News.Archivedfrom the original on October 24, 2007.RetrievedAugust 14,2007.
  30. ^Harwood, William (August 14, 2007)."Update: Shannon said tile damage not considered a threat to astronauts".CBS Space News.Archivedfrom the original on October 24, 2007.RetrievedAugust 14,2007.
  31. ^NASA (August 14, 2007)."STS-118 Status Report #13".NASA.Archivedfrom the original on August 23, 2007.RetrievedAugust 15,2007.
  32. ^Harwood, William (August 14, 2007)."Kelly downplays tile concern; Morgan said spaceflight worth the wait".CBS News.Archivedfrom the original on October 24, 2007.RetrievedAugust 14,2007.
  33. ^Boehm, Paul (August 15, 2007)."STS-118 Mission Status Briefing Graphics".NASA.Archivedfrom the original on September 28, 2007.RetrievedAugust 16,2007.
  34. ^Harwood, William (August 15, 2007)."Mastracchio cuts spacewalk short after noting glove damage".CBS.Archivedfrom the original on October 24, 2007.RetrievedAugust 15,2007.
  35. ^Montalbano, Joel (August 16, 2007)."Mission Status Briefing Graphics".NASA.Archivedfrom the original on November 22, 2007.RetrievedAugust 16,2007.
  36. ^NASA (August 16, 2007)."Status Report #15".NASA.Archivedfrom the original on October 20, 2008.RetrievedAugust 16,2007.
  37. ^Harwood, William (August 15, 2007)."Spacewalk No. 4 moved from Friday to Saturday; no decision yet on tile repair".CBS.Archivedfrom the original on October 24, 2007.RetrievedAugust 15,2007.
  38. ^Dunn, Marcia (August 14, 2007)."NASA studies shuttle repair options".Associated Press.RetrievedMay 13,2023.
  39. ^Malakoff, David (August 17, 2007)."NASA Nears Decision on Shuttle Repair".NPR.Archivedfrom the original on August 25, 2007.RetrievedAugust 17,2007.
  40. ^Austin Peterson, Liz (August 17, 2007)."NASA Optimistic No Shuttle Fix Needed".AP /Discovery News. Archived fromthe originalon September 4, 2007.RetrievedAugust 17,2007.
  41. ^Klotz, Irene (August 17, 2007)."Shuttle crew awaits word on heat shield work".Reuters.Archivedfrom the original on February 28, 2023.RetrievedAugust 17,2007.
  42. ^NASA (August 17, 2007)."STS-118 Mission Status Report #17".NASA.Archivedfrom the original on December 6, 2007.RetrievedAugust 17,2007.
  43. ^Chang, Kenneth (August 17, 2007)."NASA Rules Out Repair to Gouge in Shuttle".The New York Times.Archivedfrom the original on January 10, 2016.RetrievedAugust 17,2007.
  44. ^Shannon, John (August 17, 2007)."STS-118 Mission Status Briefing Graphics".NASA.Archivedfrom the original on November 22, 2007.RetrievedAugust 17,2007.
  45. ^Dunn, Marcia (August 17, 2007)."NASA Decides No Shuttle Repairs Needed".AP /Washington Post.Archivedfrom the original on November 2, 2012.RetrievedAugust 17,2007.
  46. ^NASA (August 17, 2007)."STS-118 Status Report #18".NASA.Archivedfrom the original on December 9, 2007.RetrievedAugust 17,2007.
  47. ^AP (August 16, 2007)."Astronauts relieved about skipping repairs".MyPlainView.Archivedfrom the original on December 5, 2022.RetrievedDecember 5,2022.
  48. ^Klotz, Irene (August 17, 2007)."Hurricane threat may bring shuttle home early".Reuters.Archivedfrom the original on February 28, 2023.RetrievedAugust 17,2007.
  49. ^NASA (August 18, 2007)."STS-118 Status Report #19".NASA.Archivedfrom the original on December 8, 2007.RetrievedAugust 18,2007.
  50. ^NASA (August 18, 2007)."STS-118 Mission Status Briefing Graphics".NASA.Archivedfrom the original on November 22, 2007.RetrievedAugust 18,2007.
  51. ^NASA (August 19, 2007)."STS-118 Status Report #21".NASA.Archivedfrom the original on October 20, 2008.RetrievedAugust 19,2007.
  52. ^Harwood, William."Astronauts marvel at Hurricane Dean".CBS News.Archivedfrom the original on October 24, 2007.RetrievedAugust 19,2007.
  53. ^Blatchford, Andy (August 19, 2007)."Astronaut Dave Williams sets Canadian record with third spacewalk".CanadaEast Telegraph-Journal.Archivedfrom the original on September 27, 2007.RetrievedAugust 19,2007.
  54. ^NASA (May 2007)."LeRoy E. Cain Biography".NASA.Archivedfrom the original on August 14, 2007.RetrievedAugust 18,2007.
  55. ^Dunn, Marcia (August 18, 2007)."NASA orders shuttle home 1 day early because of hurricane".Associated Press.Archivedfrom the original on September 7, 2008.RetrievedOctober 30,2008.
  56. ^Associated Press (August 19, 2007)."Shuttle heads home, aiming to beat storm".AP / NBC News.Archivedfrom the original on January 10, 2016.RetrievedAugust 19,2007.
  57. ^Austin Peterson, Liz (August 20, 2007)."Astronauts Prepare for Tuesday Return".San Francisco Chronicle/AP. Archived fromthe originalon December 20, 2007.RetrievedAugust 20,2007.
  58. ^NASA (August 20, 2007)."STS-118 Landing Ground Tracks".NASA.Archivedfrom the original on November 23, 2007.RetrievedAugust 20,2007.
  59. ^NASA (August 21, 2007)."STS-118 Status Report #26".NASA.Archivedfrom the original on September 4, 2007.RetrievedAugust 21,2007.
  60. ^NASA (August 21, 2007)."NASA STS-118 Landing Blog".NASA.Archivedfrom the original on November 4, 2007.RetrievedAugust 21,2007.
  61. ^Klotz, Irene (August 21, 2007)."Space shuttle Endeavour lands safely in Florida".Reuters.Archivedfrom the original on August 23, 2007.RetrievedAugust 21,2007.
  62. ^Harwood, William (August 21, 2007)."Shuttle Endeavour glides to smooth Florida landing".SR-77.CBS News.Archivedfrom the original on October 24, 2007.RetrievedAugust 21,2007.
  63. ^Chang, Kenneth (August 21, 2007)."Shuttle Glides Safely Home in Spite of Damage".The New York Times.Archivedfrom the original on January 10, 2016.RetrievedAugust 22,2007.
  64. ^Malik, Tariq (August 22, 2007)."Teacher-Astronaut, Crewmates Glad to be Home".Space.Archivedfrom the original on May 23, 2009.RetrievedAugust 22,2007.
  65. ^Fries, Colin (June 25, 2007)."Chronology of Wakeup Calls"(PDF).NASA.Archived(PDF)from the original on June 20, 2010.RetrievedAugust 13,2007.
  66. ^Bergin, Chris (April 15, 2007)."NASA sets new launch date targets through to STS-124".NASASpaceflight.Archivedfrom the original on March 3, 2016.RetrievedAugust 21,2007.

External links[edit]