Jump to content

Vermont Transit Corridor

From Wikipedia, the free encyclopedia

Vermont Transit Corridor
Overview
StatusPlanned
Service
TypeBus rapid transit
Rapid transit(future)
SystemMetro Busway
Route map

Vermont/Sunset
B Line
Vermont/Santa Monica
B Line
Vermont/Melrose
Vermont/Beverly
B Line
Vermont/3rd
Wilshire/Vermont
B LineD Line
Vermont/Pico
Vermont/Adams
Expo/Vermont
E Line
Vermont/Vernon
Vermont/Slauson
Vermont/Florence
Vermont/Manchester
Vermont/Century
Vermont/AthensParking
Vermont/120th St.

Handicapped/disabled accessAll stations are accessible

TheVermont Transit Corridoris a proposed 12.5-mile (20.1 km)bus rapid transitline in theMetroBuswaynetwork inLos Angeles, Californiawith plans to convert it torapid transitin the future. It is planned to operate on a north-to-south route onVermont Avenuebetween theB Line'sVermont/Sunset stationand theC Line'sVermont/Athens stationon theLos Angeles Metro Railsystem. The project feasibility study was released in February 2019 with a proposed completion date of 2028 for BRT and after 2067 for rail.[1][2]It is part of Metro'sTwenty-eight by '28initiative and is partially funded byMeasure M.[3]The route will have signal priority at traffic lights and will have a dedicated right of way. Metro reports the initial cost is $425 million.[3]

History

[edit]
Vermont between Wilshire and 6th, 2017

Until 1963, Vermont Avenue was served by severalLos Angeles RailwayYellow Carstreetcarlines: theF,K,R,S,U,andV.After streetcars ceased running under theLos Angeles Metropolitan Transit Authority,tracks were torn up, and buses replaced service.

As of 2020Vermont is the second busiest bus corridor in ridership, with 45,000 boarding per work day. Metro estimates this BRT will have 75,000-weekday boardings once completed. For that reason, light rail and subway options are also being developed. Metro is looking for ways to accelerate the option. Rail-based options are not scheduled to receiveMeasure Rfunds until after 2067.[1][2][non-primary source needed]

Initial Alternative Analysis

[edit]

Two alternative analyses were developed.

Bus rapid transit

[edit]

Metro currently plans to construct bus rapid transit with various stations along its route. Each will be spaced about one mile (1.6 km) apart. Metro will study three options for BRT:

  • "side running"
  • "side-center running"
  • A technical study will also look at an entirely "center-running" option.

These feasibility options were sent to formal environmental review status. Metro plans to commence the Draft Environmental Impact Report (DEIR) with the choices by 2019. Metro's planned budget for BRT is $425 million.

Rail

[edit]

For rail, concepts have been published in the feasibility study. Measure M funds for rail are expected to become available after 2067.[3]

The following concepts were published:

  • A light rail concept would cost $2.7 to 3.2 billion. Underground sections are required betweenWilshire BoulevardandGage Avenue.
  • A heavy rail concept would cost $3.7 to 4.4 billion with five new underground stations. A new junction and platform under Wilshire/Vermont station would make the line a continuation of the B Line. This would feature a one-seat underground ride from North Hollywood to South Los Angeles.

Route

[edit]

The corridor includes Vermont Avenue between Hollywood Boulevard and 120th Street.[3]Destinations along the route includeExposition Parkand its museumsLucas Museum of Narrative Art,theNatural History Museumand theCalifornia Science Center.Also, local sports stadiums, theLos Angeles Memorial ColiseumandBMO Stadium.USCis along the route. It would also connect with E Line atExpo/Vermont station.[4][non-primary source needed]

The following table shows potential BRT metro stations, per feasibility study from north to south. Also listed are existing light rail and subway stations.[4]

Station Options[2][5] Alt 1 BRT[4] Alt 2 LRT Alt 3 HRT Connecting
services[6]
Community Notes
Vermont/Sunset checkY - checkY B LineB Line Little Armenia,East Hollywood Existing subway station
Vermont/Santa Monica checkY - checkY B LineB Line Thai Town Existing subway station
Vermont/Beverly checkY - checkY B LineB Line Wilshire Center Existing subway station
Vermont/3rd St. checkY - - Koreatown
Wilshire/Vermont checkY checkY checkY B LineB Line
D LineD Line
Koreatown Existing subway station
Vermont/Pico checkY checkY checkY Pico-Union
Expo/Vermont checkY checkY checkY E LineE Line Expo Park,USC Existing light rail station
Vermont/Vernon checkY - -
Vermont/Slauson checkY checkY checkY South Los Angeles
Vermont/Florence checkY checkY -
Vermont/Manchester checkY checkY checkY Vermont Vista
Vermont/Century checkY checkY - Vermont Vista
Vermont/Athens checkY checkY checkY C LineC Line Athens/Vermont Vista Existing light rail station
Vermont/120th St. - checkY checkY Harbor Gateway,Los Angeles Southwest College/Vermont Vista

South Bay Extension

[edit]

Metro is also conducting a BRT, LRT, and HRT feasibility study to extend the route a further ten miles (16 km) past 120th Street south along Vermont Avenue toKen Malloy Harbor Regional Parkterminating atPacific Coast Highway.

Nearby destinations would includeLos Angeles Harbor College,Kaiser PermanenteSouth Bay Medical Center, andPacific Coast Highway station (J Line).

A feasibility study was conducted and released in 2023.[7]Metro staff recommended no further study be conducted. Incremental BRT and rail service was recommended once BRT or Rail service has begun on the full corridor.[8][9]

References

[edit]
  1. ^abTinoco, Matt (May 7, 2018)."A subway on Vermont? Metro is considering it".Curbed LA.RetrievedAugust 19,2020.
  2. ^abcNext stop: a new kind of bus ride on Vermont(PDF).Amazon News(Report). Metro.RetrievedAugust 19,2020.
  3. ^abcdCarino, Meghan McCarty (May 10, 2018)."A rail down Vermont would get high ridership. Why could it take 50 years?".89.3 KPCC.RetrievedJanuary 21,2021.
  4. ^abcVermont Transit Corridor –Rail Conversion/Feasibility Study FINAL REPORT(PDF)(Report). Metro. February 2019.
  5. ^Hymon, Steve (April 26, 2019)."Into the great wide open, Vermont BRT, bullet train: HWR, April 26".Metro. The Source.RetrievedAugust 19,2020.
  6. ^"Bus and Rail System Map"(PDF).Los Angeles County Metropolitan Transportation Authority.RetrievedDecember 3,2018.
  7. ^"Vermont Transit Corridor South Bay Extension Feasibility Study".
  8. ^https://boardarchives.metro.net/BoardBox/2022/220524_Vermont_Transit_Corridor-%20South_Bay_Extension_Feasibility_Study.pdf
  9. ^https://x /numble/status/1529936544332759043?ref_src=twsrc%5Etfw%7Ctwcamp%5Etweetembed%7Ctwterm%5E1529936544332759043%7Ctwgr%5E9ed756133cc5c9ea8739353f8b7b4626339a58b9%7Ctwcon%5Es1_&ref_url=https%3A%2F%2F redditmedia %2Fmediaembed%2Fuzts81%2F%3Fresponsive%3Dtrueis_nightmode%3Dfalse
[edit]