Yanfang line
Yanfang line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() A Yanfang line train between Magezhuang and Dashihedong | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | M25 South (planned name) Line 25 South | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Main line in operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Fangshan District Beijing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Beijing Subway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Yancun North | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 4-car Type B (DKZ76, SFM16) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 30 December 2017 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 14.4 km (8.9 mi) (main line)[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm(4 ft8+1⁄2in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 80 km/h (50 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Yanfang Lineof theBeijing Subway(Chinese:Bắc Kinh tàu điện ngầm yến phòng tuyến;pinyin:běijīng dìtiě yānfáng xiàn) is arapid transitline inBeijing.It was opened on December 30, 2017.
History[edit]
Construction of the Yanfang Line was scheduled to commence in September 2011 and be completed by 2013.[3]On October 17, 2011, the Ministry of Environmental Protection declined to approve plans for the line citing lack of approval for the project from theNational Development and Reform Commissionand uncertainenvironmental impactof the line on theSouth–North Water Transfer Projectwhich has a channel and reservoir in Fangshan District.[4][5]As a result, the onset of construction was delayed to at least the end of 2013.[5]
Construction on Yanfang Line was started in April 2014. The line was scheduled to open in 2017.[6]The line opened on December 30, 2017.
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Yancundong — Yanshan | 30 December 2017 | 14.4 km (8.95 mi)[2] | 9 | (main line) |
Route[edit]
![](https://upload.wikimedia.org/wikipedia/commons/thumb/0/0d/BJS_Yanfang_Line_Map.jpg/220px-BJS_Yanfang_Line_Map.jpg)
The line is projected to be Y-shaped, with the main line starting atYanshanand the branch line starting at Zhoukoudian Town. The two will merge atRaolefubefore terminating atYancundong.[3]Currently only the main line is operational, while the branch line is under planning.
Stations[edit]
Service routes |
Station Name | Connections | Nearby Bus Stops | Distance km[7] |
Location | |||
---|---|---|---|---|---|---|---|---|
English | Chinese | |||||||
● | ● | Yancundong | Diêm thôn đông | Fangshan | F43 F48 F49 F50 F57 F69 F78 | 0.000 | 0.000 | Fangshan |
● | ● | Zicaowu | Tử thảo ổ | 832 951 F13 F37 F70 | 1.541 | 1.541 | ||
● | ● | Yancun | Diêm thôn | 836 839 901 901 mau 917 934 952 F12 F18 F41 F76 F83 F85 nhanh chóng thẳng tới đường tàu riêng 86 | 1.210 | 2.751 | ||
● | ● | Xingcheng | Tinh thành | 831 836 839 901 901 mau 904 917 934 952 F12 F18 F41 F76 F83 F85 nhanh chóng thẳng tới đường tàu riêng 86 | 1.649 | 4.400 | ||
● | ● | Dashihedong | Tảng đá lớn Hà Đông | 831 836 839 901 917 F12 F18 F41 F47 F76 F83 F85 | 1.929 | 6.329 | ||
● | ● | Magezhuang | Mã các trang | 831 836 839 901 917 F12 F18 F19 F26 F30 F41 F47 F76 F80 F83 F85 nhanh chóng thẳng tới đường tàu riêng 86 | 2.087 | 8.416 | ||
● | ● | Raolefu | Tha Nhạc phủ | 831 836 839 901 917 F12 F18 F19 F26 F30 F41 F47 F76 F80 F83 F85 | 0.984 | 9.400 | ||
● | | | Fangshan Chengguan | Tường hồi nhà vùng sát cổng thành | 836 839 F15 F18 F20 F21 F22 F23 F24 F25 F26 F41 F56 F76 F77 F83 F85 | 1.777 | 11.177 | ||
● | | | Yanshan | Yến Sơn | 831 837 901 906 F11 F20 F21 F22 F23 F24 F25 F37 F38 F40 F47 F77 F80 | 2.076 | 13.253 | ||
● | Laochengqu | Khu phố cũ | Fangshan | |||||
● | Guce | Cố sách | ||||||
● | Zhoukoudian Town | Chu Khẩu Điếm trấn | ||||||
Rolling Stock[edit]
Model | Image | Manufacturer | Year Built | Amount in Service | Fleet Numbers | Depot |
---|---|---|---|---|---|---|
DKZ70 | ![]() |
CRRC Changchun Railway Vehicles | 2015 | 15 | YF 001–YF015 | Yancun North |
SFM16 | ![]() |
CRRC Qingdao Sifang | 2016 | 1 | YF016 |
Technology[edit]
The line is the first in Beijing to be capable of unattended train operations, and the first in China to exclusively use subsystems developed by domestic manufacturers.[8]
Future Development[edit]
The 6.1 km (3.8 mi) branch line of Yanfang line, fromRaolefu stationto Zhoukoudian Town station is under planning. Due to low passenger flow, the branch line will not be built in the short-term planning.[9] In addition, Beijing Subway is evaluating the possibile merge with theFangshan line.
References[edit]
- ^"Công ty giới thiệu".2019-11-27.
Trước mắt, phụ trách hoạt động thành phố Bắc Kinh quỹ đạo giao thông yến phòng tuyến, Bắc Kinh rầm rộ quốc tế sân bay tuyến (Currently operates Yanfang line and Da xing Airport Express of Beijing Subway)
- ^ab"Bắc Kinh tàu điện ngầm yến phòng tuyến thượng tuyến thí chạy".2017-02-17.
- ^abGong Zheng (Củng tranh) (6 January 2011).Chu Khẩu Điếm ba năm sau thông tàu điện ngầm.Beijing Daily.Retrieved8 September2011.
- ^Bắc Kinh quỹ giao yến phòng tuyến công trình nhân hoàn bình chưa quá bị kêu đình(in Simplified Chinese).SinaNews. 2011-10-18.
- ^abBắc Kinh tàu điện ngầm yến phòng tuyến hoặc năm nay đế khởi công(in Simplified Chinese). 2013-03-29.
- ^Yến phòng tuyến dự tính 2017 năm cuối năm khai thông - hôm nay đầu đề.toutiao.Retrieved2016-05-22.
- ^"Yến phòng đường bộ võng nhà ga trạm khoảng thời gian tin tức".Retrieved2020-04-29.
- ^"Beijing orders first driverless metro trains".12 August 2014.
- ^"Yến phòng tuyến chi nhánh tạm hoãn xây dựng, năm nay thượng nửa năm yến phòng tuyến tiến trạm lượng toàn lộ võng thấp nhất".2019-12-10.
![](https://upload.wikimedia.org/wikipedia/en/thumb/4/4a/Commons-logo.svg/30px-Commons-logo.svg.png)