Jump to content

Wuxi Metro

From Wikipedia, the free encyclopedia
Wuxi Metro
Overview
Native nameVô tích tàu điện ngầm
LocaleWuxi,China
Transit typeRapid transit
Number of lines5 【A total of 11 routes are planned in the future】
Number of stations97
Daily ridership1,103,200 (31 December 2023), record paying[1]
Annual ridership184,600 million (2023)[2]
Websitehttp:// wxmetro.net/front/index.html
Operation
Began operationJuly 1, 2014;10 years ago(2014-07-01)[3]
Operator(s)Wuxi Metro Corporation
CharacterMostly underground, with some elevated alignment
Train length6–cars
Technical
System length145 km (90 mi)
Track gauge1,435 mm(4 ft8+12in)standard gauge
Electrification1,500 V DCthird rail

Wuxi Metrois therapid transitsystem ofWuxi,Jiangsuprovince,China.Line 1 began operations on 1 July 2014,[3]and Line 2 on 28 December 2014.[4][5]Line 3 opened on 28 October 2020. Line 4 opened on 17 December 2021.

Wuxi Metro (Wuxi Metro) is an urban rail transit system serving Wuxi City, Jiangsu Province, China. Its first line, Wuxi Metro Line 1, was officially opened for operation on July 1, 2014, making Wuxi the 22nd in mainland China. It is the third city in Jiangsu Province to open rail transit.

As of December 2021, there are 4 operating lines in Wuxi Metro, namely Wuxi Metro Line 1, Wuxi Metro Line 2, Wuxi Metro Line 3 Phase I, and Wuxi Metro Line 4 Phase I, all of which are metro lines covering Liangxi District, Binhu District, Xishan District, Xinwu District, and Huishan District are five municipal districts, with an operating mileage of 113.53 kilometers and a total of 85 stations.

As of December 2023, there are 4 lines under construction in Wuxi Metro, namely Wuxi Metro Line 4 Phase 2, Wuxi Metro Line 5 Phase 1, Wuxi Metro Line 6 Phase 1, S2, and S1.

In 2016, the annual passenger volume of Wuxi Metro was 81.468 million, with an average daily passenger volume of more than 223,200. In 2015, its annual passenger volume was 71 million, with an average daily passenger volume of more than 195,000. In the second half of 2014, its annual passenger volume was 17.7025 million, with an average daily passenger volume of more than 97,000. On February 10, 2024, the average daily passenger flow of Wuxi subway lines reached 1,233,400 passengers (but free), exceeding the previous record of 1,103,200 passengers (paying) on December 31, 2023, setting a new record high.

On February 16, 2024, the Wuxi subway network carried 1.4112 million passengers, a record high.[6]

Lines in operation

[edit]
Map of Wuxi Metro
Map of Wuxi Metro
Line Termini
(District)
Commencement Newest
Extension
Length
km
Stations
1 Yanqiao
(Huishan)
Nanfangquan
(Binhu)
2014 2019 34.6 27
2 Meiyuan Kaiyuan Temple
(Binhu)
Wuxi East Railway Station
(Xishan)
2014 26.3[7] 21[a]
3 Sumiao
(Binhu)
Sunan Shuofang International Airport
(Xinwu)
2020 28.5 21
4 Liutan Wuxi Taihu International Expo Center 2021 25.4 18
S1
Yanqiao Jiangyin Waitan 2024 30.4 km 10 [8]
Total 145 97
  1. ^Anzhen station is not opened.
Map of Wuxi Metro with lines under construction.

Line 1

[edit]

Line 1 runs north to south for 34.6 kilometers (21.5 mi) serving 27 stations. Most of the route is underground, with only 5 stations[3]and 7 kilometers (4.3 mi) running on an elevated alignment. CSR Zhuzhou supplied 23 six-car trainsets for the line.[9]

Line 2

[edit]

Line 2 runs east to west for 26.3 kilometers (16.3 mi)[7]with 21 stations (originally 22 stations, but Anzhen station is not opened), with 6.7 kilometers (4.2 mi) being elevated[7]and the remainder underground. CSR Puzhen supplied a fleet of 120m-long six-car Type B metro trains for the line.[5]

Line 3

[edit]

Line 3 runs east to west for 28.5 kilometers (17.7 mi) with 21 stations. The entire line is underground.

Line 4

[edit]

Line 4 is 25.4 kilometers in length with 18 stations. The entire line is underground.

Line S1

[edit]

Line S1of Wuxi Metro, also known asWuxi–Jiangyin intercity railway(Vô tích đến Giang Âm thành tế quỹ đạo giao thông) orXicheng line(Tích trừng tuyến) started construction on October 17, 2019.[10]It will be 30.4 km in length with 9 new stations, including 5 underground stations and 4 elevated stations. The line will run fromYanqiao stationonLine 1to Jiangyin Waitan station inJiangyin(acounty-level cityadministered byWuxi).[8]Line S1 willthrough-operatewithLine 1.[10]The line will have distinct express and local services.[11]

Under construction

[edit]
Wuxi Metro Urban Area Planning
S1
S2

Line S2

[edit]

Line S2of Wuxi Metro, also known asWuxi–Yi xing intercity railway(Vô tích đến nghi hưng thành tế quỹ đạo giao thông) orXiyi line(Tích nghi tuyến) is under construction.Yi xingis acounty-level cityadministered byWuxi.It will be 59.56 km in length fromYi xing railway stationto Taihu Xincheng station. Construction of the first phase (Yi xing railway station to Zhoutie, about 26 km) started in January 2023.[12]

Route Name Termini Planned Opening Length Stations Status Ref.
S2 Wuxi–Yi xing intercity railwayorXiyi line Zhoutie Yi xing Railway Station 2029 59.56 km 9 Under construction[12] [12]

Phase 3 construction plan (2021-2026)

[edit]

The Phase 3 construction plan (2021-2026) of Wuxi Metro will add 59.8 km of new lines and extensions.[13]

Route Name Termini Planned Opening Length Stations Status References
4 2nd Phase Wuxi Taihu International Expo Center Xishi Road 2025 12.4 km 8 Under Construction [13]
5 1st Phase Tangcheng Xinyun Road 2026 28.9 km 22 Under Construction [13]
6 1st Phase Gonghu Wetland Park Guangyuan Road 2028 22.3 km 16 Reviewing [13]

Long-term plans

[edit]

According to the long-term planning of Wuxi Metro, it will form a network of 8 lines and 1 branch line, S1, S2 and the network would be 350 km (220 mi) long in long-term planning.[13]

Lines 1, 2 and 3 would be the main lines, radiating from the city center, while Lines 4,5,6,7,8would be the tangential lines for suburb to suburb traffic. Environmentally friendly and energy efficient designs will be integrated into construction and design of the stations.[14][15][16]

Route Name Termini Planned Opening Length Stations Status References
2 Wuxi East Railway Station Anzhen
3 North extension Sumiao Tangpinghu 13.52 8
3 South extension Sunan Shuofang International Airport
(Xinwu)
Chang gian gdonglu
3 Branch line Sumiao Hudai
4 3rd Phase Xishi Road Yingyuehu Park
5 2nd Phase
6 2nd Phase Guangyuan Road Shixin Road 6.2 4
7 Planning North Yunlin Guansheshan
8 Planning Jinghui Temple Yanqiao
Wuxi Metro Overall Planning
[edit]

References

[edit]
  1. ^"Sina Visitor System".
  2. ^"Sina Visitor System".
  3. ^abcVô tích tàu điện ngầm 7 nguyệt 1 ngày khai thông toàn trường 29.42 km[Wuxi Metro with a total length of 29.42km opening July 1] (in Chinese). Jiangsu Real Estate Association. 27 June 2014.Retrieved2014-07-02.
  4. ^Barrow, Keith (31 December 2014)."Wuxi launches second metro line".International Railway Journal.Retrieved2015-01-15.
  5. ^ab"Chinese cities open 10 more metro lines".Railway Gazette International.31 December 2014.Retrieved2015-01-15.
  6. ^"Ngày hôm qua, lại sáng tạo cao! _ mênh mông hào · chính vụ _ mênh mông tin tức -The Paper".thepaper.cn.Retrieved2024-02-19.
  7. ^abc"Vô tích tàu điện ngầm 2 hào tuyến tạc thông xe 8 phút nhất ban".2014-12-29.
  8. ^ab"Vô tích đến Giang Âm thành tế quỹ đạo giao thông công trình 《 bước đầu thiết kế 》 hội báo kết thúc, vì bước tiếp theo thi công đồ thiết kế đánh hạ cơ sở".2019-07-08.
  9. ^"Wuxi metro begins trial operation".Railway Gazette International.29 May 2014.Retrieved2014-07-01.
  10. ^ab"Tích trừng S1 tuyến hôm nay chính thức khởi công!".2019-10-17.
  11. ^"Vô tích tàu điện ngầm s1 hào tuyến đoàn tàu tốc độ - vô tích bản địa bảo".m.wx.bendibao(in Chinese (China)).Retrieved2023-01-14.
  12. ^abc""Bốn tuyến bốn lộ" cộng kiến, vô tích tân một vòng trọng đại cơ sở phương tiện xây dựng ấn xuống "Nút tua nhanh"".Được biết, tích nghi S2 tuyến toàn dài chừng 58.44 km, toàn tuyến cộng thiết trạm 9 tòa. Lần này khởi công một kỳ công trình tổng thể đi hướng vì tự bắc hướng nam, đường bộ khởi tự ninh hàng cao thiết nghi hưng trạm, duyên đông cửu đại đạo, Thái Hồ đại đạo, Phạm Lãi đại đạo đặt, ngăn với chu thiết trấn, lộ tuyến toàn dài chừng 26 km
  13. ^abcde"Vô tích thị thành thị quỹ đạo giao thông đệ tam kỳ xây dựng quy hoạch ( 2021-2026 năm )"(PDF).Archived fromthe original(PDF)on 2021-11-24.
  14. ^"Wuxi metro".wuxinews.cn.Retrieved2017-03-22.
  15. ^Vô tích Tô Châu cũng đem quỹ giao thông hỗ? Trước mắt có quy hoạch nhưng thượng vô bảng giờ giấc.Eastday(in Chinese). 18 October 2013.Retrieved28 October2013.
  16. ^"Thượng Hải 11 hào tuyến, 17 hào tuyến có hi vọng nối đường ray Tô Châu S1 tuyến, 4 hào tuyến".sh.sina.cn.Retrieved2016-08-26.
[edit]