The Official Website of the People’s Government of Hunan Province Mobile 中文 Français 한국어 日本語

15 July 2015

Home>Business>Projects for Investment

Hunan-Hainan Co-constructed Industrial Park Construction in Full Swing

2024-03-17 Download Print


The steel-structure united workshop of the Sany Hunan-Hainan Intellectual Industrial Park project in Hainan Province was capped on March 13. The project is located in the Gaopai Port Area of the Dongfang City Port Industrial Park, Hainan. It is a pioneering project within the inaugural zone of the Hunan-Hainan Cooperation and Co-construction Industrial Park. Aiming at high-level planning, high-standard construction, and high-quality management, it will be built into a model undertaking in the Hunan-Hainan Cooperation and Co-construction Industrial Park, making greater contributions to the collaborative development of Hunan and Hainan provinces. (Photo/Luo Xinguo, Hunan Daily)



A worker on the ground waved his arms to guide hoisting of the last part (24m*24m) of the space frames of the united workshop. The space frames have been assembled in parts on the ground before hoisting. (Photo/Luo Xinguo, Hunan Daily)



Workers hoisted the last part (24m*24m) of the space frames of the united workshop. The space frames have been assembled in parts on the ground before hoisting. (Photo/Luo Xinguo, Hunan Daily)



Workers were on standby at their respective position at a height of 13.4 meters above the ground, preparing for installing the last part (24m*24m) of the space frames of the united workshop. The space frames have been assembled in parts on the ground before hoisting. (Photo/Luo Xinguo)



A worker helped guide hoisting the last part (24m*24m) of the space frames of the united workshop. The space frames have been assembled in parts on the ground before hoisting. (Photo/Luo Xinguo, Hunan Daily)



A worker sitting high above the ground guided hoisting of the last part (24m*24m) of the space frames of the united workshop with sign language. The space frames have been assembled in parts on the ground before hoisting. (Photo/Luo Xinguo, Hunan Daily)



The last part (24m*24m) of the space frames of the united workshop has joined other parts gradually. The space frames have been assembled in parts on the ground before hoisting. (Photo/Luo Xinguo, Hunan Daily)

This article is from the Hunan Provincial Government www.enghunan.gov.cn.

Translator: Pang Yuehui

Chinese source: hunantoday